Fire NOC fee calculator: your fee from your state's published schedule
Updated By Flamekite Editorial DeskFacts checked against official sources on
Work out your fire NOC fee from your state's published schedule: use, area and height in, the fee, renewal and schedule out. 17 states and UTs publish a rate.
Quick answer
A fire NOC fee is your state's rate times the area its schedule names, then any minimum, cap or flat stage fee. Rates run from Rs 1 per m² for a home in Odisha to Rs 60 per m² for a non-residential high-rise in Karnataka, with a Rs 5,00,000 minimum.
Only 17 of 36 states and UTs publish a rate Flamekite could read. Tamil Nadu, Uttar Pradesh, Jharkhand, Arunachal Pradesh, Puducherry, Himachal Pradesh and Lakshadweep charge nothing; the rest publish no schedule. Pick your state below for the fee, the schedule it comes from and the renewal.
Free, on WhatsApp. Or check if you need one
Fire NOC fee rates by state: the 17 published schedules
| Option | Rate | Charged on | Minimum, cap or extra | Source |
|---|---|---|---|---|
| Andhra Pradesh | Rs 10 per m² | Total built-up area, basements and stilts included | 15% bank guarantee on the fire system | AP State Disaster Response and Fire Services |
| Assam | Rs 200 to Rs 4,000 a stage | Occupancy, height band and area | Recommendation and certificate cost the same | Assam fee Annexure A |
| Bihar | Rs 2 to Rs 10 per m² provisional; Rs 1 to Rs 5 final | Total floor area, basement included | 15% bank guarantee | BFS fee PDF |
| Chandigarh | Rs 14 per m²; Rs 12 industrial and storage | Covered area | Minimum Rs 6,615; homes and apartments exempt | MCC Office Order 23 |
| Goa | Rs 10 per m² licence fee | Built-up area | Initial NOC free; Rs 150 a year for eateries up to 50 seats | Directorate of Fire and Emergency Services, Goa |
| Gujarat | Rs 7 to Rs 50 per m² | Built-up area, by occupancy and height | Plus a flat plan fee of Rs 1,000 to Rs 7,000 | Gujarat Fire Safety Compliance Portal |
| Karnataka | Rs 35 per m² residential; Rs 60 others | Total built-up area of a high-rise of 21 m or more | Minimum Rs 2,50,000 or Rs 5,00,000 | Seva Sindhu |
| Kerala | Rs 12 to Rs 50 per m² | Built-up area, by occupancy and height | Minimum Rs 20,000 or Rs 26,000 | Kerala Fire and Rescue Services |
| Meghalaya | Rs 3 to Rs 10 per m² | Floor area in commercial use | None published | Meghalaya F&ES |
| Mizoram | Rs 2 per m² homes; Rs 4 others | Floor area | Capped at Rs 5,000 or Rs 6,000 | Mizoram Fire and Emergency Services |
| Odisha | Rs 1 per m² homes; Rs 2 others | Built-up area, at the recommendation and again at the certificate | None published | OFES FSR service |
| Punjab | Rs 5,000 to Rs 50,000 flat | Use, height and plot size | Caps up to Rs 2,00,000 | Local Govt Punjab |
| Rajasthan | Rs 2, Rs 1.50 or Rs 1 per sq ft | Gross built-up area, by local body | Renewal Rs 10,000, Rs 7,500 or Rs 5,000 | Rajasthan UDH |
| Telangana | Rs 10 per m² | Total built-up area | Renewal inspection Rs 10,000 | G.O.Ms.No.142 |
| Tripura | Rs 3,000 a service | Flat, per recommendation or certificate | Renewal Rs 2,500 | e-District Tripura |
| West Bengal | Rs 4.35 to Rs 13.05 per m² | Floor area, Groups A to D | None published | WBFES |
| Dadra and Nagar Haveli and Daman and Diu | Rs 10 per m² | Total built-up area, basement included | Renewal Rs 2,500 | DNH and DD fire SOP |
How the fire NOC fee is worked out, in 5 steps
Find your state's schedule
The calculator names the notification or order each fee comes from. Seven states and UTs charge nothing, and the rest publish no schedule Flamekite could read.
Place the building in a row
Most schedules price by use and height: Gujarat charges a 15 m to 35 m apartment block Rs 10 per m² but a block above 60 m Rs 20 per m².
Measure the area the rule names
Andhra Pradesh counts basements and stilts, Bihar every floor with the basement, Meghalaya the floor area in commercial use, and Rajasthan square feet. Use the area on the approved plan.
Multiply, then apply the minimum or cap
Kerala lifts a result below Rs 20,000 or Rs 26,000 to that minimum; Mizoram cuts one above Rs 5,000 or Rs 6,000 to the cap; Karnataka's floor is Rs 2,50,000 or Rs 5,00,000.
