High-rise building: the height line in NBC 2016, NBCS 2026 and every state
Updated By Flamekite Editorial DeskFacts checked against official sources on
Quick answer
A high-rise building is one 24 m or above in height, whatever its use, under the National Building Construction Standards 2026 (SP 7:2026, Part F, clause 2.39). NBC 2016, withdrawn on 30 April 2026, used 15 m (Part 4, clause 2.38).
Neither number decides your fire NOC by itself. Your state's fire act, rules or bye-laws set the line, and on 24 October 2026 those lines ran from 14.5 m in West Bengal to more than 30 m in Madhya Pradesh. Most states still use 15 m; Andhra Pradesh and Tripura use 24 m, and Telangana uses 24 m for residential apartments only.
Free, on WhatsApp. Or check if you need one
High-rise building at a glance
| What | The rule | Source |
|---|---|---|
| Definition now | A building 24 m or above in height, irrespective of its occupancy (NBCS 2026, Part F, clause 2.39) | BIS, SP 7:2026 |
| Definition until 30 April 2026 | A building 15 m or above in height, irrespective of its occupancy (NBC 2016, Part 4, clause 2.38) | BIS, NBC 2016 Part 4 |
| How height is measured | To the floor of the last occupiable floor, from the grade where the fire tender stands (NBCS 2026, clause 2.6) | BIS, SP 7:2026 |
| Legal force | None by itself: Part F is guidance for state governments and local authorities, which may change its thresholds | BIS, SP 7:2026 |
| Who sets the binding line | The state: fire services are a state subject and a municipal function (Article 243W, Twelfth Schedule) | Legislative Department, Ministry of Law and Justice |
| Model Fire Bill line | Fire safety certificate for buildings above 15 m (Revised Model Bill 2019, section 24(3)) | DGFS, MHA |
| State lines found | From 14.5 m (West Bengal) to more than 30 m or 10 storeys (Madhya Pradesh); 2 of 36 states and UTs publish no line Flamekite could find | Indian Kanoonnews report |
| States at 24 m | Andhra Pradesh (stilt included), Tripura, Mizoram (signed, not yet gazetted) and Telangana for residential apartments | Directorate of Fire and Emergency Services, Tripura |
| Extra rules NBCS 2026 attaches | Annex D: firefighting shafts, refuge areas above 24 m, at least 2 staircases, construction-stage fire water | BIS, SP 7:2026 |
| Last verified | 24 October 2026, against BIS texts and state acts, rules, bye-laws and circulars | Not stated |
High-rise building in NBC 2016 and NBCS 2026
| Option | NBC 2016 (SP 7:2016), Part 4 | NBCS 2026 (SP 7:2026), Part F | Source |
|---|---|---|---|
| Definition clause | 2.38: 15 m or above, irrespective of occupancy | 2.39: 24 m or above, irrespective of occupancy | BIS, SP 7:2026 |
| Status on 24 October 2026 | Withdrawn by BIS on 30 April 2026; still named in some state rules | Current, voluntary and non-binding | Gazette of India |
| Where the fire chapter applies | Clause 1.2: all high-rise buildings, plus special buildings such as schools and hospitals of 9 m, assembly buildings and floors over 500 m² | Clause 1.2: a height or floor area per occupancy, from 9 m for schools to 24 m for homes | BIS, NBC 2016 Part 4 |
| Residential trigger | 15 m, as a high-rise | 24 m or 750 m² | BIS, SP 7:2026 |
| Hospitals and custodial buildings | 9 m and above, as special buildings | 15 m or 500 m² | BIS, NBC 2016 Part 4 |
| Height limits by construction type | Heights and areas limited by occupancy and construction type (the then Table 2) | Height restrictions eliminated | BIS, SP 7:2026 |
| Refuge areas | Introduced for apartment buildings of 60 m and above | In buildings over 24 m, at or just above 24 m and then about every 15 m, unless refuge spaces are planned | BIS, SP 7:2026 |
| Wording | "shall" | "should" | The Times of Indianews report |
How to find the high-rise building line that applies to you
Measure the height the way your rules do
Most rules measure to the last occupied floor, not the roof, and some count the stilt floor. Note both the height in metres and the number of floors above ground.
Find your state in the matrix below
Read whether the state's number is a definition of high-rise, a fire NOC trigger or a risk class. A building can be under the high-rise line and still need a NOC.
Read the instrument's own words
Open the act, rule or bye-law named in the matrix. Check whether it says "above", "or above" or "exceeding": a building of exactly 15 m or 18.3 m depends on it.
Check your city's development rules
Building bye-laws often carry their own definition, as in Kerala's rule 80, Tamil Nadu's rule 2(58) or Meghalaya's A2.30, and the plan sanction follows them.
Confirm with the fire service in writing
Where the act and the bye-laws give different lines, as in Karnataka, ask the fire officer which one your file will be judged against before you fix the drawings.
