ServicesFlamekite service 7 min read
Fire NOC consultants: we get your fire NOC filed, inspected and renewed
Updated By Flamekite Editorial DeskFacts checked against official sources on
Quick answer
Flamekite handles your fire NOC from the first question to the certificate: which approvals your building needs under your state's law, the fire drawings and document file in your state's format, filing on the official portal, the inspection and every follow-up. Licensed partners do the site work under Flamekite's supervision.
The first check is free and on WhatsApp. You get what your building needs, the fee your state publishes, the documents and a realistic timeline, in writing, before you spend anything.
Flamekite's fire NOC service at a glance
| What | The rule | Source |
|---|---|---|
| What we handle | New provisional and final NOCs, renewals, maintenance certificates, drawings and documents, and replies to fire department notices | Not stated |
| Who does the site work | Licensed fire agencies, empanelled auditors and fire consultants working under Flamekite's supervision | Not stated |
| Who answers to you | Flamekite, from the first message to the certificate | Not stated |
| Where | All 36 states and UTs for the check; filing through partners in your state | Not stated |
| First check | Free, on WhatsApp, with no obligation | Not stated |
| Fees | The state's statutory fee is paid to the state; our fee is agreed in writing before work starts | Not stated |
| Rules we work from | Your state's fire act, rules and circulars, read in the original and dated | Not stated |
How Flamekite handles your fire NOC in 5 stages
Tell us about the building
State, use, height, floor area and where you are: planning, built, renewal due, or a notice from the fire department.
We check the rules that apply
Which approvals, from which authority, at what fee, and which documents: from your state's own act, rules and circulars.
Drawings and documents
Fire layout drawings in your state's format and the document file each stage asks for, checked before upload.
Filing and inspection
Filed on the official portal; the inspection prepared for, with the systems tested before the officer arrives.
Certificate and reminders
The certificate in your hands, and a reminder before the next renewal or maintenance filing.
What Flamekite handles for your building, 6 services
One owner for the whole job, with licensed partners on site. Pick one or all six.
New
Fire NOC, end to end
Provisional and final NOC filed for you, from the drawings to the certificate.
Renewal
Renewals and maintenance certificates
Renewals on time, plus Form B, Form A-8 and the other yearly filings your state asks for.
Audit
Third-party fire audit
An audit by a licensed or empanelled auditor where your state requires one.
Systems
Installation and AMC
Comparable quotes from licensed installers for hydrants, sprinklers, alarms and extinguishers, and yearly maintenance.
Drawings
Fire drawings and documents
Fire layout drawings and the document set in your state's format, checked before upload.
People
Fire safety officer and training
Officers where the law requires one, plus staff training and mock drills.
What a fire NOC takes in practice: official numbers
Promised timelines and real ones differ. These are the states' own published figures.
60.97 days
Bhopal's average per fire NOC application against a 30 working day promise (median 41) Urban Administration and Development Department, Madhya Pradesh
5 days
Median time to a provisional NOC on Uttar Pradesh's dashboard; the legal limit is 15 UP Fire dashboard
14 days
Telangana's official timeline for a building above 15 m; 7 days up to 15 m TGFD Fire NOC note
20 days
Kerala's site NOC time frame above 16 m; 15 days up to 16 m Kerala Fire and Rescue Services
The file we prepare for your building
Official lists run from 3 items to 19. These are the papers that recur, and what each answers.
- The application on the state form or letterhead, with the owner's or architect's authorisation (MFS lists 14 rows for a provisional NOC and 6 for a final one) MFS e-fire
- Fire drawings with every system marked, in the state's format: Kerala accepts only its A1 template since 14 July 2025 Kerala Fire and Rescue Services
- Proof of ownership or tenancy, and the applicant's identity
- The sanctioned building plan with height, floor areas and occupancy, which decide every threshold
- The licensed agency's installation certificate before a final NOC: Maharashtra's current list prints 861 licensed-agency rows MFS agency list
- For a final NOC near Pune, PMRDA's list runs to 19 items, including pump, pressure and fire door certificates PMRDA
5 reasons fire NOC files stall, and what we do about each
Most delays come from the file, not the fire service. These are the ones we check for first.