Add the stage fees and security
Gujarat adds a flat plan fee; Assam and Odisha charge the same again at the second stage; Andhra Pradesh and Bihar add a bank guarantee of 15% of the fire-system cost for 5 years.
Fire NOC fee calculation: 6 worked buildings
Flamekite’s working from the official rules; no government publishes this figure.
Flamekite's arithmetic from each state's published rate. Not quotes: the demand note is what you pay.
Case 1
A 20 m hotel of 3,000 m² in Kerala
Hotel (A5), above 16 m
What applies 3,000 m² x Rs 40 = Rs 1,20,000, well above the Rs 20,000 minimum. Kerala Fire and Rescue Services
Case 2
A 14 m apartment building of 1,200 m² in Kerala
Flats (A4) up to 16 m
What applies 1,200 m² x Rs 12 = Rs 14,400, below the floor, so the fee is the Rs 20,000 minimum. Kerala Fire and Rescue Services
Case 3
A 30 m apartment block of 5,000 m² in Gujarat
Residential, 15 m to 35 m band
What applies Plan approval Rs 1,000, then 5,000 m² x Rs 10 = Rs 50,000: Rs 51,000 for both stages, and Rs 1,000 at each renewal. Gujarat Fire Safety Compliance Portal
Case 4
The same 5,000 m² of homes in Mizoram
Residential
What applies 5,000 m² x Rs 2 = Rs 10,000, cut to the Rs 5,000 cap. Mizoram Fire and Emergency Services
Case 5
An 8,000 m² commercial building in Andhra Pradesh
Fire installation estimated at Rs 60 lakh
What applies 8,000 m² x Rs 10 = Rs 80,000, plus a bank guarantee of 15% x Rs 60 lakh = Rs 9 lakh, held for 5 years. AP State Disaster Response and Fire Services
Case 6
A marriage hall of 800 m² in Bihar
Assembly, ground floor
What applies Rs 4 per m² provisional (Rs 3,200) and Rs 2 per m² final (Rs 1,600), then Rs 1,600 at each renewal. BFS fee PDF
When the calculator says ask us
It gives a number only where a proof-read row of the schedule holds the building.
If Gujarat or Kerala rows not proof-read
Both price each occupancy and height band separately, and Flamekite has read only some rows. The calculator names the ones it has and says so for the rest. Gujarat Fire Safety Compliance Portal
If A factory in Assam or Meghalaya
The rate follows the hazard class, which the calculator does not ask, so it shows the range. Meghalaya F&ES
If Punjab
Punjab charges a flat fee by use and plot size, not by area, so the calculator shows the lines for your use. Local Govt Punjab
If Your state publishes no schedule
Pay what the portal or demand note shows; ask us and we find the current figure for your building.
Questions about the fire NOC fee calculator
How is a fire NOC fee calculated?
Which states charge no fire NOC fee?
Is the fire NOC fee charged on carpet area or built-up area?
Does the fire NOC fee include the renewal?
Is the fire NOC fee the same as the fire cess?
Keep reading
- Fire NOC fees in all 36 statesEvery state's rate, renewal fee and late fee.
- Fire NOC guideWhat it is, who needs it and how to get it.
- Fire NOC validityHow long a certificate lasts in each state.
- Fire NOC renewalWhen and how to renew.
- Fire NOC in KeralaThe 2024 fee order by occupancy.
- Fire NOC in GujaratAnnexure 8 rates and the 90-day late fee.