High-rise building height in every state and UT
Flamekite read the line in all 36 states and union territories. 13 define a high-rise building; most others set a fire NOC height instead. Two publish neither in a text Flamekite could find.
| Height line | What the number is | Where it is written | |
|---|---|---|---|
| Andhra Pradesh G.O.Ms.No.273 | 24 m or more, stilt floor included | Definition | AP Building Rules as amended by G.O.Ms.No.273 of 19 December 2025 |
| Arunachal Pradesh Government of Arunachal Pradesh | Not found | None found | Fire and Emergency Services Act 2026 (Act 12 of 2026) |
| Assam Assam Act XIII of 2026 | 15 m until 14 August 2026; now left to the Government, with no notification found | Definition, now delegated; Schedule I still treats 15 m and above as high risk | Act LIII of 2025, section 2(oo), amended by Act XIII of 2026 |
| Bihar Bihar Rules 2021 | 15 m and above | Fire NOC trigger for multi-storey buildings | Fire Service Rules 2021, rule 15, clause (i) |
| Chhattisgarh Home Department, Chhattisgarh | Above 15 m, or ground plus 4 floors | Fire NOC trigger for residential buildings | Section 14(1) notification of 29 November 2022, class 2 |
| Goa DFES Goa charter | More than 15 m | Fire NOC trigger; 14.2 m survives only as a fee class | Section 13 notification of 17 December 2014 |
| Gujarat Gujarat Fire Safety Compliance Portal | 15 m and above for flats, hostels and dormitories | Fire safety certificate trigger | Regulations 2023, Third Schedule, Table 1 |
| Haryana Government of Haryana | No height in the Act; homes up to 16.5 m are excepted | Fire NOC trigger for all other high-rises | Act 14 of 2022, section 18(2)(a) |
| Himachal Pradesh Department of Fire Services, Himachal Pradesh | Above 15 m | Fire NOC trigger on building plans | Fire Fighting Services Act 1984, section 15-A |
| Jharkhand Indian Kanoonnews report | 16.40 m; 15 m for fire regulation | Definition of multi-storey or high-rise building | Building Bye-laws 2016, clause 2.94 |
| Karnataka Government of Karnataka | 21 m or above, any occupancy | Definition in the Act; Seva Sindhu lists above 15 m | Fire Force Act, section 13(3), 2023 amendment |
| Kerala KMBR 2019 | 16 m or more, or more than 4 floors above basements | Definition | Kerala Municipality Building Rules 2019, rule 80 |
| Madhya Pradesh MP Town Planning | More than 30 m or more than 10 storeys | Definition; fire drawings already due above 12.5 m | Bhumi Vikas Rules 2012, rules 2(38) and 87(2) |
| Maharashtra MCGM BRC 69 | No statewide definition read; Mumbai splits at 32 m | Fee class; residential above 70 m is a section 45 high-risk building | MCGM BRC 69 of 2026-27; Amendment Act 2023 |
| Manipur Manipur UBBL 2024 | Over 15 m, or 17.5 m with stilts | Definition in the bye-laws; the 2026 Act covers homes over 15 m or ground plus 4 | Unified Building Bye-Laws 2024, bye-laws 6(2)(a) and 51 |
| Meghalaya Bye-Laws 2021 | Exceeding 15 m, any occupancy | Definition | Building Bye-Laws 2021, A2.30 |
| Mizoram Mizoram Home Dept | 24 m and above; 15 m in the 2019 rule | Definition in a rule signed 20 August 2026, in force once gazetted | Notification B-20011/2/2026-HM(F&ES) |
| Nagaland Directorate of Fire and Emergency Services, Nagaland | Above 15 m | Fire NOC trigger for multi-storey buildings | Fire and Emergency Services Act (Act 5 of 2023) |
| Odisha Odisha Rules 2019 | 15 m and above for residential buildings | Fire NOC class | Fire Prevention and Fire Safety Rules, rule 9(1), 2019 amendment |
| Punjab Punjab Gazette | No height definition found; up to 17.5 m with stilt parking counts as low-rise | Relief line for independent floors | Fire and Emergency Service Act 2024, section 24(2) |
| Rajasthan Rajasthan UDH | Above 15 m, every use | Multi-storey and high-risk class | Model Building Regulations 2025, regulation 14.5 |
| Sikkim Government of Sikkim | Above 15 m from plinth | Fire certificate trigger; commencement not found | Fire and Emergency Services Act 2023 |
| Tamil Nadu TNCDBR 2019 | Exceeding 18.30 m | Definition; the Director clears these as Multi Storied Buildings | Combined Development and Building Rules 2019, rule 2(58) |
| Telangana TGFD circular 3455 | 24 m and above for residential apartments, from 7 October 2026 (18 m before); more than 15 m for commercial buildings | Provisional fire NOC trigger | Circular Rc.No.3455/MSB/2026 |
| Tripura Directorate of Fire and Emergency Services, Tripura | 24 m or more, any occupancy | Definition | Fire Safety Rules 2026, rule 2(49) |
| Uttar Pradesh UP Act 16 of 2022 | More than 15 m | Fire safety certificate trigger for multi-storied buildings | Act 16 of 2022, section 26(3)(i) |
| Uttarakhand Uttarakhand Gazette 2022 | 12 m and above for homes (15 m before 2022) | Fire NOC trigger | Act No. 06 of 2022, section 15(4) |
| West Bengal Indian Kanoonnews report | 14.5 m or more | Definition; every high-rise is a high-risk building | Fire Services Act 1950, section 2(ha) |
| Andaman and Nicobar Islands Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026 | Above 15 m | Fire certificate trigger; commencement not found | Regulation 5 of 2026 |
| Chandigarh Gazette of India | High-rises except homes up to 16.5 m; height alone is not a limiting factor | Fire certificate trigger | Haryana Act as extended by S.O. 2264(E) of 6 May 2026 |
