Fire pump calculator: the pump set NBC 2016 names, the head checks and the diesel fuel rule

Updated By Flamekite Editorial DeskFacts checked against official sources on

Fire pump calculation for your building: the main, diesel and jockey pumps NBC 2016 Table 7 names, IS 15301 head checks and the diesel fuel rule. Free.

Office of 15 m to 24 m
2,280 l/min
One electric and one diesel pump plus a jockey (Note 10)
Pump sets 
Shut-off head
120 percent
Of rated head at most (IS 15301 cl. 6.7)
Head limits 
Diesel fuel on hand
4 hours
Of running, no litre figure in the code
Diesel rules 
Head estimate (optional, from your designer's figures)

National model · NBC 2016 Table 7

1 electric and 1 diesel of 2,280 l/min, with a 180 l/min jockey

Main pump
2,280 l/min
1 electric
Standby
1 diesel
Same capacity as the main pump
Jockey pump
180 l/min
IS 15301 range 180 to 228 l/min
Terrace pump
None

The row says: A 2,280 litre a minute pump set (Note 10).

Counts filled from Table 7 Note 10, which the row cites: Note 14: one electric and one diesel of 1,620 l/min; Note 10 the same at 2,280; Note 11 two electric and one diesel at 2,280; each with a 180 l/min jockey.

Diesel fuel: Fuel for 4 hours of running without refilling, checked weekly (IS 15301 cl. 7.3.2); no litre figure is given.

Add a static head, friction loss and outlet pressure above for the rated head, the overload test point and the shut-off ceiling.

  • E above 15 m to 24 m: NBC 2016 Part 4, Table 7, Group E rowsNBC 2016, Table 7
  • Jockey pump 3 to 10 percent of installed pumping capacity, at least 180 l/min (IS 15301 cl. 6.5)IS 15301:2003
  • More than 65 percent of rated head at 150 percent of rated flow (IS 15301 cl. 6.7)IS 15301:2003
  • Shut-off head at most 120 percent of rated head; 140 percent of bowl head for a vertical turbine (IS 15301 cl. 6.7)IS 15301:2003
  • At most 700 kPa static in a hose with the nozzle shut (IS 3844 cl. 7.7); orifice plates on outlets above 400 kPa (cl. 7.8)BIS, IS 3844:1989
See the full table this row comes from

The code's pump set and clause figures, not a design. A fire engineer sizes the pumps by hydraulic calculation; the fire service approves them.

Quick answer

A building's fire pumps are read from the same NBC 2016 Part 4 Table 7 row as its tank. Low buildings get a terrace pump of 450 or 900 litres a minute; taller ones a pump-house set of 1,620, 2,280 or 2,850 litres a minute: an electric main pump, a diesel standby of the same size and a 180 litre a minute jockey. An office of 15 m to 24 m, for example, needs one electric and one diesel pump of 2,280 litres a minute.

The head comes from your design, not from a table. Enter the static head, friction loss and outlet pressure and the calculator adds them, then applies the only figures the codes fix: the 150 percent overload test, a shut-off of at most 120 percent of rated head and the 700 kPa cap in IS 3844. A diesel pump must carry fuel for 4 hours of running; no Indian code gives the tank in litres.

Fire pump calculation rules in IS 15301 and NBC 2016

The clauses the calculator applies, each with its number.
WhatThe ruleSource
Pump sizes in IS 15301450 and 900 l/min terrace pumps; 2,280, 2,850 and 4,500 l/min in the pump house; 6,700 l/min for special risks (cl. 6.1)IS 15301:2003
Standby pumpSame capacity as the main pump, on a diesel engine or another power source (cl. 3.8)IS 15301:2003
Jockey pump3 to 10 percent of installed pumping capacity, never below 180 l/min (cl. 6.5)IS 15301:2003
Overload dutyMore than 65 percent of rated head at 150 percent of rated flow (cl. 6.7)IS 15301:2003
Shut-off headAt most 120 percent of rated head; 140 percent of bowl head for a vertical turbine pump (cl. 6.7)IS 15301:2003
Diesel fuelEnough for 4 hours of running without refilling, checked weekly (cl. 7.3.2)IS 15301:2003
Table 7 pump notesNote 14: one electric and one diesel of 1,620 l/min; Note 10 the same at 2,280; Note 11 two electric and one diesel at 2,280; each with a 180 l/min jockeyNBC 2016, Table 7
Hydrants per setOne pump set per 100 hydrants, up to 2 sets (Table 7 Note 22)BIS, NBC 2016 Part 4

