Skip to content
Flamekite
ContactFree fire NOC check

Fire NOC fees 36 min read

Fire NOC fees in India 2026: the rate, basis and renewal fee in all 36 states and UTs

Updated By Flamekite Editorial DeskFacts checked against official sources on

Quick answer

Fire NOC fees run from Rs 1 to Rs 60 per m² of built-up area. Only 17 of 36 states and UTs publish a rate, and 7 charge nothing: Tamil Nadu, Uttar Pradesh, Jharkhand, Arunachal Pradesh, Puducherry, Himachal Pradesh and Lakshadweep.

The cheapest published rate is Odisha's Rs 1 per m² for a home; the dearest is Karnataka's Rs 60 per m² for non-residential high-rises, with a Rs 5,00,000 minimum, then Kerala's and Gujarat's Rs 50 per m². Mizoram caps a home at Rs 5,000, Kerala sets a Rs 20,000 floor, and Andhra Pradesh and Bihar add a 15% bank guarantee on the fire system.

Lowest published rate
Rs 1 per m²
Odisha, residential
State fee table
Highest published rate
Rs 60 per m²
Karnataka non-residential high-rises
State fee table
Official fee schedules found
17 of 36
States and UTs with a rate Flamekite could read
Who publishes
Bank guarantee on top
15%
Of the fire-system cost, Andhra Pradesh and Bihar
Guarantees

Fire NOC fees at a glance

The national picture of fire NOC fees in 10 rows, each with its official source.
WhatThe ruleSource
Who sets the feeEach state or UT, by notification under its own fire act or rules; no central fee existsMizoram Fire and Emergency Services
Usual basisA rate per m² of built-up or floor area, by occupancy and height; a few states charge a flat amount per applicationGujarat Fire Safety Compliance Portal
Range of published ratesRs 1 per m² (Odisha, homes) to Rs 60 per m² (Karnataka non-residential high-rises); Kerala and Gujarat top out at Rs 50Odisha Fire Service
Floors and capsKerala minimum Rs 20,000 or Rs 26,000; Mizoram maximum Rs 5,000 or Rs 6,000Kerala Fire and Rescue Services
No feeTamil Nadu (TNSWP sheets: no fees collected), Uttar Pradesh (online dashboard: Nil), Jharkhand (Fire Service letter 671 of 2020), Arunachal Pradesh (EoDB: no fee required), Puducherry (Citizen Charter), Himachal Pradesh (single-window checklist), Lakshadweep (Rules 2026), and Goa's initial NOCFire Service Department, Puducherry
RenewalA flat sum (Rs 2,500 in DNH and DD), a share of the first fee (10% in Assam) or a per-m² rate again (Odisha)DNH and DD fire SOP
Security on topBank guarantee of 15% of the fire-system cost for 5 years in Andhra Pradesh and BiharBihar Rules 2021
Late renewalFrom Rs 5 a day (Meghalaya, after 7 free days) to Rs 500 a day up to Rs 2 lakh (Tripura's July 2025 notice, unconfirmed after its 2025 Act)Fire and Emergency Services, Meghalaya
Fire taxA surcharge on property tax: 1% of house tax in Uttar Pradesh, 2.5% in Bihar, up to 10% in Karnataka; Assam's rate is left to a notificationLegitQueststudy
Last verified24 October 2026, against state notifications, rules and fire service portalsNot stated

Fire NOC fee by stage: first stage, final certificate and renewal

What each stage costs in the states whose notification splits the fee by stage.
OptionFirst stage (plan or provisional)Final certificateRenewalSource
Gujarat (Regulations 2023)Fire Safety Plan Approval: Rs 1,000 to Rs 7,000 flatFire Safety Certificate Approval: Rs 7 to Rs 50 per m² of built-up areaRs 1,000 to Rs 7,000 flat (FSCR)Gujarat Fire Safety Compliance Portal
Kerala (G.O.(Ms)No.272/2024)Building NOC: Rs 12 to Rs 50 per m², minimum Rs 20,000 or Rs 26,000Fire Safety Certificate line: Rs 3,000 (educational, residential) or Rs 12,000 (others)Rs 2,500 to Rs 12,000 a year, by occupancy and heightKerala Fire and Rescue Services
GoaInitial NOC: no feeLicence fee: Rs 10 per m² for most categoriesRs 150 a year for eateries up to 50 seatsDirectorate of Fire and Emergency Services, Goa
AssamRecommendation fee equal to the NOC fee, waived for a recommendation already taken in or after 2016Rs 200 to Rs 4,000 by occupancy, height band and area10% of the NOC feeFire and Emergency Services, Assam
Dadra and Nagar Haveli and Daman and DiuRs 10 per m² of built-up area, basement includedRs 10 per m² only if not paid at the provisional stageRs 2,500DNH and DD fire SOP
Tripura (e-District)Recommendation: Rs 3,000NOC or Fire Safety Certificate: Rs 3,000Rs 2,500e-District Tripura
Mizoram (6 May 2026)Rs 2 or Rs 4 per m², capped at Rs 5,000 or Rs 6,000The notification does not split the fee by stageRs 200 to renew a provisional NOCMizoram Fire and Emergency Services
TelanganaFire precaution fee: Rs 10 per m²Occupancy inspection charge capped at Rs 50,000Renewal inspection: Rs 10,000TSDRFS circular 2016
DelhiNo fee found in the rules in forceRs 1,000 with Forms H, I and J, from 20 May 2027Rs 1,000 with each annual Form K, from 20 May 2027DFS
OdishaFire Safety Recommendation: Rs 1 per m² homes, Rs 2 othersFire Safety Certificate: the same rate againRs 1 per m² residential, Rs 2 per m² other buildingsOFES FSR service

How to calculate your fire NOC fee, step by step

  1. Find the instrument that sets your fee

    Look up your state in the table below and open the notification it names. Mizoram's rates, for example, come from notification G/262/2026-HM (F&ES) of 6 May 2026, which replaced the 2016 rates the same day.

  2. Fix the occupancy group and height band

    Most schedules price by use and height. Gujarat charges a 15 to 35 m apartment block Rs 10 per m² but a block above 60 m Rs 20 per m²; Assam uses three height bands: under 10 m, 10 to 15 m, and 15 m or more.

  3. Measure the area the rule names

    Andhra Pradesh counts total built-up area including basements and stilts, DNH and DD counts total built-up area including the basement, and Mizoram and West Bengal use floor area. Use the area on the approved plan.

  4. Multiply, then apply the floor or the cap

    Area times rate gives the base. Kerala then lifts any result below Rs 20,000 (homes, schools, hotels) or Rs 26,000 (other uses) to that minimum; Mizoram cuts any result above Rs 5,000 for homes or Rs 6,000 for other buildings.

  5. Add the flat stage fees

    Gujarat adds a flat plan-approval fee of Rs 1,000 to Rs 7,000 before the per-m² certificate fee, and the same flat sum again at each renewal. Tripura charges Rs 3,000 a service instead of a rate.

  6. Add security and inspection charges

    Andhra Pradesh and Bihar want a bank guarantee of 15% of the fire-system cost for 5 years. Telangana bills Rs 10,000 for a renewal inspection on top of its Rs 10 per m² fee.

  7. Budget the renewal and its late fee

    Write down the renewal fee and the day the late fee starts. Meghalaya charges nothing for 7 days after expiry, then Rs 5 a day; Gujarat charges 25% of the certificate fee for every 90-day block of delay.

  8. Check the demand before you pay

    Pay the amount the portal or demand note shows, not your own estimate. Meghalaya's 2018 notification and its single-window SOP disagree on whether any fee is due, so the payment screen is the final word.