| Dadra and Nagar Haveli and Daman and Diu Gazette of India Extraordinary | Above 15 m | Fire certificate trigger | Regulation 6 of 2026, section 29(2), in force 7 July 2026 |
| Delhi DFS | Over 15 m or 5 storeys for homes; over 12 m for hotels | Fire NOC trigger; stilt and mezzanine floors count as storeys | Fire Service Rules 2010, Rule 27, as amended in 2025 |
| Jammu and Kashmir J&K Gazette | Higher than 15 m, or above 17.5 m with stilts; tall above 50 m | Definition | Unified Building Bye-Laws 2021, chapter 9 |
| Ladakh Gazette notification S.O. 140 | Up to 15 m and above 15 m | Requirement tables split at this height | Fire Prevention and Fire Safety Rules 2025, Schedule I |
| Lakshadweep Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026 | Not found | None found | Fire and Emergency Services Rules 2026 |
| Puducherry Puducherry G.O. 61 | Above 17 m for apartments | Category A risk class | G.O.Ms.No.61 of 10 September 2025 |
Definition = the instrument defines "high-rise building". Trigger = the height at which a fire NOC or certificate is needed. Class = a risk or fee band. A building below every line here can still need a NOC for its use or floor area: schools from 9 m in Delhi, Haryana and Bihar, for example.
What the NBCS 2026 definition of a high-rise building says
The definition is one line. What it does depends on whether your state adopts it.
Word for word
A building 24 m or above in height (irrespective of its occupancy).
NBC 2016 used the same words with 15 m, in clause 2.38 of Part 4. Part F says it is only for guidance and referral for the state government or local authority, and a note to clause 1.2 lets them change its height and area thresholds. Only Assam had written NBCS 2026 into its fire law by 24 October 2026, and the same Assam amendment of 14 August 2026 removed the 15 m figure from its own definition and left the height to a Government notification.
How high-rise building height is measured, rule by rule
Two buildings of the same height can fall on different sides of the line, because the rules measure from different points and count different floors.
NBCS 2026, clause 2.6
From the fire tender's grade to the last occupied floor
Height runs from the ground where the fire tender stands to the floor level of the last occupiable floor; on a sloping site, from the lowest level a fire vehicle can reach. BIS, SP 7:2026
West Bengal, section 2(ha)
From the street's centre line to the highest point
The 14.5 m line is measured from the average level of the centre line of the abutting street. Indian Kanoonnews report
AP G.O.Ms.No.273
The stilt floor is counted
Since 19 December 2025 the 24 m line includes the stilt floor. G.O.Ms.No.273
J&K bye-laws, chapter 9
Stilts add 2.5 m
Higher than 15 m without stilts, or above 17.5 m with stilts kept for parking. J&K H&UDD
Punjab Act, section 24(2)
Stilt parking keeps 17.5 m low-rise
An independent floor up to 17.5 m with stilt parking gets low-rise fire norms; shops in the stilts end the relief. Punjab Gazette
Kerala KMBR, rule 80
Floors count as well as metres
16 m or more, or more than 4 floors excluding basements: a low-ceilinged 5-floor block is a high-rise. KMBR 2019
MP Bhumi Vikas, rule 2(38)
Storeys or metres, whichever comes first
More than 10 storeys or more than 30 m. MP Town Planning
Delhi Rule 27
Stilt and mezzanine floors are storeys
A stilt plus 4 floors is 5 storeys, which brings a home in even below 15 m. DFS
What NBCS 2026 asks of a high-rise building
Part F's Annex D and the clauses it points to add these duties once a building reaches 24 m. They apply where your state adopts NBCS 2026 or a contract names it.
- At least 2 staircases for every high-rise and special building, with the required fire exit stairs recommended to be free of FAR (clause 4.4.2) BIS, SP 7:2026
- One firefighting shaft for each residential tower and each educational block, and one per compartment in institutional, assembly, business and mercantile buildings; 2 shafts where a floor has 3 or more compartments (Annex D, D-2) BIS, SP 7:2026
- Below 60 m, the firefighting shaft on an external wall, discharging straight outside; at 60 m and above it may sit in the core but must discharge through an exit passageway (clause 4.2.10) BIS, SP 7:2026
- Refuge spaces in the firefighting shaft's lift lobby of at least 12 m², or 5% of the floor's occupants at 0.45 m² each, whichever is higher (D-4.2) BIS, SP 7:2026
- Where refuge areas are used instead, one at or just above 24 m and then about every 15 m, sized for 2 floors' occupants at 0.3 m² each and at least 15 m², sprinklered and signed in letters of at least 75 mm (D-4.2) BIS, SP 7:2026
- Above 60 m, stair pressurisation checked so a door opens with a force of not more than 133 N (D-2) BIS, SP 7:2026
- During construction: a dry riser of at least 100 mm with outlets on finished floors, 2,000-litre water drums with 2 buckets on each floor and a tank of at least 20,000 litres (clause 3.5.3.2) BIS, SP 7:2026
One 20 m high-rise building tested in six cities
The same block of flats, 20 m to its last occupied floor, 6 floors and 2,400 m², is a high-rise in some states and not in others.