Fire pump capacity as per NBC 2016: every pump set in Table 7

Each pump set the Table 7 rows name, with the buildings that get it. Built from the same rows the calculator reads.
OptionMain and standbyJockeyBuildings (Table 7 rows)Source
No fire pumpExtinguishers onlyNoneA-3, A-4 above 45 m to 60 m; A-1 lodging below 15 m, up to 15 roomsNBC 2016, Part 4
450 l/min terrace pumpOne terrace pump on the down-comerNoneA-3, A-4 below 15 m; A-1 lodging below 15 m, 16 to 30 rooms; A-1 lodging below 15 m, over 30 rooms; A-5 below 15 m, no floor over 300 m²; B below 15 m; C-1 up to ground plus 1, with beds; D-1 to D-5 below 10 m, up to 300 persons; E below 10 m; F-1, F-2 below 15 m, ground plus 1, up to 500 m² in all; G-1, 100 to 500 m²; G-1, over 500 m², up to 15 m; G-2 up to 100 m²Rajasthan UDH
450 l/min terrace pump, basement onlyOnly with a basement over 200 m²NoneC-1 up to ground plus 1, no beds; G-1 up to 100 m²NBC 2016, Part 4
900 l/min terrace pumpOne terrace pump on the down-comerNoneB from 15 m to 24 m; C-1 ground plus 2 or more, no beds; D-1 to D-5 below 10 m, more than 300 persons; F-1, F-2 below 15 m, ground plus 1 over 500 m²; F-1, F-2 below 15 m, more than ground plus 1; H below 15 m, under 250 m²; G-2, 100 to 500 m²; G-2, 500 to 1,000 m², up to 15 m; G-3 up to 50 m²; G-3, 50 to 150 m²BIS, NBC 2016 Part 4
1,620 l/min pump-house setSize given; count as the approved plan statesNot stated in the rowA-5 below 15 m, a floor of 300 m² to 1,000 m²; A-5 below 15 m, a floor over 1,000 m²; G-3, 150 to 300 m²BIS, NBC 2016 Part 4
1,620 l/min pump-house set1 electric and 1 dieselOne of 180 l/minB above 24 m to 30 m; C-1 below 15 m on a plot over 1,000 m²; C-1 ground plus 2 or more, with beds; E above 10 m to 15 m; H below 15 m, over 250 m², ground floor only; G-1, over 500 m², above 15 mBIS, NBC 2016 Part 4
2,280 l/min pump-house setSize given; count as the approved plan statesNot stated in the rowG-3, over 500 m²BIS, NBC 2016 Part 4
2,280 l/min pump-house set1 electric and 1 dieselOne of 180 l/minA-3, A-4 above 35 m to 45 m; C-1 from 15 m to 24 m; D-1 to D-5 from 10 m to 15 m; D-1 to D-5 above 15 m to 24 m; E above 15 m to 24 m; F-1, F-2 from 15 m to 24 m; H below 15 m, over 250 m², ground plus 1; H below 15 m, over 250 m², more than ground plus 1; G-3, 300 to 500 m²NBC 2016, Part 4
2,280 l/min pump-house set2 electric and 1 dieselNot stated in the rowA-5 from 15 m to 30 m; A-5 above 30 m; C-1 above 24 m to 45 m; D-1 to D-5 above 24 m to 30 m; E above 24 m to 30 m; F-1, F-2 above 24 m to 30 m; G-2, over 1,000 m²BIS, NBC 2016 Part 4
2,850 l/min pump-house setSize given; count as the approved plan statesNot stated in the rowA-3, A-4 above 60 m; E above 30 mNBC 2016, Part 4
2,850 l/min pump-house set2 electric and 1 dieselNot stated in the rowA-6 five-star, any height; D-6 mall with cinema or food court, any heightBIS, NBC 2016 Part 4

How the fire pump calculator works, in 6 steps

  1. Pick the use and size

    Occupancy, height, floors and floor area choose one Table 7 row, the same row that sizes the fire water tank.