Fire NOC fees in all 36 states and UTs: rate, basis, cap, renewal

17 of 36 states and UTs publish an official fire NOC rate Flamekite could read by 25 October 2026, from Rs 1 per m² (Odisha homes) to Rs 60 per m² (Karnataka non-residential high-rises). 7 charge nothing, Tamil Nadu, Uttar Pradesh, Jharkhand and Arunachal Pradesh among them; the rest leave the fee to rules that are unpublished, unreadable or not yet made.

RateBasisMinimum or capRenewal feeInstrument and date
Andhra Pradesh AP State Disaster Response and Fire ServicesRs 10 per m²Total built-up area, including basements and stiltsNone published; plus a 15% bank guaranteeLicence renewed each calendar year at the grant fee; 25% extra if lateLevy of Fee Rules 2006 (G.O.Ms.306, 8 December 2006), rules 15 and 21
Arunachal Pradesh EoDB ArunachalNo fee: EoDB lists "No fee required" for the certificate, the pre-construction NOC and the renewalAct 12 of 2026 sets no certificate fee; the portal text dates from June 2023Not applicableNo feeEoDB Arunachal fire services; no rules under the 2026 Act
Assam Fire and Emergency Services, AssamRs 200 to Rs 4,000 a certificateOccupancy, height band (under 10 m, 10 to 15 m, 15 m or more) and areaRs 200 for a home up to 150 m²; Rs 4,000 for a hazardous building of 15 m or more above 500 m²10% of the NOC feeEoDB fee structure, Annexure A (still headed proposed rates)
Bihar BFS fee PDFRs 2 to Rs 10 per m² provisional; Rs 1 to Rs 5 per m² finalTotal floor area, basement included, in 5 categories from residential to storage, industrial and hazardousNone published; plus a 15% bank guaranteeRs 1 to Rs 5 per m², the final-stage rateBihar Fire Service Rules 2021, Schedule C (official copy and the portal's fee PDF)
Chhattisgarh Fire and Emergency Services and SDRF, ChhattisgarhNot publishedNo fee schedule on the state NOC portalNot publishedNot publishedAct 2018 and Rules 2021, amended 2025
Goa Directorate of Fire and Emergency Services, GoaRs 10 per m²; initial NOC freeBuilt-up area, for buildings over 14.2 m, factories of 5 HP or more, godowns, public places, schools and hotels for over 50Rs 150 per NOC a year for eateries up to 50 seatsNot published as a separate feeCitizen's Charter notification 3/7/85-HD (G) Vol. II, in BRAP 2024 item 284
Gujarat Gujarat Fire Safety Compliance PortalRs 7 to Rs 50 per m², plus Rs 1,000 to Rs 7,000 flatBuilt-up area, by occupancy and heightRs 2,000 lump sum for a temporary structureRs 1,000 to Rs 7,000 flatFire Prevention and Life Safety Measures Regulations 2023 (Gazette, 13 December 2023), Annexures 8 and 9
Haryana ULB HaryanaNil on the old ULB service page; nothing notified under the 2022 ActThe 2022 Act leaves fees "as may be prescribed"Not applicableNil on the old ULB pageULB service page under the 2009 Act, archived 18 February 2026; Act 14 of 2022
Himachal Pradesh Emerging Himachal single windowNo feeSingle-window application in Form ANot applicableNot applicableDepartment fire checklist and procedure
Jharkhand JFS letter 671No fee for the advisory, the NOC or the renewalSingle Window services; the 2024 Act's rules not yet madeNot applicableNo feeFire Service HQ letter No. 671 of 18 December 2020 and the Single Window SOPs
Karnataka Seva SindhuRs 35 per m² residential; Rs 60 per m² other buildingsBuilt-up area of a high-rise; the Clearance Certificate after construction is freeMinimum Rs 2,50,000 (residential) or Rs 5,00,000 (others)Not publishedGovernment Order of 13 September 2019, as listed on Seva Sindhu (the order itself not read)
Kerala Kerala Fire and Rescue ServicesRs 12 to Rs 50 per m²Built-up area, by occupancy, height and hazardMinimum Rs 20,000 (homes, schools, hotels) or Rs 26,000 (other uses)Rs 2,500 to Rs 12,000 a year; a 5-year term at 5 times the annual feeG.O.(Ms)No.272/2024/Home; G.O.(Ms)No.143/2025/Home of 4 August 2025
Madhya Pradesh MP e-Nagar Palika manualNot publishedThe e-Nagar Palika fire manual has no payment step; Act 16 of 2026 leaves fees to rulesNot publishedNot publishede-Nagar Palika Fire Safety Module manual (effective 30 May 2025); MP Act 16 of 2026 (start date not notified)
Maharashtra Amendment Act 2023Fire and Emergency Service Fee; state rates not readSchedule-II of the Act, substituted in 2023Not readNot readMaharashtra Act XXIV of 2023; Mumbai publishes its own yearly schedule
Manipur Government of ManipurNot publishedAct 9 of 2026 sets no certificate feeNot publishedNot publishedManipur Fire and Emergency Service Act 2026
Meghalaya Fire and Emergency Services, MeghalayaRs 3 to Rs 10 per m²Floor area in commercial use, by occupancyNone publishedRs 500 to Rs 3,500, headed annual; certificates last 3 years since July 2025Notification HPL.179/2017/85 of 12 June 2018, Annexures A to C
Mizoram Mizoram Fire and Emergency ServicesRs 2 per m² homes; Rs 4 per m² other buildingsFloor areaMaximum Rs 5,000 (homes) or Rs 6,000 (others)Rs 200 to renew a provisional NOCNotification G/262/2026-HM (F&ES) of 6 May 2026
Nagaland Directorate of Fire and Emergency Services, NagalandNot publishedLeft to rules under Act 5 of 2023Not publishedNot publishedNagaland Fire and Emergency Services Act (Act 5 of 2023)
Odisha OFES FSR serviceRs 1 per m² homes; Rs 2 per m² other buildingsBuilt-up area, charged at the recommendation, the certificate and each renewalNone publishedThe same rates, on the renewal serviceOdisha Fire and Emergency Service portal: FSR, FSC and renewal services, paid through IFMS
Punjab Local Govt PunjabRs 5,000 to Rs 50,000 a NOC by use and size, flat; half for a provisional NOCUse, height and plot size, by NBC zoneCaps up to Rs 2,00,000 (multiplexes, large housing)50% of the NOC feeDirectorate of Local Government letter 41343 of 8 October 2021; no fee yet under the 2024 Act
Rajasthan Rajasthan UDHRs 2 per sq ft (Nagar Nigam), Rs 1.50 (Nagar Parishad), Rs 1 (Nagar Palika)Gross built-up areaNone publishedRenewal application fee Rs 10,000, Rs 7,500 or Rs 5,000 by body; Rs 5,000 penalty for late renewalUDH and LSG order of 14 September 2023, Table 2 (proof-read from the page image)
Sikkim Sikkim F&ES Rules 2025Not published: the 2025 Rules set no certificate feeRules 2025 charge only for agency licences (Rs 5,000), appeals (Rs 1,000 and Rs 5,000) and fire reports (Rs 50)Not publishedNot publishedSikkim Fire and Emergency Services Rules 2025 (Gazette 466, 17 December 2025)
Tamil Nadu TNSWPNo fee: the TNFRS procedure sheets say no fees are collectedNOC and fire licence on the TN Single Window Portal; the 2025 Act, not yet in force, leaves fees to rulesNot applicableNo feeTNSWP procedure sheets for TNFRS services, read 24 October 2026
Telangana G.O.Ms.No.142Rs 10 per m²Total built-up areaRevised-NOC inspection capped at Rs 50,000Renewal inspection Rs 10,000G.O.Ms.No.142 of 9 August 2016; G.O.Ms.71 of 2010
Tripura e-District TripuraRs 3,000 a serviceFlat, per recommendation, NOC or certificateNot applicableRs 2,500e-District guidelines; Rules 2026, rule 10, leave fees to a notification not yet found
Uttar Pradesh UP Fire dashboardNil: the UP Fire and Emergency Services dashboard lists no feeOnline application; Schedule VI of the 2024 Rules names who inspects and issues, not a feeNot applicableNilUPF&ES online NOC dashboard; Rules 2024, rule 72 levies only a fire tax of 1% of house tax
Uttarakhand Invest UttarakhandNo fee for the pre-establishment (26.0) or pre-operation (27.0) NOCSingle-window servicesNot applicablePaid by treasury challan (head 0070 60 109); rate not publishedInvest Uttarakhand service listing; UFES checklist
West Bengal WBXPressstudyRs 4.35 to Rs 13.05 per m²Floor area of high-risk buildings, Groups A to DNone publishedRenewal on a prescribed fee; amount not foundNotification 2694/FES/O/3S-33/2016 of 5 February 2020
Andaman and Nicobar Islands (UT) Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026Not publishedFees as may be prescribedNot publishedNot publishedA&N Fire and Emergency Service Regulation 2026
Chandigarh (UT) MCC Office Order 23Rs 6,615 or Rs 14 per m², whichever is more; Rs 12 per m² for industrial and storageBy building group; A-2 homes, A-4 apartments and places of worship exemptMinimum Rs 6,615Not stated in the orderMC Chandigarh Office Order No. 23, effective 1 April 2025
Dadra and Nagar Haveli and Daman and Diu (UT) DNH and DD fire SOPRs 10 per m²Total built-up area, basement includedNone publishedRs 2,500; no late fee at presentNotification of 9 May 2016, cited in the SOPs of 4 August 2025
Delhi (NCT) Delhi Gazette Extraordinary, Part IV No. 314No certificate fee in the rules in forceRs 1,000 a filing from 20 May 2027Not applicableRs 1,000 with each annual Form K, from 20 May 2027DFS (Amendment) Rules 2025, deferred on 16 October 2026
Jammu and Kashmir (UT) J&K Single Window Clearance SystemNot publishedNo fee document on the single windowNot publishedNot publishedJ&K Fire Force Act 1967
Ladakh (UT) Gazette notification S.O. 140Not publishedNo fee found in the 2025 Rules copy readNot publishedNot publishedLadakh Fire Prevention and Fire Safety Rules 2025
Lakshadweep (UT) Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026No application feeRules 2026 prescribe none for the certificateNot applicableNot applicableLakshadweep Fire and Emergency Services Rules 2026 (3 September 2026)
Puducherry (UT) Fire Service Department, PuducherryFreeIssue of NOC or licence by the Divisional Fire OfficerNot applicableNot applicableFire Service Department Citizen Charter