Case 1
Hyderabad
A fresh Provisional NOC application filed after 7 October 2026.
What applies Below Telangana's 24 m line for residential apartments, so no Provisional fire NOC is needed for this block; a commercial block of the same height would still need one above 15 m. TGFD circular 3455
Case 2
Bengaluru
Plan sanction from the city corporation.
What applies Below the 21 m high-rise line in section 13(3) of the Karnataka Fire Force Act, but Seva Sindhu lists eligibility from 15 m: ask KSFES in writing which line applies. Government of Karnataka
Case 3
Kolkata
Inside the Kolkata Municipal Corporation area.
What applies Above West Bengal's 14.5 m line, so a high-rise and a high-risk building; 2,400 m² is also over the 500 m² cap for self-certification, so it needs the recommendation and the certificate. WB notification 1930
Case 4
Chennai
Planning permission from CMDA.
What applies Over the 18.30 m line in TNCDBR rule 2(58), so a high-rise: the Director of Fire and Rescue Services issues the NOC. TNCDBR 2019
Case 5
Indore
Building permission from the municipal corporation.
What applies Not a high-rise until it passes 30 m or 10 storeys, but above 12.5 m it must submit fire drawings and fit the systems before occupancy. MP Town Planning
Case 6
Kochi
Permit under the Kerala Municipality Building Rules.
What applies A high-rise twice over: 16 m or more, and more than 4 floors. Over 15 m it also needs the fire NOC under rule 5(4). KMBR 2019
How state high-rise building lines were set, 2012 to 2025
Before NBCS 2026 most states copied 15 m from the code. These are the ones that wrote their own line, and when.
30 May 2012
Madhya Pradesh's Bhumi Vikas Rules define a high-rise as more than 10 storeys or 30 m. MP Town Planning
17 December 2014
Goa's section 13 notification lists high-rise buildings of more than 15 m. DFES Goa charter
2016
NBC 2016 Part 4 defines a high-rise as 15 m or above, irrespective of occupancy (clause 2.38). BIS, NBC 2016 Part 4
4 February 2019
Tamil Nadu's Combined Development and Building Rules set the line at exceeding 18.30 m. TNCDBR 2019
8 November 2019
Kerala's Municipality Building Rules define a high-rise as 16 m or more, or more than 4 floors. KMBR 2019
25 March 2021
Meghalaya's Building Bye-Laws define a high-rise as exceeding 15 m, any occupancy. Bye-Laws 2021
24 December 2021
J&K's Unified Building Bye-Laws set 15 m, 17.5 m with stilts, and call buildings above 50 m tall. J&K Gazette
2023
Karnataka's amendment adds section 13(3): a high-rise is 21 m or above, any occupancy. Government of Karnataka
19 December 2025
Andhra Pradesh moves to 24 m, stilt floor included, by G.O.Ms.No.273. G.O.Ms.No.273
24 December 2025
Assam's new fire Act defines a high-rise as 15 m or above in section 2(oo). Assam Act LIII of 2025
High-rise building line changes in 2026
From news reports, not yet an official source.
Four definitions moved toward 24 m in 2026 and one state handed the number to its Government. Flamekite rechecks state gazettes and fire service circulars and updates this list.
30 April 2026
BIS replaces NBC 2016 with NBCS 2026 (SP 7:2026); the high-rise line in Part F becomes 24 m. Gazette of India
2 June 2026
Tripura's Fire Safety Rules 2026 are gazetted with a 24 m high-rise definition in rule 2(49). Directorate of Fire and Emergency Services, Tripura
14 August 2026
Assam's Jan Vishwas Act removes 15 m from section 2(oo); the height is now whatever the Government specifies. No notification had followed by 24 October 2026. Assam Act XIII of 2026
20 August 2026
Mizoram signs amended rules naming high-rise buildings as 24 m and above; they start on publication in the Mizoram Gazette, a date Flamekite has not found. Mizoram Home Dept
7 September 2026
Punjab's building rules amendment makes every staircase in a building above 21 m a fire-exit staircase. Indian Mastermindsnews report
30 September 2026
Bihar uploads draft Building Bye-laws 2026 for objections; press reports say self-certified buildings up to 24 m would need no separate fire NOC. Not notified. GKTodaynews report
7 October 2026
Telangana's 24 m line for residential apartments takes effect for fresh Provisional NOC applications; fire towers and fire command centres move to 24 m for all uses. TGFD circular 3455
High-rise building and the terms used next to it
Rules use several near-synonyms, and each one carries its own number.