  2. Read the row's pump words

    The row names a terrace pump of 450 or 900 l/min, or a pump-house set, or no pump at all.

  3. Fill counts from the cited note

    Where a row gives only a note number, the calculator takes the counts from that note: Note 11, for example, is two electric and one diesel pump.

  4. Check the jockey

    IS 15301 asks 3 to 10 percent of the installed capacity, at least 180 l/min; the calculator shows that range beside the row's 180 l/min.

  5. Add your heads

    Static head, friction loss and outlet pressure are added as you enter them; 10 m of water is 1 kgf/cm², about 98 kPa.

  6. Apply the clause checks

    Overload at 150 percent flow, the shut-off ceiling, the 700 kPa and 400 kPa limits of IS 3844, and 20 percent more for a sprinkler pump.

Maharashtra Schedule-I fire pump sets

Maharashtra's 2023 Schedule-I keeps most national pump sets but drops some: a hotel below 15 m with floors over 1,000 m² gets one electric and one diesel pump of 2,280 l/min, and a warehouse under 1,000 m² a 1,620 l/min set.

Main and standbyJockeyBuildings (Schedule-I rows)
No fire pump MH Act 2023 Schedule-IExtinguishers onlyNoneA-1 lodging below 15 m
450 l/min terrace pump MH Act 2023 Schedule-IOne terrace pump on the down-comerNoneA-3, A-4 below 15 m; A-5 below 15 m, no floor over 500 m²; A-5 below 15 m, a floor of 500 m² to 1,000 m²; B below 15 m; F-1, F-2 below 15 m, ground plus 1, up to 500 m² in all
900 l/min terrace pump MH Act 2023 Schedule-IOne terrace pump on the down-comerNoneA-3, A-4 from 15 m to 35 m; A-1 lodging from 15 m to 35 m; B from 15 m to 24 m; F-1, F-2 below 15 m, ground plus 1 over 500 m²; F-1, F-2 below 15 m, more than ground plus 1
1,620 l/min pump-house set MH Act 2023 Schedule-I1 electric and 1 dieselOne of 180 l/minH below 15 m, under 1,000 m²
2,280 l/min pump-house set MH Act 2023 Schedule-I1 electric and 1 dieselOne of 180 l/minA-1 lodging above 35 m to 45 m; A-5 below 15 m, a floor over 1,000 m²; A-5 from 15 m to 30 m; F-1, F-2 from 15 m to 24 m
2,280 l/min pump-house set MH Act 2023 Schedule-I2 electric and 1 dieselNot stated in the rowA-5 above 30 m; F-1, F-2 above 24 m to 30 m
2,850 l/min pump-house set MH Act 2023 Schedule-I2 electric and 1 dieselNot stated in the rowA-6 five-star; D-6

Only the Schedule-I rows proof-read off the 2023 gazette images are shown. Offices, factories, hospitals and halls in Maharashtra are not, so the calculator says "ask us" for them.

Fire pump head and pressure limits in the codes

Six figures fix whether a pump's head is acceptable, from a shut-off of at most 120 percent to the 700 kPa hose cap. None of them is a head to design to: that comes from the building's hydraulic calculation.

  • 120 percent

    Most a horizontal pump's shut-off head may be of its rated head (IS 15301 cl. 6.7) IS 15301:2003

  • 140 percent

    The same ceiling for a vertical turbine pump, of rated bowl head (cl. 6.7) IS 15301:2003

  • 65 percent

    Least head, of rated head, at 150 percent of rated flow (cl. 6.7) IS 15301:2003

  • 700 kPa

    Highest static pressure in a hose with the nozzle shut, about 71 m of water (IS 3844 cl. 7.7) BIS, IS 3844:1989

  • 400 kPa

    Pressure above which outlets get an orifice plate, about 41 m of water (IS 3844 cl. 7.8) BIS, IS 3844:1989

  • 20 percent

    Margin a sprinkler pump must exceed the calculated flow and pressure by (IS 15105 cl. 12.1(e)) BIS, IS 15105:2021

Fire pump head calculation: 4 worked examples

Flamekite’s working from the official rules; no government publishes this figure.