The 16 official schedules: Andhra Pradesh, Assam, Bihar, Chandigarh (MC Office Order 23), Goa, Gujarat, Karnataka (Seva Sindhu), Kerala, Meghalaya, Mizoram, Odisha, Punjab (2021), Telangana, Tripura, West Bengal, and DNH and DD. Maharashtra, Delhi and Telangana have their own Flamekite pages.

Fire NOC fee calculation: worked examples by state

Flamekite’s working from the official rules; no government publishes this figure.

Flamekite's own arithmetic from each state's published rate, for buildings we describe. These are not quotes: the fire service's demand note is the amount you pay.

  1. Case 1

    A 30 m apartment block of 5,000 m² in Gujarat

    Residential, 15 to 35 m band

    What applies Plan approval Rs 1,000, then 5,000 m² x Rs 10 = Rs 50,000 for the certificate: Rs 51,000 for the two stages. Each renewal then costs a flat Rs 1,000. Gujarat Fire Safety Compliance Portal

  2. Case 2

    The same 5,000 m² homes in Mizoram

    Residential building

    What applies 5,000 m² x Rs 2 = Rs 10,000, but the cap cuts it to Rs 5,000. Under the 2016 rates replaced on 6 May 2026 the cap was Rs 2,000. Mizoram Fire and Emergency Services

  3. Case 3

    A 14 m apartment building of 1,200 m² in Kerala

    Apartment house up to 16 m (A4)

    What applies 1,200 m² x Rs 12 = Rs 14,400, below the floor, so the fee is the Rs 20,000 minimum. The annual renewal for a home up to 16 m is Rs 2,500; a 5-year term costs 5 x Rs 2,500 = Rs 12,500. Kerala Fire and Rescue Services

  4. Case 4

    A 20 m hotel of 3,000 m² in Kerala

    Hotel (A5), above 16 m

    What applies 3,000 m² x Rs 40 = Rs 1,20,000, well above the Rs 20,000 minimum. Kerala Fire and Rescue Services

  5. Case 5

    An 8,000 m² commercial building in Andhra Pradesh

    Fire installation estimated at Rs 60 lakh

    What applies Fire precaution fee 8,000 m² x Rs 10 = Rs 80,000, plus a bank guarantee of 15% x Rs 60 lakh = Rs 9 lakh, held for 5 years. AP State Disaster Response and Fire Services

  6. Case 6

    A 2,000 m² high-risk building in West Bengal

    Group A or Group D under the 2020 notification

    What applies Group A: 2,000 m² x Rs 4.35 = Rs 8,700. Group D: 2,000 m² x Rs 13.05 = Rs 26,100, three times as much for the same floor area. WBXPressstudy

  7. Case 7

    A 1,500 m² hotel below 5 stars in Meghalaya

    Hotel up to 4-star

    What applies 1,500 m² x Rs 5 = Rs 7,500 for the certificate, valid 3 years, then a Rs 2,000 renewal fee (whether charged once or for each year of the term is not confirmed). Fire and Emergency Services, Meghalaya

  8. Case 8

    Renewing a 3,000 m² office in Odisha

    Non-residential building

    What applies 3,000 m² x Rs 2 = Rs 6,000 for the renewal certificate. A 3,000 m² home would pay Rs 3,000. Odisha Fire Service

  9. Case 9

    A 10,000 m² building in Daman

    Total built-up area including the basement

    What applies 10,000 m² x Rs 10 = Rs 1,00,000 at the provisional stage, nothing more at the final stage, then Rs 2,500 at each renewal. DNH and DD fire SOP

  10. Case 10

    A Gujarat hospital renewing 208 days late

    Hospital of 15 to 24 m, 4,000 m² built-up

    What applies Certificate fee 4,000 m² x Rs 10 = Rs 40,000. 208 days is 3 blocks of 90 days begun, so the late fee is 3 x 25% x Rs 40,000 = Rs 30,000, on top of the Rs 2,500 renewal fee. Gujarat Fire Safety Compliance Portal

Gujarat fire safety certificate fees: the Annexure 8 rates

Gujarat prices the certificate per m² of built-up area by occupancy and height, from Rs 7 for schools to Rs 50 for 5-star hotels, under Regulations gazetted on 13 December 2023.

Late fees when a fire NOC renewal lapses, by state

A missed renewal costs from Rs 5 a day in Meghalaya to Rs 500 a day in Tripura, and Gujarat multiplies its late fee by every 90 days of delay.

