Fire NOC 38 min read
Fire NOC in India: who issues it, which buildings need it, and the rules in all 36 states and UTs
Updated By Flamekite Editorial DeskFacts checked against official sources on
Quick answer
A fire NOC is the fire service's written clearance that a building's fire safety design and installed systems meet the law. India has no national fire NOC: each of the 28 states and 8 union territories issues its own, under its own fire act, rules or building bye-laws.
Most regimes follow the 2019 Model Bill: a certificate for buildings above 15 m, for special occupancies such as schools, hospitals and assembly halls, and for mixed buildings above 500 m². Validity runs from 1 to 5 years by state, and the occupancy certificate usually waits for the fire certificate.
Fire NOC at a glance
| What | The rule | Source |
|---|---|---|
| What it is | The fire service's no objection certificate: a plan-stage approval before construction, then a final certificate after the fire systems are installed and inspected | Fire and Emergency Services, Assam |
| Legal basis | Fire services are a State subject and a municipal function: Twelfth Schedule, item 7, read with Article 243W | Legislative Department, Ministry of Law and Justice |
| Who issues it | Your state or UT fire service, or a municipal Chief Fire Officer where the state law gives the city that power | Maharashtra Fire and Emergency Services |
| National template | Revised Model Fire and Emergency Service Bill, 2019 (MHA): certificate within 1 month of a complete application | DGFS, MHA |
| Usual trigger | Above 15 m, any special occupancy, or mixed use above 500 m² (Model Bill, section 24(3)) | DGFS, MHA |
| Validity | 1 to 5 years, set by each state and often by risk category | Fire and Emergency Services and SDRF, Chhattisgarh |
| Occupancy link | No occupancy certificate until the fire measures comply (Model Bill, section 24) | DGFS, MHA |
| National building standard | NBC 2016 withdrawn on 30 April 2026 and replaced by NBCS 2026 (SP 7:2026); only Assam had written it into its fire law by 24 October 2026 (and UP's OSH Rules apply Part F to workplaces) | Gazette of India |
| Fire deaths behind the rules | 7,566 fire incidents and 7,435 deaths in 2022 (NCRB, as told to the Lok Sabha) | Lok Sabha |
| Last verified | 24 October 2026, against state gazettes, acts and fire service portals | Not stated |
Provisional vs final fire NOC: the two stages compared
| Option | Provisional or plan-stage NOC | Final NOC or fire safety certificate | Source |
|---|---|---|---|
| When it is issued | Before construction, on the drawings | After the recommended measures are installed and inspected | Fire and Emergency Services, Assam |
| West Bengal | Fire Safety Recommendation | Fire Safety Certificate | West Bengal Fire and Emergency Services |
| Tripura (Rules 2026) | Fire Safety Recommendation: Form G, issued as Form H | Fire Safety Certificate: Form I with Form J, issued as Form K, applied for within 1 month of completion | Directorate of Fire and Emergency Services, Tripura |
| Bihar (Rules 2021) | Applied for on Form B with a 15% bank guarantee valid 5 years; issued on Form E | Final NOC in Form J, after a completion notice in Form I | Bihar Rules 2021 |
| Andhra Pradesh (2026 amendment) | Provisional Fire NOC within 21 days | Fire Safety Certificate within 30 days of completion and inspection | Andhra Pradesh Legislative Assembly |
| Kerala time frame | Site NOC in 15 days up to 16 m, 20 days above | Final NOC in 15 to 20 days | Kerala Fire and Rescue Services |
| Tamil Nadu | Planning-permission NOC, with Appendices 1 and 2 | Completion certificate or fire licence | Tamil Nadu Fire and Rescue Services |
| Goa | Initial NOC, Goa Online service FES91 | Final NOC, Goa Online service FES92 | Directorate of Fire and Emergency Services, Goa |
| Meghalaya | Provisional FSC, Invest Meghalaya service 1171 | Grant of FSC, Invest Meghalaya service 14 | Fire and Emergency Services, Meghalaya |
| J&K Single Window, average time | 11 days | 10 days (final or renewal) | J&K Single Window Clearance System |
How to apply for a fire NOC online, step by step
Check that your building needs one
Compare its height, the area of its largest floor and its use with your state's list. The common pattern is above 15 m, any special occupancy, or mixed use above 500 m²; the state table on this page names each state's own law.