Flamekite's arithmetic on the clauses above, with heads we chose for illustration. Your designer's figures replace them.

  1. Case 1

    A 20 m office on a 2,280 l/min set

    Static head 24 m, friction 12 m, 35 m wanted at the top outlet.

    What applies 71 m rated head, 7.1 kgf/cm² or about 696 kPa. The pump must give more than 46.2 m at 3,420 l/min, and its shut-off may reach 85.2 m, about 836 kPa: over the 700 kPa cap, so the lower outlets need pressure control. IS 15301:2003

  2. Case 2

    The same pump feeding sprinklers

    Heads of 18, 10 and 15 m at 2,280 l/min, sprinkler pump.

    What applies 43 m becomes 51.6 m at 2,736 l/min with the 20 percent margin. Shut-off at most 61.9 m, about 607 kPa: above 400 kPa, so orifice plates on the outlets that see it. BIS, IS 15105:2021

  3. Case 3

    Jockey for two 2,280 l/min pumps

    Installed capacity 4,560 l/min.

    What applies 3 percent is 137 l/min, under the 180 l/min floor; 10 percent is 456 l/min. Any jockey from 180 to 456 l/min meets IS 15301; Table 7 names 180. IS 15301:2003

  4. Case 4

    Diesel day tank for a 15 litre an hour engine

    The engine maker's fuel figure at rated load.

    What applies 4 hours of running is 60 litres on hand at all times. That is your arithmetic on the maker's figure; IS 15301 gives the hours, not the litres. IS 15301:2003

Terrace pump or pump-house set: which does your building get?

The row decides, but the pattern is plain: a pump house comes with the underground tank.

  1. IfFlats and hostels from 15 m to 35 m

    A 25,000 litre terrace tank and, in Maharashtra, a 900 l/min terrace pump on the down-comer; no pump house. MH Act 2023 Schedule-I

  2. IfFlats above 35 m to 45 m

    Electric and diesel pumps of 2,280 l/min and a 180 l/min jockey at a 75,000 litre underground tank. NBC 2016, Part 4

  3. IfOffices above 15 m to 24 m

    A 2,280 l/min set under Note 10: one electric, one diesel and the jockey. NBC 2016, Table 7

  4. IfOffices above 30 m, malls with cinemas, five-star hotels

    Pumps of 2,850 l/min; malls and five-star hotels two electric and one diesel. BIS, NBC 2016 Part 4

  5. IfA clinic of up to ground plus 1 without beds

    No pump unless a basement over 200 m²; then a 450 l/min terrace pump. NBC 2016, Part 4

Where the fire pump calculator stops

It gives a pump set only where a proof-read row holds the building, and head figures only where a clause states them.

  • If A row that names a size but no count

    Some rows say only "pumps of 2,850 litres a minute". The calculator shows the size and says the count is as your approved plan states. NBC 2016, Table 7

  • If A residual pressure at the remotest outlet

    No Indian code Flamekite has read gives one for internal hydrants; enter the figure your designer or fire service uses. BIS, IS 3844:1989

  • If Diesel tank size in litres

    IS 15301 and Maharashtra's Form B guidelines ask fuel for 4 hours of running, not a litre figure. Use the engine maker's consumption. MFS Form B guidelines

  • If A 1,620 l/min set

    Table 7 Note 14 uses it, but it is not one of IS 15301's listed sizes; the Table 7 note governs where your state applies the code. IS 15301:2003

  • If A building designed to NBCS 2026

    The 2026 standard sizes pumps by hydraulic calculation and protection level; it is voluntary until a state adopts it. BIS, SP 7:2026

Diesel fire pump fuel and engine rules

The diesel standby runs the system when the grid fails, so IS 15301 sets 5 rules for it.