OffencePenaltyLaw
Renewal not filed after expiry (Meghalaya)Nothing for 7 days; Rs 5 a day from day 8 to day 15; Rs 15 a day after thatNotification HPL.179/2017/85 of 12 June 2018, Annexure C Fire and Emergency Services, Meghalaya
Yearly renewal allowed to lapse (Tripura)Rs 500 a day up to Rs 2 lakh, plus 10% of the first application fee; not repeated in the Act as passed in November 2025, so unconfirmedHome (F&ES) notice F.3-8(NOC)/TFES/2025 of 7 July 2025 High Court of Tripura/TFES/2025)
Licence renewed after expiry (Andhra Pradesh)The renewal fee plus 25%Levy of Fee Rules 2006, rule 21 AP State Disaster Response and Fire Services
Certificate renewal filed late (Gujarat)N x 25% of the certificate (FSCA) fee, N being each 90-day blockRegulations 2023, Regulation 11.1, Table 3 Gujarat Fire Safety Compliance Portal
Annual declaration filed late (Gujarat)N x 100% of the plan approval (FSPA) feeRegulations 2023, Table 3 Gujarat Fire Safety Compliance Portal
6-monthly declaration and inspection report filed late (Gujarat)N x 100% of the renewal (FSCR) feeRegulations 2023, Table 3 Gujarat Fire Safety Compliance Portal
Fresh application after a cancelled or rejected certificate (Gujarat)25% of the certificate (FSCA) feeRegulations 2023, Table 3 Gujarat Fire Safety Compliance Portal
Occupying without a Fire Safety Certificate (Assam)Rs 10,000 to Rs 5 lakh by risk classAssam Fire and Emergency Services Act 2025, section 26 Assam Act LIII of 2025
Multistorey building left non-compliant (Bihar)A collective fine of double the provisional NOC feeBihar Fire Service Rules 2021, rule 22(j) Bihar Rules 2021
Fire Safety Officer training certificate not filed (Bihar)Penal fee of Rs 5,000 a monthBihar Fire Service Rules 2021, rule 20(f) Bihar Rules 2021
Renewal missed (DNH and DD)No late fee at presentRenewal SOP of 4 August 2025 DNH and DD fire SOP

Late fees are separate from the penalties for running a building without a fire NOC, which the Fire NOC guide lists state by state. Rajasthan's 2023 order adds a Rs 5,000 penalty for late renewal (direction 11).

How Gujarat's 90-day late-fee formula works, in its own words

Gujarat is the only state whose fee rules include a worked illustration. It counts delay in blocks of 90 days, and a block once begun is charged in full.

Word for word

If an owner/occupier delay making an application for renewal by 208 days, then he or she has to pay 3 times of (25% of FSCA fee) as 208 days = 90+90+28 days

Gujarat Fire Prevention and Life Safety Measures Regulations, 2023, Regulation 11.1, illustration under Table 3 (Gujarat Government Gazette, 13 December 2023) Gujarat Fire Safety Compliance Portal

The same illustration says a 24-day delay in the annual declaration costs 100% of the FSCA fee, but Table 3 itself charges 100% of the FSPA fee for that delay. The regulation contradicts itself, so ask the Regional Fire Officer or Chief Fire Officer which fee applies before paying.

Fire NOC bank guarantees and deposits on top of the fee

Two states make the owner lodge security worth 15% of the fire system for 5 years, and agencies that inspect or install pay their own deposits and licence fees.

In Andhra Pradesh, rule 15 of the 2006 Levy of Fee Rules adds a bank guarantee of 15% of the fire-installation cost, for 5 years, to the Rs 10 per m² fire precaution fee. On a Rs 60 lakh fire system that is Rs 9 lakh of bank limit tied up while the building is built and occupied.

Bihar's Rules 2021 ask for the same 15% bank guarantee, valid for 5 years, with the provisional NOC application in Form B. Rule 22(j) can also charge a non-compliant multistorey building a collective fine of double its provisional NOC fee.

A bank guarantee is security, not a fee: the rules state its size and term, but Flamekite found no published rule on when or how it is released. Ask for the release condition in writing when you lodge it.

Agencies carry their own costs. Tripura's November 2025 call for empanelled inspection agencies asks for a Rs 2,000 application fee, a Rs 5 lakh security deposit and a Rs 20,000 licence fee, and Uttar Pradesh licenses a qualified agency for a Rs 10,000 fee under rule 51 of its 2024 Rules.

Security and agency charges linked to a fire NOC
WhatThe ruleSource
Andhra Pradesh, ownerBank guarantee of 15% of the fire-installation cost, 5 years (rule 15, 2006 Rules)AP State Disaster Response and Fire Services
Bihar, ownerBank guarantee of 15% of the estimated fire-system cost, 5 years, with Form B (rule 15(f)(ii))Bihar Rules 2021
Tripura, inspection agencyRs 2,000 application, Rs 5 lakh security deposit, Rs 20,000 licence fee, licence for 1 yearTripura F&ES
Uttar Pradesh, qualified agencyRs 10,000 with the Form A-5 application (rule 51(1))LegitQueststudy

Fire tax and fire cess: the property-tax levy behind fire NOC fees

Besides the certificate fee, most fire laws let the state add a fire tax to property tax, from 1% of house tax in Uttar Pradesh to up to 10% in Karnataka.

  • Uttar Pradesh

    1% of house tax

    Rule 72 of the UP Fire and Emergency Services Rules 2024 sets the fire tax at one percent of the house tax. LegitQueststudy

  • Bihar

    2.5% of property tax

    Rule 26 of the Bihar Fire Service Rules 2021 levies fire tax at two and a half percent of the property tax the local authority charges, under section 20(2) of the 2014 Act. Bihar Rules 2021

  • Assam

    Rate by notification

    The 1985 Act capped Assam's fire tax at 10% of property tax; section 15 of the 2025 Act that replaced it leaves the rate to a notification, and none was found by 24 October 2026. Assam Act LIII of 2025

  • Karnataka

    Up to 10%, plus a 1% high-rise cess

    Section 15 already allows fire tax up to 10% of property tax. Bill 42 of 2025, enacted as Act 59 of 2025, adds a 1% fire cess on new high-rises, exempts government buildings, and starts on a date not yet notified. Karnataka Bill 42 of 2025

  • Gujarat

    Fire service fee on property tax

    Section 30 of the 2013 Act lets the State levy a fee as a percentage of property tax, paid into the Fire Prevention and Life Safety Fund under section 32. LegitQueststudy

  • Model Bill 2019

    The national template

    Sections 47 and 48 of the Centre's 2019 Model Bill provide a fire tax as a surcharge on property tax, feeding a Fire Prevention and Life Safety Fund. DGFS, MHA

  • Madhya Pradesh

    Surcharge set by the State

    Chapter VIII of Act 16 of 2026 allows a fire tax as a surcharge on property tax at a percentage the State sets, collected by the local body. Government of Madhya Pradesh

  • Lakshadweep

    Rate to be notified

    Rules 16 to 19 of the 2026 Rules provide a fire tax on property tax at a notified rate, and deployment fees by government order. Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026

  • Manipur and Nagaland

    Section 47

    Both 2026 and 2023 Acts provide a property-tax surcharge in section 47; no rate notification was found. Government of Manipur

Fire service user charges: inspections, standby and pumping

Fire services also bill for work beyond the certificate. Kerala publishes the fullest list: a fire engine on standby costs Rs 7,000 to Rs 28,000 a day.

As published

Mumbai's 2026-27 standby and hire charges are in an OCR text Flamekite has not checked against the page image, so they are not repeated here; the Maharashtra page lists the Mumbai fees that were read off the image.

Fire NOC appeal fees: what a refusal costs to challenge

Appeal fees run from Rs 500 in Assam to Rs 5,000 for a second appeal in Uttar Pradesh and Lakshadweep, and Gujarat charges half the original fee.