Free tools for this
- Do I need a fire NOC?Pick your state, building use, height and floor area
- Renewal date calculatorEnter your state and the expiry date on your fire NOC
- Fire tank calculatorFire tank capacity calculation for your building: the underground and terrace tank in litres and the fire pump set, from the NBC 2016 Table 7 row
Words on this page, explained
Keep exploring
More in All free tools
Sources
Each source was opened and read on the date shown. How Flamekite checks its sources
- AP State Disaster Response and Fire Services: AP Fire and Emergency Operations and Levy of Fee Rules, 2006 (G.O.Ms.306, 8 December 2006) (opens in a new tab)
- Fire and Emergency Services, Assam: Annexure A, proposed rates of fee for issuance of No Objection Certificate, renewal NOC etc. (5 image pages, read from the page images) (opens in a new tab)
- Bihar Fire Service: Fire NOC and Audit portal: Schedule C, prescribed rate of fee for NOC, renewal, fire audit and fire consultation (opens in a new tab)
- Municipal Corporation Chandigarh, Fire and Rescue Services: Office Order No. 23 of 10 February 2025: Fire Safety Certificate charges by NBC occupancy group from 1 April 2025, validity 3 years, exemptions (read from the page images) (opens in a new tab)
- Directorate of Fire and Emergency Services, Goa: BRAP 2024 item 284: fire NOC fees and timeline (opens in a new tab)
- Gujarat Fire Safety Compliance Portal (GujFireSafety CoP): Gujarat Fire Prevention and Life Safety Measures Regulations, 2023 (fees in Annexure 8) (opens in a new tab)
Show all 29 sourcesShow fewer
- Seva Sindhu, Government of Karnataka: Application for No Objection Certificate (High rise Building) - Fire & Emergency: documents, fee under G.O. of 13-09-2019, 60 working days (opens in a new tab)
- Kerala Fire and Rescue Services: Fee structure, G.O.(Ms)No.272/2024/Home (opens in a new tab)
- Fire and Emergency Services, Meghalaya: Annexure B (with continuation sheets B1 and B2) to notification HPL.179/2017/85: fees per m² and annual renewal fees for every building category (opens in a new tab)
- Fire and Emergency Services, Meghalaya: Annexure B1 to notification HPL.179/2017/85: institutional, assembly and business buildings (opens in a new tab)
- Fire and Emergency Services, Meghalaya: Annexure B2 to notification HPL.179/2017/85: mercantile, industrial, storage and hazardous buildings (opens in a new tab)
- Mizoram Fire and Emergency Services: Home Department notification G/262/2026-HM (F&ES), 6 May 2026: rate of NOC fees (opens in a new tab)
- Odisha Fire and Emergency Service: Service details: Fire Safety Recommendation under rule 12 (fee Rs 1 or Rs 2 per m² through IFMS; 7 documents) (opens in a new tab)
- Directorate of Local Government, Punjab (Wayback Machine copy of 21 March 2022 of the portal's fee download): Letter No. S4-DSMS-(Fire)-2021/41343 of 8 October 2021: new fees for online fire NOCs, by NBC zone, with provisional, renewal and 30-day rules (opens in a new tab)
- Urban Development, Housing and Local Self Government Departments, Rajasthan: Joint order No. P.11(9)UDH/2020 Part, 14 September 2023, on the fire safety certificate and fire NOC (18-page Hindi scan) (opens in a new tab)
- Government of Telangana, Home (Ser.IV) Department: G.O.Ms.No.142, Home (Ser.IV), 9 August 2016: fire precaution fee amending the Levy of Fee Rules, 2006 (opens in a new tab)
- e-District Tripura: Guidelines for fire safety certificate and NOC services (Aadhaar e-sign, e-GRAS payment) (opens in a new tab)
- West Bengal Fire and Emergency Services: Issuance of Fire Safety Recommendation: document requirement with drawing scales (opens in a new tab)
- Department of Fire and Emergency Services, DNH and DD (single window): SOP for the provisional fire NOC, 4 August 2025: Rs 10 per m² of total built-up area under the notification of 9 May 2016 (opens in a new tab)
- Guidance Tamil Nadu, Tamil Nadu Single Window Portal: No Objection Certificate for Multi Storied Buildings (18.3 m and above) from TNFRS: procedure, documents, timelines and fees (opens in a new tab)
- Uttar Pradesh Fire and Emergency Services: Dashboard: provisional, final and renewal applications, approvals and days to certificate (printed 24 October 2026) (opens in a new tab)
- Fire Service Headquarters, Jharkhand, Ranchi (posted on the Single Window as its fee document): Letter No. 671 of 18 December 2020: no fee for Fire Advisory, NOC or renewal issued online through the Single Window (opens in a new tab)
- EoDB Arunachal Pradesh single window (Department of Finance, Planning and Investment): Services: Fire and Emergency Services: Application for Fire Safety Certificate, NOC prior to construction, and Renewal of Fire Safety Certificate, with each service's requirements (documents, no fee, 15 days) (opens in a new tab)
- Fire Service Department, Puducherry: Services: issue of fire NOC or licence, free (categories and validity are in G.O.Ms.No.61, source py-go61-scan) (opens in a new tab)
- Emerging Himachal single window: Fire NOC checklist and procedure (Form A) (opens in a new tab)
- Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026: Lakshadweep Fire and Emergency Services Rules, 2026 (Rule 12: 5-year fire safety certificate) (opens in a new tab)
- Delhi Gazette Extraordinary, Part IV No. 314 (SG-DL-E-17102026-277257): Home Department notification F. No. 6/DFS/MS/HQ/MISC/2026/01/631, 16 October 2026: commencement of amended Rules 34 to 38 extended to 20 May 2027 (opens in a new tab)
- Invest Uttarakhand single window: Fees for application of Pre-establishment Fire NOC: no fees required (opens in a new tab)
- Urban Development, Housing and Local Self Government Department, Rajasthan: Notification No. P.11(9)UDH/2020 Part/9003-9336, 31 July 2024: fire cess for buildings up to 15 m cut from Rs 50 to Rs 15 per m2 for 5 years (opens in a new tab)