Find your state's official portal
Use the fire service portal or state single window listed below, not a private site that copies the form. Goa, for example, has taken fire NOC applications only online, on Goa Online, since 15 November 2019.
Have the fire drawings prepared
An architect or engineer draws the fire layout: access, exits, staircases, detection, hydrants and sprinklers. Bihar wants the provisional application through an enrolled architect or engineer, and Kerala has accepted fire plans only on its A1 template since 14 July 2025.
Apply for the provisional NOC and pay the fee
Upload the plans and pay online. Andhra Pradesh charges Rs 10 per m² of built-up area plus a 15% bank guarantee on the fire installation, and its 2026 amendment gives the department 21 days to decide.
Install the systems through a qualified agency
The 2019 Model Bill lets only qualified agencies install fire and life safety systems. Uttar Pradesh licenses such agencies under its 2024 Rules; Maharashtra licenses them in Form M.
Apply for the final certificate and inspection
File the completion notice and request the inspection. Tripura asks for this within 1 month of finishing construction, and the Model Bill gives the fire officer 1 month to issue the certificate.
Use the certificate for your occupancy certificate
Download the digitally signed certificate and file it with the occupancy application: most fire laws bar the occupancy certificate until it exists.
Diary the renewal and maintenance dates
Note the expiry date and any periodic filings. The Model Bill asks for maintenance certificates twice a year, in January and July, and Bihar wants renewal in Form M 45 days before expiry.
What is a fire NOC, who issues it, and is it mandatory?
A fire NOC is mandatory for every building your state's fire law or bye-laws list, and the occupancy certificate usually waits for it. A state or city authority issues it, never a central ministry.
A fire NOC (no objection certificate) is the fire service's written statement that a building's fire prevention and life safety arrangements meet the law. The Ministry of Home Affairs' 2019 Model Bill calls the final approval a Fire Safety Certificate, and states that followed it, such as Andhra Pradesh in 2026, now use that name. West Bengal, Odisha and Tripura call the plan stage a Fire Safety Recommendation; Tamil Nadu calls the final stage a completion certificate or fire licence.
Fire services sit in the Twelfth Schedule of the Constitution (item 7, read with Article 243W), and the Ministry of Home Affairs told the Lok Sabha on 30 July 2024 that fire is a State subject. The Centre advises and funds: its Rs 5,000 crore scheme to expand state fire services, launched on 4 July 2023, keeps Rs 500 crore to reward states for legal and infrastructure reforms.
Three kinds of authority issue the certificate. In most of India it is the state fire service. In Maharashtra the Chief Fire Officer of the municipal or planning authority approves inside its area and the Director outside it, and Gujarat's certificates come from a Regional Fire Officer or a municipal Chief Fire Officer. Rajasthan, which has no separate fire act, issues it through its Local Self Government Department, and Madhya Pradesh's 2026 Act gives operational control to the urban local body.
The certificate is enforced through the permissions that depend on it. The Model Bill bars the occupancy certificate until the fire measures comply, Haryana's 2022 Act says no occupation certificate may issue without it, and Uttar Pradesh refers buildings with a cancelled certificate to the licensing authorities for their trade licences.