  1. Assam: Rs 500, then Rs 1,000

    An appeal to the Deputy Director in Form E costs Rs 500, and a review by the Director in Form F costs Rs 1,000; each is decided within 30 days. Assam Home OM

  2. Bihar: Rs 1,000

    Rule 22(f) charges Rs 1,000 for each appeal, paid by bank draft or treasury challan to the Director-cum-State Fire Officer. Bihar Rules 2021

  3. Gujarat: 50% of the fee

    An appeal to the Director, Gujarat State Fire Prevention Services, is filed online within 15 days and costs 50% of the rejected application's fee. Gujarat Fire Safety Compliance Portal

  4. Uttar Pradesh: Rs 1,000, then Rs 5,000

    Rule 66 charges Rs 1,000 for a first appeal and Rs 5,000 for a second, both by bank draft. LegitQueststudy

  5. Lakshadweep: Rs 1,000, then Rs 5,000

    The 2026 Rules charge Rs 1,000 for a first appeal and Rs 5,000 for a second, filed within 30 days. Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026

  6. Manipur and Nagaland: Rs 5,000

    Both Acts fix an appeal fee of Rs 5,000 although neither publishes a certificate fee. Government of Manipur

Is a fire NOC free anywhere? Where the fee is zero

Yes, in 3 places for every certificate and in 2 more for one stage. Check which part is free before you assume nothing is due.

  1. If You apply in Puducherry

    The Citizen Charter says the issue of a NOC or licence by the Divisional Fire Officer is free of cost, in 15 to 30 days. Fire Service Department, Puducherry

  2. If You apply in Himachal Pradesh

    The single-window checklist lists no fee for the Form A application, decided in 30 days under the Public Service Guarantee Act 2011. Emerging Himachal single window

  3. If You apply in Lakshadweep

    The 2026 Rules prescribe no fee for the fire safety certificate; appeals still cost Rs 1,000 or Rs 5,000. Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026

  4. If You want Goa's initial NOC

    It is free, but the final stage carries a licence fee of Rs 10 per m² for most buildings. Directorate of Fire and Emergency Services, Goa

  5. If You want Uttarakhand's pre-operation NOC

    Single-window service 27.0 says no fee is required; the pre-establishment service 26.0 is listed separately. Invest Uttarakhand single window

  6. If You took an Assam recommendation in or after 2016

    You are exempt from paying the recommendation fee again, but the NOC fee of Rs 200 to Rs 4,000 still applies. Fire and Emergency Services, Assam

  7. If You are in Meghalaya and the SOP says no fee

    The 2018 notification charges Rs 3 to Rs 10 per m², and it is the more specific instrument. Expect the fee unless the payment screen shows zero. Invest Meghalaya

Fire NOC fee mistakes that cost owners money

Most overpayments and refusals over fees come from reading an old page, the wrong area or the wrong channel.

  • If Budgeting from Ahmedabad's old fee sheet

    The AMC site still serves a 2015 PDF with inspection charges of Rs 4,000 to Rs 25,000 per tower and a Rs 1,000 NOC charge. Gujarat's Regulations of 13 December 2023 replaced that regime; use Annexure 8. AMC fire department

  • If Using Mizoram's 2022 procedure page

    It still shows Rs 1.50 and Rs 3 per m². The 6 May 2026 notification set Rs 2 and Rs 4 per m² with higher caps of Rs 5,000 and Rs 6,000. Mizoram F&ES

  • If Leaving basements and stilts out of the area

    Andhra Pradesh charges on total built-up area including basements and stilts, and DNH and DD includes the basement. Measure the area the rule names. AP State Disaster Response and Fire Services

  • If Forgetting Kerala's minimum fee

    A small Kerala building pays at least Rs 20,000 or Rs 26,000 whatever its area, after the 2024 revision raised the floors from Rs 18,200 and Rs 24,300. Kerala Fire and Rescue Services

  • If Paying a Pimpri-Chinchwad fire fee by cheque or cash

    PCMC takes fire NOC fees only by RTGS, NEFT or IMPS into its Fire Protection Fund account; a demand draft, cheque or cash is refused. PCMC

  • If Paying the DNH and DD per-m² fee twice

    The final-stage SOP charges Rs 10 per m² only if it was not paid at the provisional stage. DNH and DD fire SOP

  • If Renewing an expired Assam NOC

    Once the NOC has expired, Assam wants a fresh application, so the full fee applies again instead of the 10% renewal fee. Renew before expiry. Fire and Emergency Services, Assam

Fire NOC fee myths, checked against the notifications

Six beliefs about fire NOC fees, each tested against the state's own instrument.

  • You may have read

    The fire NOC fee is the same everywhere in India.

    Myth

    What the sources say

    Rates differ 60 times over: Odisha charges Rs 1 per m² for a home and Karnataka Rs 60 per m² for a non-residential high-rise. Odisha Fire Service

  • You may have read

    A free initial NOC means the whole process is free.

    Myth

    What the sources say

    Goa's initial NOC is free, but its licence fee is Rs 10 per m² for most buildings. Directorate of Fire and Emergency Services, Goa

  • You may have read

    A consultant's quote is the government fee.

    Myth

    What the sources say

    The statutory fee is the figure in the notification, such as Rs 2 per m² capped at Rs 5,000 for a Mizoram home; any amount above it is a private charge. Mizoram Fire and Emergency Services

  • You may have read

    Renewal costs as much as the first certificate.

    Myth

    What the sources say

    Usually far less: Assam charges 10% of the NOC fee, and Gujarat a flat Rs 1,000 to Rs 7,000 instead of its per-m² certificate fee. Fire and Emergency Services, Assam

  • You may have read

    Delhi already charges Rs 1,000 a year for Form K.

    Myth

    What the sources say

    That fee belongs to rules whose start was deferred on 16 October 2026 to 20 May 2027. Delhi Gazette Extraordinary, Part IV No. 314

  • You may have read

    A 5-year Kerala NOC is a discount.

    Myth

    What the sources say

    It costs 5 times the annual fee, so the price per year is the same; you save the yearly applications, not money. Home Department, Kerala

Fire NOC fee terms: FSPA, FSCA, fire precaution fee and more

The 9 fee names that appear on fire NOC demand notes, with the instrument each comes from.

Fire precaution fee
The per-m² fee for a fire NOC in Andhra Pradesh and Telangana, Rs 10 per m² of total built-up area. G.O.Ms.No.142
FSPA fee
Gujarat's flat Fire Safety Plan Approval fee, Rs 1,000 to Rs 7,000, paid at the plan stage. Gujarat Fire Safety Compliance Portal
FSCA fee
Gujarat's Fire Safety Certificate Approval fee, Rs 7 to Rs 50 per m² of built-up area; late fees are a share of it. Gujarat Fire Safety Compliance Portal
FSCR and FSCRe fees
Gujarat's flat renewal fees: FSCR for a certificate (Rs 1,000 to Rs 7,000) and FSCRe for renewing an existing building's plan (Rs 1,000 to Rs 5,000, Annexure 9). Gujarat Fire Safety Compliance Portal
Fire fighting preparedness fee
Kerala's annual renewal fee for high-rise buildings, Rs 2,500 to Rs 12,000 under G.O.(Ms)No.272/2024. Kerala Fire and Rescue Services
Licence fee
Goa's name for the fee charged at the final stage, Rs 10 per m² for most categories. Directorate of Fire and Emergency Services, Goa
Recommendation fee
Assam's plan-stage fee for a Fire Safety Recommendation, equal to the NOC fee for the same building. Fire and Emergency Services, Assam
Fire tax
A surcharge on property tax that funds the fire service, such as 1% of house tax in Uttar Pradesh. LegitQueststudy
Fire cess
Karnataka's 1% surcharge on the property tax of new high-rises under Act 59 of 2025, once it is notified. Karnataka Bill 42 of 2025

Fire NOC fee revisions, 2006 to 2025

Most fee schedules in force today date from 2016 or later; Andhra Pradesh's 2006 rules are the oldest still cited.