- Tall building
- NBCS 2026 uses 60 m and above for tall buildings (clause 4.2.10); the J&K bye-laws use more than 50 m. BIS, SP 7:2026
- Special building
- In NBC 2016 Part 4, clause 1.2(b): non-high-rise buildings the fire chapter still covers, such as schools and hospitals of 9 m, every assembly building and any floor over 500 m². BIS, NBC 2016 Part 4
- Multi-storey building
- Uttar Pradesh's Act uses it for buildings more than 15 m; Jharkhand's bye-laws put it at 16.40 m, or 15 m for fire. UP Act 16 of 2022
- Multi Storied Building (Tamil Nadu)
- 18.3 m and above on the single window portal: the Director of Fire and Rescue Services issues these NOCs, the District Officer the rest. TNSWP
- High-risk building (West Bengal)
- A high-rise of 14.5 m or more, or any occupancy the state notifies; notification 279 of 2003 lists 19. West Bengal Fire and Emergency Services
- Section 45 building (Maharashtra)
- The Act's high-risk class: above 30 m for listed uses and residential buildings above 70 m, with a licensed fire audit every 2 years. Amendment Act 2023
- Firefighting shaft
- An enclosed shaft of 120-minute fire resistance holding a staircase, a fire lift and its lobby (NBCS 2026, clause 2.24). BIS, SP 7:2026
- Refuge area
- A space for temporary use during escape, open to air on at least one side, required above 24 m in NBCS 2026 where refuge spaces are not planned. BIS, SP 7:2026
High-rise building lines across India, counted
Flamekite’s working from the official rules; no government publishes this figure.
Flamekite's count from the 36-row matrix above, on 24 October 2026.
36
States and UTs whose high-rise or fire NOC height line Flamekite looked for Legislative Department, Ministry of Law and Justice
13
That define "high-rise building" in an act, rule or bye-law (Assam until August 2026) Assam Act LIII of 2025
19
That use 15 m as their main line, the NBC 2016 and Model Bill figure DGFS, MHA
4
At 24 m: Andhra Pradesh, Tripura, Mizoram once gazetted, and Telangana for apartments Directorate of Fire and Emergency Services, Tripura
14.5 m
The lowest definition: West Bengal Indian Kanoonnews report
30 m
The highest: Madhya Pradesh, more than 30 m or 10 storeys MP Town Planning
2
With no line Flamekite could find: Arunachal Pradesh and Lakshadweep Government of Arunachal Pradesh
Four myths about the high-rise building line
You may have read
Since 2026 every building under 24 m is outside the high-rise rules.
Myth
What the sources say
NBCS 2026 is voluntary. Most states still use 15 m in their own acts and bye-laws, and those decide the fire NOC. BIS, SP 7:2026
You may have read
Below the high-rise line, no fire NOC is needed.
Myth
What the sources say
Use and height bands below the high-rise line bring buildings in too: Delhi's Rule 27 covers schools, hospitals and shops over 9 m and hotels over 12 m. DFS
You may have read
Telangana raised the high-rise line to 24 m for all buildings.
Myth
What the sources say
Circular Rc.No.3455/MSB/2026 moves only residential apartments to 24 m; commercial buildings still need a NOC above 15 m. TGFD circular 3455
You may have read
Assam no longer has a high-rise height.
Myth
What the sources say
The definition now waits for a Government notification, but Schedule I of the 2025 Act still makes every building of 15 m or more high risk. Assam Act LIII of 2025
Where the high-rise building line catches owners out
These come from the wording of the rules, not from the number itself.
If A building of exactly 18.3 m in Tamil Nadu
The single window says 18.3 m and above, TNCDBR says exceeding 18.30 m: confirm with TNFRS which officer clears it. TNCDBR 2019
If Reading Karnataka's 21 m as the whole story
Seva Sindhu lists high-rise NOC eligibility from 15 m. Get the fire service's answer in writing before the plan goes in. Seva Sindhu
If Filling stilts with shops
In Punjab and J&K the stilt relief holds only while the stilts stay parking; in Andhra Pradesh the stilt is counted anyway. Punjab Gazette
If Counting only metres in Kerala or Delhi
Kerala counts more than 4 floors, and Delhi counts stilt and mezzanine floors as storeys. KMBR 2019
If Dropping the fire tower in a Telangana block below 24 m
Since 7 October 2026 the fire tower and fire command centre start at 24 m, but every other measure in the approved plan still applies. TGFD circular 3455
What Flamekite could not confirm about high-rise building lines
These gaps are listed so you know where to ask, not filled with guesses.
Telangana's Fire Service Act, 1999 is reported to define a high-rise at 18 m, but the India Code copy refused our requests, so this page uses the department's own circular, which says 18 m and above applied before 7 October 2026.
Odisha's ODA (Planning and Building Standards) Rules, 2020, Gujarat's GDCR, Maharashtra's UDCPR, the Haryana Building Code, 2017 and Delhi's Unified Building Bye-Laws carry their own high-rise definitions, which Flamekite has not read; the matrix shows each state's fire law line instead.