| What | The rule | Source |
|---|---|---|
| Model Bill 2019, section 24 | No occupancy certificate until fire prevention and life safety measures comply | DGFS, MHA |
| Haryana Act 2022, section 19(5) | No occupation certificate without the fire safety certificate | Government of Haryana |
| Rajasthan UDH order signed 29 May 2026 (listed 2 June) | Permanent fire NOC before the occupancy certificate; coaching centres must hold a fire NOC | Urban Development and Housing Department, Rajasthan |
| Assam Fire Service Rules 1989, Rule 18 (made under the 1985 Act, repealed in 2025) | Fire NOC before the trade licence | Government of Assam |
| Uttar Pradesh Rules 2024, Rule 46 | Cancelled certificate referred to licensing authorities to cancel trade licences | LegitQueststudy |
| Bihar Rules 2021 | Fire NOC attached when a cinema licence is renewed | Bihar Rules 2021 |
Fire NOC in all 36 states and UTs: law, issuer, portal, validity
Each row names the instrument that governs a fire NOC there today, as verified on 24 October 2026. Where no official source could be found, the cell says not verified instead of guessing.
| Fire law in force | Issued by | Where to apply | Validity | |
|---|---|---|---|---|
| Andhra Pradesh G.O.Ms.No.218 | AP Fire Service Act 1999, amended in 2026 with effect from 1 December 2025, the date of the ordinance it replaced | AP State Disaster Response and Fire Services | NOC portal via fireservices.ap.gov.in; APDPMS for building plans | First occupancy NOC 1 year; renewals 1 to 5 years by occupancy (G.O.Ms.No.218 of 2023 and No.178 of 2025) |
| Arunachal Pradesh Government of Arunachal Pradesh | Arunachal Pradesh Fire and Emergency Services Act 2026 (Act 12 of 2026) | Department of Fire and Emergency Services, Itanagar | State single window eodb.arunachal.gov.in (reported May 2026) | Not set by the Act; no rules found |
| Assam Assam Act LIII of 2025 | Assam Fire and Emergency Services Act 2025 (Act LIII, 24 December 2025; replaced the 1985 Act), amended 14 August 2026 | Fire and Emergency Services, Assam (Director, Guwahati) | EoDB Assam single window | Valid until cancelled under the 2025 Act; older certificates carry 1 or 2-year terms |
| Bihar Bihar Rules 2021 | Bihar Fire Service Act 2014; Rules 2021 | Bihar Fire Service | firenoc.bihar.gov.in | 5 years residential, 3 non-residential, 2 hazardous |
| Chhattisgarh Fire and Emergency Services and SDRF, Chhattisgarh | Chhattisgarh Fire and Emergency Services Act 2018; Rules 2021, amended 2025 | Fire and Emergency Services and SDRF, Chhattisgarh | firenoc.cg.gov.in | 3, 2 or 1 years by risk (order of 16 October 2025) |
| Goa Government of Goa, Official Gazette Series II No. 14, 3 July 2025 | Goa, Daman and Diu Fire Force Act 1986; Rules 1997 | Directorate of Fire and Emergency Services, Goa | Goa Online (services FES91, FES92, FES93) | 5 years, with an annual self-declaration |
| Gujarat Gujarat Fire Safety Compliance Portal | Gujarat Fire Prevention and Life Safety Measures Act 2013; Regulations 2023 | Regional Fire Officer or municipal Chief Fire Officer | GujFireSafety CoP (gujfiresafetycop.in) | 3 years for a new certificate, then 2-year renewals |
| Haryana Government of Haryana | Haryana Fire and Emergency Services Act 2022 | Haryana Fire and Emergency Services (Director) | Not verified; scheme approvals have run on online.ulbharyana.gov.in | 3 years; 5 years first term for residential above 16.5 m |
| Himachal Pradesh HP Fire NOC copy | HP Fire Fighting Services Act 1984, amended 2000 | Director of Fire Services or Chief Fire Officer | Emerging Himachal single window (Form A) | Not set in the Act; a 2024 Shimla NOC ran 2 years |