Do

  • Keep fuel for 4 hours of running without refilling, of the right grade, and check it weekly (cl. 7.3.2). IS 15301:2003
  • Give the diesel its own panel, battery and charger, interlocked with the electric panel (cl. 5.3). IS 15301:2003
  • Start it weekly by cutting the power and run it 10 minutes (cl. 7.3.2). IS 15301:2003

Don’t

  • Do not leave the exhaust inside the pump house; take it out and discharge it high in open air (cl. 4.2). IS 15301:2003
  • Do not let the electric and diesel pumps run together; the interlock stops it (cl. 5.5). IS 15301:2003

Fire pump calculation myths

Four beliefs that size a pump wrongly.

  • You may have read

    There is a formula for fire pump capacity in the NBC.

    Myth

    What the sources say

    Table 7 names fixed sets of 1,620, 2,280 or 2,850 l/min by building; the calculation is for the head, not the flow. NBC 2016, Table 7

  • You may have read

    The jockey pump must be 180 l/min.

    Myth

    What the sources say

    180 l/min is the floor. IS 15301 allows 3 to 10 percent of installed capacity, so 180 to 456 l/min for two 2,280 l/min pumps. IS 15301:2003

  • You may have read

    A bigger shut-off head is safer.

    Myth

    What the sources say

    IS 15301 caps it at 120 percent of rated head, and IS 3844 caps a shut hose at 700 kPa. BIS, IS 3844:1989

  • You may have read

    The diesel tank is a fixed 200 or 500 litres.

    Myth

    What the sources say

    No Indian code read gives litres; IS 15301 asks 4 hours of running, so the size follows the engine. IS 15301:2003

Fire pump set price from an official schedule of rates

Flamekite’s working from the official rules; no government publishes this figure.

Maharashtra PWD's Current Schedule of Rates 2018-19 prices pumps supplied, erected, tested and commissioned, GST extra. It has no diesel engine set or pump panel line.

As published

2018 rates for Maharashtra government works, with a location uplift outside district headquarters; not a quote. The cost estimator prices a whole bill of quantities from the same schedule.

Questions about fire pump calculation

What is the fire pump capacity as per NBC?

NBC 2016 Table 7 names a set per building: a 450 or 900 l/min terrace pump for low buildings, and pump-house sets of 1,620, 2,280 or 2,850 l/min with a diesel standby and a 180 l/min jockey for taller ones. An office of 15 m to 24 m gets one electric and one diesel pump of 2,280 l/min.

How is fire pump head calculated?

Add the static head from the pump to the highest outlet, the friction loss at the design flow and the pressure wanted at the outlet. Then check it: more than 65 percent of that head at 150 percent flow, and a shut-off head of at most 120 percent.

How do you work out fire pump LPM?

For a hydrant system the Table 7 row fixes the LPM: 1,620, 2,280 or 2,850 for the pump house. A sprinkler pump is sized by hydraulic calculation and must exceed the calculated flow by at least 20 percent (IS 15105).

What diesel tank capacity does a fire pump need?

Enough fuel for 4 hours of running without refilling (IS 15301 cl. 7.3.2). No Indian code read gives litres: multiply the engine maker's consumption in litres an hour by 4.

What is the jockey pump capacity for a fire pump?

3 to 10 percent of the installed pumping capacity, never below 180 l/min (IS 15301 cl. 6.5). Table 7's sets use 180 l/min.

How many fire pump sets does a building need?

One set, and NBC 2016 Note 22 asks one set per 100 hydrants, up to 2 sets. The bigger rows name two electric pumps and one diesel.

Keep reading

Free tools for this

Words on this page, explained

Sources

Each source was opened and read on the date shown. How Flamekite checks its sources