Arunachal Pradesh's Act 12 of 2026 and Lakshadweep's 2026 Regulation and Rules were read for other provisions only. Whether they define a high-rise is not confirmed.
West Bengal's Fire Services (Amendment) Act, 2022 is reported to raise the line to 15.5 m for a named local area from a notified date. Its text was not available, so the matrix keeps 14.5 m statewide.
Questions about the high-rise building definition
What is the height of a high-rise building in India?
- 24 m or above under NBCS 2026, the national standard since 30 April 2026, and 15 m under the withdrawn NBC 2016. The line that binds you is your state's: 15 m in most states, 24 m in Andhra Pradesh and Tripura, 21 m in Karnataka, 18.3 m in Tamil Nadu.
What is the definition of a high-rise building as per NBC?
- NBC 2016, Part 4, clause 2.38: a building 15 m or above in height, irrespective of its occupancy. Its replacement, NBCS 2026, Part F, clause 2.39, uses the same words with 24 m.
Is a 15 m building a high-rise?
- Under NBC 2016 yes, because it says 15 m or above. Under rules that say above or exceeding 15 m, such as Himachal Pradesh's and Meghalaya's, a building of exactly 15 m is not, so read your state's wording.
Does the stilt floor count in building height?
- It depends on the state. Andhra Pradesh counts it in its 24 m line; J&K and Punjab give stilt parking extra room up to 17.5 m; Delhi counts a stilt as a storey.
Is a multi-storey building the same as a high-rise building?
- Often the same height, but not always. Jharkhand calls a building multi-storey at 16.40 m but uses 15 m for fire, and Uttar Pradesh's Act uses multi-storied for buildings over 15 m.
Does every high-rise building need a refuge area?
- Under NBCS 2026, buildings over 24 m need refuge areas at about every 15 m unless refuge spaces are planned in the firefighting shaft lobbies, and high-rise flats with balconies are exempt. Your state's rules may say otherwise.
Which states use 24 m as the high-rise height?
- Andhra Pradesh (stilt included) and Tripura define a high-rise at 24 m; Mizoram has signed the same line, in force once gazetted; Telangana uses 24 m for residential apartments only.
Keep reading
- National Building Code 2026What changed when NBC 2016 was withdrawn on 30 April 2026.
- Occupancy classificationGroups A to J in NBC 2016, A to K in NBCS 2026, and each state's own classes.
- Refuge areaThe staging floors a high-rise needs above 24 m in NBCS 2026.
- Fire towerThe firefighting shaft every high-rise tower is planned around.
- Fire NOC in IndiaWho needs a fire NOC, and the rules in all 36 states and UTs.
- Fire NOC in TelanganaThe 24 m line for residential apartments from 7 October 2026.
- Fire NOC in KarnatakaThe 21 m high-rise NOC under section 13(3).
- Fire NOC in West BengalThe 14.5 m line and Kolkata's self-certification.
Keep exploring
More in Fire Safety Glossary
Also in Resources
Sources
Each source was opened and read on the date shown. How Flamekite checks its sources
- Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 National Building Construction Standards 2026, Part F: Fire and Life Safety (opens in a new tab)
- Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016 (SP 7:2016), Part 4: Fire and Life Safety, clauses 1.2, 2.38 and 3.1 (opens in a new tab)
- Gazette of India (Bureau of Indian Standards notification): Gazette of India Extraordinary, Part III Sec 4, No. 299, 30 April 2026: SP 7:2026 established, SP 7:2016 withdrawn (Ref HQ-PUB013/1/2020-PUB-BIS (1529)) (opens in a new tab)
- Legislative Department, Ministry of Law and Justice: The Constitution of India (Twelfth Schedule, item 7: Fire services; Article 243W) (opens in a new tab)
- Directorate General Fire Services, Civil Defence and Home Guards (MHA): Revised Model Fire and Emergency Service Bill, 2019 (opens in a new tab)
- Assam Gazette Extraordinary No. 427, 14 August 2026 (PRS copy of the gazette): The Assam Jan Vishwas (Amendment of Provisions) Act, 2026 (Assam Act No. XIII of 2026): Schedule item 4 amending sections 2, 20, 21 and 31 of the 2025 Act (opens in a new tab)
Show all 51 sourcesShow fewer
- Directorate of Fire and Emergency Services, Tripura: Tripura Fire Safety Rules, 2026 (Tripura Gazette, 2 June 2026) (opens in a new tab)
- Government of Andhra Pradesh, MA&UD (M) Department, final notification (copy hosted by Simpliance): G.O.Ms.No.273, 19 December 2025: amendments to the AP Building Rules, 2017 (high-rise at 24 m; Fire NOC before 24 m) (opens in a new tab)