If Drawings in the wrong format or size
We draw to your state's template and file limits before upload, such as Kerala's A1 sheet. Kerala Fire and Rescue Services
If An agency whose licence has lapsed
Maharashtra accepts a Form A or B only within 3 months of an agency's licence expiring; we check the current list first. MFS Form B guidelines
If Building to the wrong edition of the code
We confirm in writing which code your state applies; NBC 2016 was withdrawn on 30 April 2026 and only Assam had written NBCS 2026 into its fire law by 24 October 2026. Gazette of India
If Renewal filed too late
We file inside your state's lead time: 6 months in Delhi, 45 days in Bihar, 1 month in Uttar Pradesh. DFS
If Gaps found at inspection
We walk the building against the fire drawings before the officer does, with every system tested. TGFD Fire NOC note
What you pay: the state's fee and ours
Two separate costs. The statutory fee goes to the state; ours is agreed in writing before any work.
As published
- Statutory fee, Andhra Pradesh and TelanganaRs 10 per m²Of total built-up area G.O.Ms.No.142
- Bank guarantee, Andhra Pradesh and Bihar15% of the fire-system costHeld for 5 years AP State Disaster Response and Fire Services
- Statutory fee, Uttar PradeshNilThe state dashboard lists no fee UP Fire dashboard
- Flamekite's first checkFreeWhat you need, before you commit
- Flamekite's service feeQuoted in writingBy building, stage and state, before work starts
Every state's statutory fee is on the fire NOC fees page.
Renewals and the filings between them
A certificate can lapse without anyone noticing. Some filings fall due while it is still valid.
Do
- Renew inside your state's lead time: 6 months in Delhi and Manipur, 2 weeks in Tripura. DFS
- File Maharashtra's Form B every January and July through one licensed agency per system group. MFS Form B guidelines
- Upload Telangana's third-party fire audit certificate every January, or every January and July for the tallest and riskiest buildings, through its Fire Audit module. TG fire circular 2020
Don’t
- Don't wait for the expiry date: in Bihar the renewal goes in 45 days before. Bihar Rules 2021
- Don't assume Delhi's new yearly Form K has started: it is deferred to 20 May 2027. Delhi Gazette
What you receive from Flamekite, in writing
4 things on every job, whatever the state.
- A written plan
- The approvals your building needs, from whom, at what fee and by when.
- Document checks
- Every drawing and certificate checked against the state's published rules before filing.
- An honest timeline
- The fire service's own published time limits, with the parts it controls marked as such.
- Reminders
- A WhatsApp reminder at your state's lead time, so a certificate never lapses unnoticed.
Questions about Fire NOC consultants
What does a fire NOC consultant do?
- A consultant works out which fire approvals your building needs under your state's law, prepares the fire drawings and documents, files them on the official portal, prepares the building for inspection and follows up until the certificate is issued. Flamekite also tracks your renewals.
Can a consultant guarantee my fire NOC?
- No. The state fire service decides every application. A good consultant makes sure the file is complete and correct for your state's rules, which removes the most common causes of delay.
How much does a fire NOC consultant charge?
- Flamekite quotes its fee in writing by building, stage and state before any work starts. The statutory fee is separate and goes to the state: Rs 10 per m² in Andhra Pradesh and Telangana, nothing on Uttar Pradesh's portal.
Do you work in my state?
- The free check covers all 36 states and UTs, because Flamekite reads every state's fire law. Filing and site work are arranged through licensed partners in your state.
How do I start?
- Use the free fire NOC check: tell us your state, building and stage on WhatsApp, and we reply with what you need, the fee, the documents and the timeline.