  1. 8 December 2006

    Andhra Pradesh notifies its Levy of Fee Rules (G.O.Ms.306); the copy on the state portal charges Rs 10 per m² plus a 15% bank guarantee. AP State Disaster Response and Fire Services

  2. 9 May 2016

    Dadra and Nagar Haveli and Daman and Diu set Rs 10 per m² of built-up area, the rate their 2025 SOPs still cite. DNH and DD fire SOP

  3. 22 July 2016

    Mizoram notifies the NOC fee rates that stood until 6 May 2026. Mizoram Fire and Emergency Services

  4. 9 August 2016

    Telangana's G.O.Ms.No.142 sets the fire precaution fee at Rs 10 per m². G.O.Ms.No.142

  5. 9 February 2018

    West Bengal's amendment Bill adds renewal of a fire safety certificate on payment of a prescribed fee. West Bengal Legislative Assembly

  6. 12 June 2018

    Meghalaya levies Rs 3 to Rs 10 per m², annual renewal fees and a daily late fee. Fire and Emergency Services, Meghalaya

  7. 5 February 2020

    West Bengal sets Rs 4.35 to Rs 13.05 per m² for high-risk buildings. WBXPressstudy

  8. 13 December 2023

    Gujarat gazettes its 2023 Regulations with fee Annexures 8 and 9 and the 90-day late-fee table. Gujarat Fire Safety Compliance Portal

  9. 2024

    Kerala's G.O.(Ms)No.272/2024 lifts its rates by 3.6% to 15% and its minimum fees by 7% to 9.9%. Kerala Fire and Rescue Services

  10. 1 April 2025

    Chandigarh's municipal corporation sets fire certificate charges of Rs 6,615 or Rs 14 per m² by Office Order No. 23. MCC Office Order 23

  11. 7 July 2025

    Tripura sets a lapse fee of Rs 500 a day, up to Rs 2 lakh, for missed yearly renewals; the Act passed that November does not repeat it. High Court of Tripura/TFES/2025)

  12. 4 August 2025

    Kerala allows a 5-year NOC for non-hazardous buildings at 5 times the annual fee. Home Department, Kerala

Fire NOC fee changes in 2026, latest first

From news reports, not yet an official source.

Checked against state notifications and fire service portals on 24 October 2026. Flamekite adds each new fee instrument here when it is found.

Paying a fire NOC fee: the safe way and the costly way

Pay only through the channel the fire service names, and keep the proof of payment for the next stage.

Do

  • Pay Tripura's fees on e-District through e-GRAS, the state's own payment gateway. e-District Tripura
  • In DNH and DD, wait for the approval email, then pay by the PFMS challan or e-payment link it carries. DNH and DD fire SOP
  • Keep the Fire Protection Fund fee receipt: Maharashtra's Director lists it among the 14 documents for a Provisional NOC. MFS e-fire
  • Pay Odisha's renewal fee online to the authorised office for your area, as the service page directs. Odisha Fire Service

Don’t

What Flamekite could not confirm about fire NOC fees

These fee gaps are real on 24 October 2026. Any page that prints a figure for them should show the notification it came from.

  • Madhya Pradesh's fee: the e-Nagar Palika fire manual describes no payment step and the public dashboard shows none; the portal may show a fee only after login. MP e-Nagar Palika manual
  • Whether Uttar Pradesh's Nil fee is set by an order: the 2024 Rules contain no certificate fee (Schedule VI names the issuing officers), and the dashboard shows Nil, but no fee-waiver notification was found. UP Fire dashboard
  • Maharashtra's state Fire and Emergency Service Fee in Schedule-II of the 2023 Act: the table could not be read. Amendment Act 2023
  • Whether Rajasthan's per-sq-ft fee is charged again at each yearly renewal, or only the flat renewal application fee: the 2023 order's Table 2 prices both and does not say. Rajasthan UDH
  • Haryana under the 2022 Act: the ULB service page that said no fee (archived 18 February 2026) still cited the 2009 Act and now returns 404, and no fee notification under the 2022 Act was found. ULB Haryana
  • Punjab under the 2024 Act: no fee has been prescribed that Flamekite found, so the October 2021 letter is the last official schedule; the portal's current fee PDF could not be opened. Local Govt Punjab
  • Karnataka: an undated report of Rs 50,000 to Rs 2 lakh per block to re-inspect high-rises has no official text behind it; the 2023 amendment only says a fee may be prescribed. Government of Karnataka
  • West Bengal's fee Groups A to D: the 2020 notification copy prints the rates but not which buildings fall in each group, nor whether it is the recommendation or certificate fee. WBXPressstudy
  • Tripura's Rs 3,000 and Rs 2,500 figures come from e-District guidelines that may predate the 2026 Rules, which leave fees to a notification. e-District Tripura
  • Madhya Pradesh: the e-Nagarpalika dashboard shows an average fee of 0 for 1,772 applications, which reflects how fees are recorded, not a free NOC. Urban Administration and Development Department, Madhya Pradesh
  • Consultants' fees: no official source publishes them, so Flamekite prints no figure; one consultancy's national guide gives only brackets and no state rate. CGWA NOCnews report
  • Kerala's 2024 fee G.O.: its date is not legible on the copy the Kerala NOC portal serves. Kerala Fire and Rescue Services

Questions about fire NOC fees

How much is the fire NOC fee in India?

There is no single fee: each state sets its own. Published rates run from Rs 1 per m² for an Odisha home to Rs 60 per m² for a Karnataka non-residential high-rise, and Tamil Nadu, Uttar Pradesh, Jharkhand, Arunachal Pradesh, Puducherry, Himachal Pradesh and Lakshadweep charge nothing. Only 17 of 36 states and UTs publish a rate Flamekite could read.

How is the fire NOC fee calculated?

Usually area times rate: the built-up or floor area on the approved plan multiplied by your state's rate for the occupancy and height. Then apply any minimum (Rs 20,000 in Kerala) or cap (Rs 5,000 for a Mizoram home), and add flat stage fees such as Gujarat's Rs 1,000 to Rs 7,000 plan fee.

What is the fire NOC renewal fee?

It depends on the state: Rs 2,500 in DNH and DD and Tripura, 10% of the NOC fee in Assam, Rs 2,500 to Rs 12,000 a year for Kerala high-rises, Rs 500 to Rs 3,500 in Meghalaya (headed annual, for a certificate now valid 3 years), and Rs 1 or Rs 2 per m² in Odisha.

Is there a late fee for fire NOC renewal?

Yes, in several states. Meghalaya charges Rs 5 a day after 7 free days and Rs 15 a day after day 15, Tripura Rs 500 a day up to Rs 2 lakh under a July 2025 notice (unconfirmed since its 2025 Act), Andhra Pradesh 25% extra, and Gujarat 25% of the certificate fee for each 90-day block. DNH and DD charges none at present.

What are the fire NOC charges in Gujarat?

A flat plan fee of Rs 1,000 to Rs 7,000, a certificate fee of Rs 7 to Rs 50 per m² of built-up area, and a flat renewal fee of Rs 1,000 to Rs 7,000, by occupancy and height, under Annexure 8 of the 2023 Regulations. A temporary structure pays Rs 2,000.

What is the fire NOC fee in Kerala?

Rs 12 to Rs 50 per m² of built-up area, with a minimum of Rs 20,000 for homes, schools and hotels or Rs 26,000 for other buildings, under G.O.(Ms)No.272/2024. High-rises then pay Rs 2,500 to Rs 12,000 a year to renew.

Do I need a bank guarantee for a fire NOC?

In Andhra Pradesh and Bihar, yes: a bank guarantee of 15% of the fire-system cost, valid 5 years, on top of the fee. Flamekite found no such guarantee in the other states' published rules.

Do I have to pay fire tax as well as the fire NOC fee?