- Government of Arunachal Pradesh (PRS copy of AP Gazette Extraordinary No. 128, 11 May 2026): Arunachal Pradesh Fire and Emergency Services Act, 2026 (Act 12 of 2026) (opens in a new tab)
- Government of Bihar, Home Department notification (English copy hosted by Bihar Fire Service): Bihar Fire Service Rules, 2021: rules 14 to 27, 33, 34 and 38, Schedules C (fees), D (online NOC), E (pandals) and H (existing buildings) (opens in a new tab)
- Home Department, Chhattisgarh (on the CG Fire NOC portal): Notification under section 14(1), 29 November 2022: buildings that need a fire NOC (opens in a new tab)
- Directorate of Fire and Emergency Services, Goa: Citizen's Charter, December 2024: 17 fire stations, 3 zones, 1,106 posts, the section 13 notification 3/5/97-HD(G) Part/3934 of 17 December 2014 with Annexures I and II, the 2018 Annexure III on shacks and guest houses, and the 2009 fee rules (opens in a new tab)
- Gujarat Fire Safety Compliance Portal (GujFireSafety CoP): Gujarat Fire Prevention and Life Safety Measures Regulations, 2023 (fees in Annexure 8) (opens in a new tab)
- Government of Haryana (PRS copy): Haryana Fire and Emergency Services Act, 2022 (Act 14 of 2022) (opens in a new tab)
- Department of Fire Services, Himachal Pradesh: Acts and Rules: HP Fire Fighting Services Act, 1984 with the 2000 amendment (section 15-A) (opens in a new tab)
- Government of Karnataka (PRS copy): Karnataka Fire Force (Amendment) Ordinance, 2023: section 13(3) high-rise NOC (opens in a new tab)
- Local Self Government Department, Government of Kerala (Kerala Gazette copies): Kerala Municipality Building Rules, 2019 (G.O.(P) No.77/2019/LSGD, S.R.O. No.828/2019, 8 November 2019) with the Amendment Rules, 2020 (G.O.(P) No.57/2020/LSGD, S.R.O. No.639/2020): rule 5(4) items 12 and 13, rules 28, 29, 35, 80 and 81, Appendix L (opens in a new tab)
- Directorate of Town and Country Planning, Madhya Pradesh: Madhya Pradesh Bhumi Vikas Rules, 2012, English text updated up to 6 March 2025: rules 2(38), 12(2), 26, 42 and 87 (fire audit amendment of 4 September 2020) (opens in a new tab)
- Municipal Corporation of Greater Mumbai, Mumbai Fire Brigade: Revised schedule of fees for the year 2026-27, BRC No. 69 dated 30.03.2026 (rows 1 to 6 and 28 read off the page images) (opens in a new tab)
- Manipur Gazette Extraordinary No. 253, 5 December 2024 (Town Planning Department copy): The Model Manipur Unified Building Bye-Laws, 2024, notification No. BBL-101/1/2024-MAHUD-MAHUD-Part(1) of 4 December 2024: bye-laws 6, 7, 8, 9, 51, 65 and 85 to 89 (opens in a new tab)
- Gazette of Meghalaya No. 12, Part IIA, 25 March 2021 (copy hosted by the Urban Affairs Department): Meghalaya Building Bye-Laws, 2021 (No. UAU.73/2016/Pt/402 of 9 March 2021): A2.30 high-rise, A2.59 special buildings, A4.1.3, A10 occupancy and fire clearance, C11 (opens in a new tab)
- Home Department, Government of Mizoram (copy on the Mizoram Fire and Emergency Services site): Notification No. B-20011/2/2026-HM(F&ES), 20 August 2026: Mizoram Fire and Emergency Services (Superintendence and Control of the Fire Force and Fire Safety and Prevention) (Amendment) Rules, 2026, substituting Rule 57 and inserting Rules 57(A) and 57(B) (opens in a new tab)
- Directorate of Fire and Emergency Services, Nagaland: Nagaland Fire and Emergency Services Act (Act No. 5 of 2023), Nagaland Gazette, 31 August 2023 (opens in a new tab)
- Home Department, Government of Odisha: Odisha Fire Prevention and Fire Safety (Amendment) Rules, 2019, notification No. 10573/H of 6 March 2019: rule 9(1) classes, rules 10, 13(3) and 22(5) (opens in a new tab)
- Punjab Government Gazette (Extraordinary), copy hosted by PRS Legislative Research: Punjab Govt. Gazette (Extra), 26 November 2024: the Punjab Fire and Emergency Service Act, 2024 (Punjab Act No. 12 of 2024), Notification No. 12-Leg./2024 of 27 October 2024 (opens in a new tab)
- Urban Development Department, Rajasthan: Model Rajasthan Building Regulations, 2025, order No. P-11(5)/UDH/Bhavan Viniyam-2025/2025 (listed 12 May 2025): Regs 2.36, 2.75, 2.77, 4.6.2, 5.4, 11.2, 14.5 and Schedules 2 and 3 (opens in a new tab)
- Government of Sikkim (PRS copy of Gazette Extraordinary No. 226): Sikkim Fire and Emergency Services Act, 2023 (Act 4 of 2023) (opens in a new tab)
- Chennai Metropolitan Development Authority (copy of Tamil Nadu Government Gazette Extraordinary No. 43): Tamil Nadu Combined Development and Building Rules, 2019 (G.O. Ms. No. 18, MAWS, 4 February 2019): rules 2(58), 7, 20, 39, 64 and Annexure IX (opens in a new tab)