Keep reading
- Do I need a fire NOC?Your state, use, height and floor area: the rule your building crosses.
- Fire NOC feesWhat each state charges, with the notification behind it.
- Fire NOC documentsStage-wise lists and official checklists with form numbers.
- Fire NOC renewal date calculatorYour state's last date to file, and a WhatsApp reminder.
Keep exploring
The codes and laws behind it
Sources
Each source was opened and read on the date shown. How Flamekite checks its sources
- Urban Administration and Development Department, Madhya Pradesh (e-Nagarpalika): Online Single Window System Dashboard for Fire NOC (queried 1 April 2020 to 24 October 2026 for Bhopal, Indore, Jabalpur and Gwalior) (opens in a new tab)
- Uttar Pradesh Fire and Emergency Services: Dashboard: provisional, final and renewal applications, approvals and days to certificate (printed 24 October 2026) (opens in a new tab)
- Maharashtra Fire and Emergency Services: E-Approval online application: documents for Provisional and Final NOC, and the 7-working-day service line (opens in a new tab)
- Telangana Fire, Disaster Response, Emergency and Civil Defence Department: Fire NOC: timelines and inspection checklist (FireNOC.pdf) (opens in a new tab)
- Kerala Fire and Rescue Services: Time frame for site NOC, final NOC and renewal (opens in a new tab)
- Kerala Fire and Rescue Services: Fire NOC portal: online NOC, renewal, NOC verification, A1 template for fire plans from 14 July 2025 (opens in a new tab)
Show all 16 sourcesShow fewer
- Directorate of Maharashtra Fire Services: List of Approved Licensed Agencies Valid Up to 03.07.2028 (847 numbered entries in the copy read) (opens in a new tab)
- Pune Metropolitan Region Development Authority, Fire Department: Final fire NOC file checklist (19 items, Marathi), with the architect's completion certificate (opens in a new tab)
- Maharashtra Fire and Emergency Services: Guidelines for Form B, Annexure A: to be followed by licensed agencies issuing Form B under section 3(3) and rule 4(2) (circular of 7 July 2026) (opens in a new tab)
- Gazette of India (Bureau of Indian Standards notification): Gazette of India Extraordinary, Part III Sec 4, No. 299, 30 April 2026: SP 7:2026 established, SP 7:2016 withdrawn (Ref HQ-PUB013/1/2020-PUB-BIS (1529)) (opens in a new tab)
- Delhi Fire Service: Renewal of Fire Safety Certificate (FSC/NOC) (last updated 23/10/2026) (opens in a new tab)
- Government of Telangana, Home (Ser.IV) Department: G.O.Ms.No.142, Home (Ser.IV), 9 August 2016: fire precaution fee amending the Levy of Fee Rules, 2006 (opens in a new tab)
- AP State Disaster Response and Fire Services: AP Fire and Emergency Operations and Levy of Fee Rules, 2006 (G.O.Ms.306, 8 December 2006) (opens in a new tab)
- Director General, Telangana State Disaster Response and Fire Services: Circular Memorandum Rc.No.6402/MSB/2019, 28 January 2020: conducting of fire audit in all high-rise and non-high-rise buildings; third-party certificate uploaded every January, or every January and July, by height and use, with the 13-point certificate format (read from the page images) (opens in a new tab)
- Government of Bihar, Home Department (English copy hosted by Bihar Fire Service): Bihar Fire Service Rules, 2021: rule 15 (NOC thresholds, forms, validity, renewal), rules 20 to 26 and Schedule C (opens in a new tab)
- Delhi Gazette Extraordinary, Part IV (Home Department, Govt of NCT of Delhi): Notification F. No. 6/DFS/MS/HQ/MISC/2026/01/631, 16 October 2026 (No. 314, SG-DL-E-17102026-277257): commencement of Rules 34 to 38 and the First and Seventh Schedules extended to 20/05/2027 (opens in a new tab)