Often, yes, through your property tax rather than at the fire office: Uttar Pradesh adds 1% of house tax and Bihar 2.5% of property tax, and Karnataka may add up to 10%. Assam's 2025 Act leaves its rate to a notification not yet made.

Keep reading

Keep exploring

Sources

Each source was opened and read on the date shown. How Flamekite checks its sources

  1. Mizoram Fire and Emergency Services: Home Department notification G/262/2026-HM (F&ES), 6 May 2026: rate of NOC fees (opens in a new tab)checked 24 October 2026
  2. Kerala Fire and Rescue Services: Fee structure, G.O.(Ms)No.272/2024/Home (opens in a new tab)checked 24 October 2026
  3. Gujarat Fire Safety Compliance Portal (GujFireSafety CoP): Gujarat Fire Prevention and Life Safety Measures Regulations, 2023 (fees in Annexure 8) (opens in a new tab)checked 25 October 2026
  4. Odisha Fire Service: Service details: Fire Safety Renewal Certificate (fee Rs 1 per m² residential, Rs 2 per m² non-residential; Form VI with Form III) (opens in a new tab)checked 25 October 2026
  5. AP State Disaster Response and Fire Services: AP Fire and Emergency Operations and Levy of Fee Rules, 2006 (G.O.Ms.306, 8 December 2006) (opens in a new tab)checked 24 October 2026
  6. Government of Bihar, Home Department (English copy hosted by Bihar Fire Service): Bihar Fire Service Rules, 2021: rule 15 (NOC thresholds, forms, validity, renewal), rules 20 to 26 and Schedule C (opens in a new tab)checked 24 October 2026
Show all 68 sourcesShow fewer
  1. Directorate of Fire and Emergency Services, Tripura: Expression of interest for empanelled fire inspection agencies, November 2025 (application Rs 2,000, security deposit Rs 5 lakh, licence fee Rs 20,000) (opens in a new tab)checked 24 October 2026
  2. Fire Service Department, Puducherry: Services: issue of fire NOC or licence, free (categories and validity are in G.O.Ms.No.61, source py-go61-scan) (opens in a new tab)checked 24 October 2026
  3. Department of Fire and Emergency Services, DNH and DD (single window): SOP for renewal of the fire NOC, 4 August 2025: Rs 2,500, no late fee at present (opens in a new tab)checked 24 October 2026
  4. Fire and Emergency Services, Meghalaya: Notification HPL.179/2017/85, 12 June 2018: fee structure and annual renewal fees (opens in a new tab)checked 24 October 2026
  5. EoDB Arunachal Pradesh single window (Department of Finance, Planning and Investment): Services: Fire and Emergency Services: Application for Fire Safety Certificate, NOC prior to construction, and Renewal of Fire Safety Certificate, with each service's requirements (documents, no fee, 15 days) (opens in a new tab)checked 24 October 2026
  6. Fire and Emergency Services, Assam: Fee structure for fire NOC through the EoDB payment gateway (renewal fee 10% of NOC fee) (opens in a new tab)checked 24 October 2026
  7. Bihar Fire Service: Fire NOC and Audit portal: Schedule C, prescribed rate of fee for NOC, renewal, fire audit and fire consultation (opens in a new tab)checked 25 October 2026
  8. Fire and Emergency Services and SDRF, Chhattisgarh: CG Fire NOC portal: New NOC, NOC Renewal, Fire Audit (with helplines) (opens in a new tab)checked 25 October 2026
  9. Directorate of Fire and Emergency Services, Goa: BRAP 2024 item 284: fire NOC fees and timeline (opens in a new tab)checked 25 October 2026
  10. Directorate of Urban Local Bodies, Haryana (Wayback Machine copy of 18 February 2026; the live page now returns 404): Approval or Renewal of Fire NOC: no fee, 60 days under the Right to Service Act 2014, checklist above 15 m, 48-hour inspection upload (opens in a new tab)checked 24 October 2026
  11. Emerging Himachal single window: Fire NOC checklist and procedure (Form A) (opens in a new tab)checked 24 October 2026
  12. Fire Service Headquarters, Jharkhand, Ranchi (posted on the Single Window as its fee document): Letter No. 671 of 18 December 2020: no fee for Fire Advisory, NOC or renewal issued online through the Single Window (opens in a new tab)checked 24 October 2026
  13. Seva Sindhu, Government of Karnataka: Application for No Objection Certificate (High rise Building) - Fire & Emergency: documents, fee under G.O. of 13-09-2019, 60 working days (opens in a new tab)checked 24 October 2026
  14. Urban Administration and Development Department, Madhya Pradesh (e-Nagar Palika): User manual, citizen side: Fire Safety Certificate, version 1.0 (15 November 2025, in force from 30 May 2025) (opens in a new tab)checked 24 October 2026
  15. Government of Maharashtra (copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023 (Mah. Act No. XXIV of 2023), first published 11 May 2023 (opens in a new tab)checked 25 October 2026
  16. Government of Manipur (PRS copy): Manipur Fire and Emergency Service Act, 2026 (Act 9 of 2026) (opens in a new tab)checked 24 October 2026
  17. Directorate of Fire and Emergency Services, Nagaland: Nagaland Fire and Emergency Services Act (Act No. 5 of 2023), Nagaland Gazette, 31 August 2023 (opens in a new tab)checked 24 October 2026
  18. Odisha Fire and Emergency Service: Service details: Fire Safety Recommendation under rule 12 (fee Rs 1 or Rs 2 per m² through IFMS; 7 documents) (opens in a new tab)checked 24 October 2026
  19. Directorate of Local Government, Punjab (Wayback Machine copy of 21 March 2022 of the portal's fee download): Letter No. S4-DSMS-(Fire)-2021/41343 of 8 October 2021: new fees for online fire NOCs, by NBC zone, with provisional, renewal and 30-day rules (opens in a new tab)checked 25 October 2026
  20. Urban Development, Housing and Local Self Government Departments, Rajasthan: Joint order No. P.11(9)UDH/2020 Part, 14 September 2023, on the fire safety certificate and fire NOC (18-page Hindi scan) (opens in a new tab)checked 25 October 2026
  21. Government of Sikkim, Sikkim Government Gazette Extraordinary No. 466, 17 December 2025: The Sikkim Fire and Emergency Services Rules, 2025: Home Department notification No. 99/Home/2025, 17 December 2025, under section 63 of Act 4 of 2023, with Schedules I to V and Forms A1 to A20 (opens in a new tab)checked 25 October 2026
  22. Guidance Tamil Nadu, Tamil Nadu Single Window Portal: No Objection Certificate for Multi Storied Buildings (18.3 m and above) from TNFRS: procedure, documents, timelines and fees (opens in a new tab)checked 24 October 2026
  23. Government of Telangana, Home (Ser.IV) Department: G.O.Ms.No.142, Home (Ser.IV), 9 August 2016: fire precaution fee amending the Levy of Fee Rules, 2006 (opens in a new tab)checked 24 October 2026
  24. e-District Tripura: Guidelines for fire safety certificate and NOC services (Aadhaar e-sign, e-GRAS payment) (opens in a new tab)checked 24 October 2026
  25. Uttar Pradesh Fire and Emergency Services: Dashboard: provisional, final and renewal applications, approvals and days to certificate (printed 24 October 2026) (opens in a new tab)checked 24 October 2026
  26. Invest Uttarakhand single window: Fees for application of Pre-establishment Fire NOC: no fees required (opens in a new tab)checked 24 October 2026
  27. Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026: Andaman and Nicobar Islands Fire and Emergency Service Regulation, 2026 (No. 5 of 2026) (opens in a new tab)checked 24 October 2026