  1. Bureau of Indian Standards (copy published by Public.Resource.Org): IS 15301:2003, Installation and Maintenance of Fire Fighting Pumps, Code of Practice (Fire Fighting Sectional Committee CED 22, April 2003, reaffirmed): clauses 3 to 7, pump house, panels, capacities, suction, performance and maintenance (opens in a new tab)checked 29 October 2026
  2. Bureau of Indian Standards: IS 3844:1989, Code of Practice for Installation and Maintenance of Internal Fire Hydrants and Hose Reels on Premises (first revision, reaffirmed 2020); free download after registration; clause numbers cited on the page (opens in a new tab)checked 26 October 2026
  3. Bureau of Indian Standards: IS 15105:2021, Design, Installation and Maintenance of Fixed Automatic Sprinkler Fire Extinguishing Systems, Code of Practice (first revision), July 2021; free download after registration; clause and table numbers cited on the page (opens in a new tab)checked 26 October 2026
  4. Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016, Part 4, Table 7 Minimum Requirements for Fire Fighting Installations: every row, Groups A to J, and Notes 1 to 24, printed pages 41 to 51, read off the page images (opens in a new tab)checked 25 October 2026
  5. Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 National Building Construction Standards 2026, Part F: Fire and Life Safety (opens in a new tab)checked 25 October 2026
  6. Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016, Part 4: Table 7 rows (d) hotels (A-5) and (e) hotels (A-6) with Notes 1 to 15, clause 4.10.1 (Fire Officer for starred hotels) and clause 6.1.1.4 (Subdivision A-5), read off the page images (opens in a new tab)checked 25 October 2026
Show all 16 sourcesShow fewer
  1. Government of Maharashtra (gazette copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023, substituted Schedule-I: rows (a) lodging and rooming houses (A-1) and (c) hotels (A-5), with Notes 3(d), 4, 5 and 10 (read off the page images, pp. 13 to 16, 32 and 33) (opens in a new tab)checked 25 October 2026
  2. Government of Maharashtra (gazette copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023, substituted Schedule-I: minimum fire fighting installations for apartment houses (A-4) by height, with Notes 1, 4, 6, 10, 11 and 15 (read off the page images, pp. 13 to 15 and 32 to 34) (opens in a new tab)checked 25 October 2026
  3. Government of Maharashtra (gazette copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023, substituted Schedule-I: rows (c) hotels (A-5) and (d) hotels (A-6), gazette pages 16 and 17 (read off the page images) (opens in a new tab)checked 25 October 2026
  4. Bureau of Indian Standards (copy hosted by Puducherry Fire Service): National Building Code of India 2016, Volume 1, Part 4 Fire and Life Safety: Table 7, Minimum Requirements for Fire Fighting Installations, and its notes 6 to 24 (read from the page images) (opens in a new tab)checked 25 October 2026
  5. Bureau of Indian Standards (copy hosted by Puducherry Fire Service): National Building Code of India 2016, Part 4, Table 7: business (E) and mercantile (F) rows and Notes 4, 6, 10 to 12, 14 and 16, printed pages 46, 47 and 51 (read off the page images) (opens in a new tab)checked 25 October 2026
  6. Maharashtra Fire and Emergency Services: Guidelines for Form B, Annexure A: to be followed by licensed agencies issuing Form B under section 3(3) and rule 4(2) (circular of 7 July 2026) (opens in a new tab)checked 25 October 2026
  7. Public Works Department (Electrical Wing), Government of Maharashtra (copy hosted by Chhatrapati Sambhajinagar Municipal Corporation): Current Schedule of Rates 2018-2019 (in force from 12 September 2018), chapter 13 Fire Fighting and Fire Alarm System: items 13-1-1 to 13-10-3 (fire pumps, jockey and booster pumps, GI pipe, valves, hydrant valves, hose reels, hoses, branch pipes, fire brigade inlets, cabinets, conventional fire alarm, PA system and sprinkler items), rates per unit before GST, printed pages 223 to 231 (opens in a new tab)checked 28 October 2026
  8. Urban Development, Housing and Local Self Government Departments, Rajasthan: Joint order No. P.11(9)UDH/2020 Part, 14 September 2023, on the fire safety certificate and fire NOC (18-page Hindi scan) (opens in a new tab)checked 25 October 2026
  9. Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016, Part 4: clause 3.1.3 (Group B, B-1 and B-2), Table 7 educational rows and Notes 4, 6, 14 and 16, clause 6.2 (educational buildings); Table 7 read off the page-43 image (opens in a new tab)checked 25 October 2026
  10. Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016, Part 4: Table 7 industrial buildings (Group G) rows G-1 to G-3 and Notes 4 to 24, read off the page images, pp. 47 to 51 (opens in a new tab)checked 25 October 2026