- Telangana Fire, Disaster Response, Emergency and Civil Defence Department: Circular Memorandum Rc.No.3455/MSB/2026, 26 September 2026: revised requirements for Fire NOCs in the context of G.O.Ms.No.95 (in force 7 October 2026) (opens in a new tab)
- Uttar Pradesh Gazette Extraordinary, 13 December 2022 (copy hosted by PRS Legislative Research): Uttar Pradesh Fire and Emergency Services Act, 2022 (U.P. Act No. 16 of 2022), English translation: sections 1, 26 to 29, 33 to 39, 45, 48, 58 and 66 (opens in a new tab)
- Government of Uttarakhand, Sarkari Gazette Extraordinary, 21 July 2022 (copy hosted by Uttarakhand Fire and Emergency Services): Uttarakhand Fire & Emergency Service, Fire Prevention and Fire Safety (Amendment) Act, 2022 (Uttarakhand Act No. 06 of 2022), assented 20 July 2022, notification 191/XXXVI(3)/2022/36(1)/2022: sections 15(4) and 18 at 12 m and 500 m2 (opens in a new tab)
- Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026: Andaman and Nicobar Islands Fire and Emergency Service Regulation, 2026 (No. 5 of 2026) (opens in a new tab)
- Gazette of India, Ministry of Home Affairs (copy hosted by TaxHeal): S.O. 2264(E) of 6 May 2026: the Haryana Fire and Emergency Services Act, 2022 extended to the Union territory of Chandigarh, with modifications (opens in a new tab)
- Gazette of India Extraordinary (CG-DL-E-02062026-273069): Dadra and Nagar Haveli and Daman and Diu Fire and Emergency Service Regulation, 2026 (No. 6 of 2026) (opens in a new tab)
- Delhi Fire Service (copy of Delhi Gazette Extraordinary, Part IV): Delhi Fire Service (Amendment) Rules, 2025, notification F.No. DFS/HQ/Misc/2025/01(E-259159)/237, gazetted 26 May 2026 (opens in a new tab)
- Jammu and Kashmir Official Gazette (Extraordinary), copy hosted by the Housing and Urban Development Department: J&K Official Gazette, Vol. 134, No. 39-4, 24 December 2021: the Jammu and Kashmir Unified Building Bye-Laws, 2021 (opens in a new tab)
- Gazette notification S.O. 140 (copy hosted by Simpliance): Ladakh Fire Prevention and Fire Safety Rules, 2025 (S.O. 140, 28 November 2025) (opens in a new tab)
- Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026: Lakshadweep Fire and Emergency Services Rules, 2026 (Rule 12: 5-year fire safety certificate) (opens in a new tab)
- Government of Puducherry, Home Department (copy hosted by the Fire Service Department): G.O.Ms.No.61, 10 September 2025: Fire Safety Audit and Issue of NOC, Third Party Fire Safety Audit, Categories A, B and C, renewal, temporary licences, and Annexures I to V on licensed agencies and the Category C protocol (opens in a new tab)
- Housing and Urban Development Department, J&K (copy hosted by NITI for States): Jammu and Kashmir Unified Building Byelaws 2021 (February 2021): use classes, high-rise and tall buildings, fire access and Fire Consultant on Record (opens in a new tab)
- Department of Fire and Emergency Services, Government of West Bengal: Notification 1930/FES/O/MISC-08/2023, 1 March 2024: 12 occupancies moved to yearly self-certification (with forwarding letter 1961 of 5 March 2024) (opens in a new tab)
- Assam Gazette Extraordinary No. 811, 24 December 2025 (PRS copy of the gazette): The Assam Fire and Emergency Services Act, 2025 (Assam Act No. LIII of 2025), notification No. LGL.52/2025/3: sections 1 to 67 and Schedule I (opens in a new tab)
- Guidance Tamil Nadu, Tamil Nadu Single Window Portal: No Objection Certificate for Multi Storied Buildings (18.3 m and above) from TNFRS: procedure, documents, timelines and fees (opens in a new tab)
- West Bengal Fire and Emergency Services: FAQ: fire safety certificate, 14.5 m line, compounding under section 38B (opens in a new tab)
- Government of Maharashtra (copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023 (Mah. Act No. XXIV of 2023), first published 11 May 2023 (opens in a new tab)
- Seva Sindhu, Government of Karnataka: Application for No Objection Certificate (High rise Building) - Fire & Emergency: documents, fee under G.O. of 13-09-2019, 60 working days (opens in a new tab)
- Indian Kanoon (legal database copy of the 1996 text): West Bengal Fire Services Act, 1950: sections 2(ha), 2(hb), 11C to 11K and 38B (copy predates the 2018 and 2022 amendments) (opens in a new tab)
- Indian Kanoon (legal database copy; gazette not read): Section 2 in Jharkhand Building Byelaws 2016: definitions, 2.94 multi-storey building (opens in a new tab)
- Indian Masterminds: Punjab Building Rules 2026: Second Amendment notified 7 September 2026, fire-exit staircases above 21 m (10 September 2026) (opens in a new tab)