  28. Municipal Corporation Chandigarh, Fire and Rescue Services: Office Order No. 23 of 10 February 2025: Fire Safety Certificate charges by NBC occupancy group from 1 April 2025, validity 3 years, exemptions (read from the page images) (opens in a new tab)checked 25 October 2026
  29. Department of Fire and Emergency Services, DNH and DD (single window): SOP for the provisional fire NOC, 4 August 2025: Rs 10 per m² of total built-up area under the notification of 9 May 2016 (opens in a new tab)checked 24 October 2026
  30. Delhi Gazette Extraordinary, Part IV No. 314 (SG-DL-E-17102026-277257): Home Department notification F. No. 6/DFS/MS/HQ/MISC/2026/01/631, 16 October 2026: commencement of amended Rules 34 to 38 extended to 20 May 2027 (opens in a new tab)checked 24 October 2026
  31. J&K Single Window Clearance System: Turn-around time: provisional and final or renewal fire NOC (opens in a new tab)checked 24 October 2026
  32. Gazette notification S.O. 140 (copy hosted by Simpliance): Ladakh Fire Prevention and Fire Safety Rules, 2025 (S.O. 140, 28 November 2025) (opens in a new tab)checked 24 October 2026
  33. Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026: Lakshadweep Fire and Emergency Services Rules, 2026 (Rule 12: 5-year fire safety certificate) (opens in a new tab)checked 24 October 2026
  34. High Court of Tripura (copy with the 2025 amendments and Home notice F.3-8(NOC)/TFES/2025): Tripura Fire and Emergency Services Act, 2022, section 26(C) and renewal lapse fee (opens in a new tab)checked 24 October 2026
  35. Assam Gazette Extraordinary No. 811, 24 December 2025 (PRS copy of the gazette): The Assam Fire and Emergency Services Act, 2025 (Assam Act No. LIII of 2025), notification No. LGL.52/2025/3: sections 1 to 67 and Schedule I (opens in a new tab)checked 25 October 2026
  36. Karnataka Legislative Assembly (PRS copy): Karnataka Fire Force (Amendment) Bill, 2025 (L.A. Bill No. 42 of 2025): 1% fire cess on property tax of new high-rises; section 15 fire tax up to 10% (opens in a new tab)checked 24 October 2026
  37. Directorate General Fire Services, Civil Defence and Home Guards (MHA): Revised Model Fire and Emergency Service Bill, 2019 (opens in a new tab)checked 26 October 2026
  38. Government of Madhya Pradesh (PRS copy of MP Gazette Extraordinary, 3 September 2026): MP Agnishaman Evam Apatkalin Sevayen Adhiniyam, 2026 (MP Act 16 of 2026) (opens in a new tab)checked 24 October 2026
  39. Delhi Fire Service: Free fire fighting services and standby water tender charges (opens in a new tab)checked 24 October 2026
  40. Directorate of Fire and Emergency Services, Goa: Acts, Rules, Citizen's Charter and RTI: fee schedule of the Goa State Fire Force Rules, including stand-by appliances at Rs 2,000 a day (opens in a new tab)checked 24 October 2026
  41. Telangana State Disaster Response and Fire Services Department: Circular Memorandum Rc.No.4039-2/EODB/2015, 5 March 2016: revision of the period of renewal of NOC, risk categories and random inspections (quotes section 13 of the Fire Service Act, 1999) (opens in a new tab)checked 25 October 2026
  42. Home (A) Department, Assam (on the Fire and Emergency Services site): Office Memorandum No. HMA.177/2012 (March 2013): fire NOC timelines, appeal fee Rs 500 and review fee Rs 1,000 (opens in a new tab)checked 24 October 2026
  43. Invest Uttarakhand single window: Service listing: fire services 26.0 and 27.0 (opens in a new tab)checked 25 October 2026
  44. Fire and Emergency Services, Assam: Process flow of service delivery: Recommendation, then NOC, through the EoDB portal (opens in a new tab)checked 24 October 2026
  45. Invest Meghalaya: Standard operating procedure for fire clearance (opens in a new tab)checked 24 October 2026
  46. Ahmedabad Municipal Corporation, Fire and Emergency Services: Documents required for obtaining an NOC (PDF created 29 June 2015): inspection charges Rs 4,000 to Rs 25,000 per tower, NOC charge Rs 1,000 (opens in a new tab)checked 24 October 2026
  47. Mizoram Fire and Emergency Services: Instruction and procedure for obtaining a fire NOC (12 October 2022): Rs 20 paper application fee and the superseded Rs 1.50 and Rs 3 per m² rates (opens in a new tab)checked 24 October 2026
  48. Pimpri Chinchwad Municipal Corporation: Fire Department: duties, 6 stations, contacts and fire NOC fee payment (opens in a new tab)checked 24 October 2026
  49. Department of Fire and Emergency Services, DNH and DD (single window): SOP for the final fire NOC, 4 August 2025: Rs 10 per m² if not paid at the provisional stage (opens in a new tab)checked 24 October 2026
  50. Home (F) Department, Kerala (on the Kerala Fire and Rescue renewal portal): G.O.(Ms)No.143/2025/HOME, 4 August 2025: fire NOC valid 5 years (non-hazardous) or 2 years (hazardous) (opens in a new tab)checked 24 October 2026
  51. West Bengal Legislative Assembly (PRS copy): West Bengal Fire Services (Amendment) Bill, 2018: section 11C(3A), 3-year fire safety certificate (opens in a new tab)checked 24 October 2026
  52. Gazette of India Extraordinary (CG-DL-E-02062026-273069): Dadra and Nagar Haveli and Daman and Diu Fire and Emergency Service Regulation, 2026 (No. 6 of 2026) (opens in a new tab)checked 24 October 2026
  53. Directorate of Fire and Emergency Services, Tripura: Tripura Fire Safety Rules, 2026 (Tripura Gazette, 2 June 2026) (opens in a new tab)checked 24 October 2026
  54. Municipal Corporation of Greater Mumbai, Mumbai Fire Brigade: Revised schedule of fees for the year 2026-27, BRC No. 69 dated 30.03.2026 (rows 1 to 6 and 28 read off the page images) (opens in a new tab)checked 24 October 2026
  55. Maharashtra Fire and Emergency Services: E-Approval online application: documents for Provisional and Final NOC, and the 7-working-day service line (opens in a new tab)checked 24 October 2026
  56. Government of Karnataka (PRS copy): Karnataka Fire Force (Amendment) Ordinance, 2023: section 13(3) high-rise NOC (opens in a new tab)checked 25 October 2026
  57. Urban Administration and Development Department, Madhya Pradesh (e-Nagarpalika): Online Single Window System Dashboard for Fire NOC (queried 1 April 2020 to 24 October 2026 for Bhopal, Indore, Jabalpur and Gwalior) (opens in a new tab)checked 24 October 2026
  58. Delhi Fire Service (copy of Delhi Gazette Extraordinary, Part IV): Delhi Fire Service (Amendment) Rules, 2025, notification F.No. DFS/HQ/Misc/2025/01(E-259159)/237, gazetted 26 May 2026 (opens in a new tab)checked 25 October 2026
  59. LegitQuest (legal database): Uttar Pradesh Fire and Emergency Services Rules, 2024: Rule 44 validity, Rule 46 cancellation (opens in a new tab)Peer-reviewed study · checked 24 October 2026
  60. WBXPress (legal database): Fire NOC fees, West Bengal Fire and Emergency Services (2020 notification) (opens in a new tab)Peer-reviewed study · checked 24 October 2026
  61. LegitQuest (legal database): Gujarat Fire Prevention and Life Safety Measures Act, 2013: sections 21, 26 and 39 (opens in a new tab)Peer-reviewed study · checked 24 October 2026
  62. CGWA NOC (consultancy blog): Fire NOC fees and charges (28 April 2026): national budget brackets, no state figures (opens in a new tab)News report · checked 24 October 2026