| Jharkhand Jharkhand Single Window | Jharkhand Fire Service Act 2024 (Act 9 of 2024; start date not found) | Jharkhand Fire Service | Jharkhand Single Window (existing buildings); BPAMS for new building plans | 1 year, renewed on the Single Window; no fee |
| Karnataka Government of Karnataka | Karnataka Fire Force Act 1964, amended 2023 and 2025 | Karnataka State Fire and Emergency Services | Seva Sindhu (sevasindhu.karnataka.gov.in) lists the NOC; the KSFES site was unreachable | Not published |
| Kerala Home Department, Kerala | Kerala Fire Force Act 1962; Kerala Municipality Building Rules 2019 | Kerala Fire and Rescue Services | noc.fire.kerala.gov.in; renewals on nocrnwl.fire.kerala.gov.in | 5 years non-hazardous, 2 years hazardous |
| Madhya Pradesh MP e-Nagar Palika manual | MP Agnishaman Evam Apatkalin Sevayen Adhiniyam 2026 (commencement notification not found) | Urban local body | e-Nagarpalika (enagarpalika.mp.gov.in) | 3-year certificate; 1-year Fire Plan Approval (e-Nagar Palika manual) |
| Maharashtra Maharashtra Fire and Emergency Services | Maharashtra Fire Prevention and Life Safety Measures Act 2006 | Director, Maharashtra Fire Services, or the municipal Chief Fire Officer | MFS e-approval portal or the city corporation | Form B maintenance certificate every January and July |
| Manipur Government of Manipur | Manipur Fire and Emergency Service Act 2026 (in force 14 September 2026) | Manipur Fire Service, Home Department | EoDB Manipur (Fire Safety Certificate and Auto Renewal services, 7 days) | 5 years residential, 3 years non-residential and hotels |
| Meghalaya Gazette 14 Aug 2025 | Meghalaya Fire and Emergency Services Act 2012 | Fire and Emergency Services, Meghalaya Police (SP, F&ES) | Invest Meghalaya single window | 3 years from issue (notification of 24 July 2025) |
| Mizoram Mizoram Home Dept | Mizoram Fire Service Act 2013; Rules 2019 | Mizoram Fire and Emergency Services, Aizawl | fsonline.mizoram.gov.in (online NOC) or the Directorate | Final NOC valid indefinitely, with renewal certification to be notified (amendment rules signed 20 August 2026; was 3 or 4 years) |
| Nagaland Directorate of Fire and Emergency Services, Nagaland | Nagaland Fire and Emergency Services Act (Act 5 of 2023) | Directorate of Fire and Emergency Services, Kohima | Offline, at the local fire station | 2 years, any occupancy |
| Odisha Order 50908 of 2019 | Odisha Fire Service Act 1993; Fire Prevention and Fire Safety Rules 2017, amended 2025 | Odisha Fire and Emergency Service | odishafire.odisha.gov.in | 2 years; 5 years for residential buildings of 15 m and above |
| Punjab Punjab Gazette | Punjab Fire and Emergency Service Act 2024; Validity of FSC Rules 2025 | Directorate of Punjab Fire and Emergency Services, Local Government Department | firenoc.lgpunjab.gov.in | Ordinarily at least 3 years (s.23(4)); 5, 3 or 1 by risk reported, gazette not seen |
| Rajasthan Rajasthan UDH | No separate fire act; Rajasthan Municipalities Act 2009 and the LSG fire order of 14 September 2023 | Local Self Government Department, through urban bodies | lsgonline.rajasthan.gov.in | Generally 1 year; some hospitals 3 or 5 years (2023 order) |
| Sikkim Sikkim F&ES Rules 2025 | Sikkim Fire and Emergency Services Act 2023 (commencement not found); Rules 2025 | Sikkim Fire and Emergency Services, Gangtok | Online Form A9 under rule 29; the named portal did not respond on 24 October 2026 | 5, 3 or 1 years by use (rule 30) |
| Tamil Nadu Tamil Nadu Fire and Rescue Services | TN Fire Service Act 1985 in force; TN Fire and Rescue Services Act 2025 awaits commencement | TN Fire and Rescue Services: Director above 18.3 m, District Officer up to 18.3 m | TN Single Window Portal (tnswp.com) | Not set in the 1985 Act; a 2022 TNFRS licence states 1 year |
| Telangana Telangana Fire, Disaster Response, Emergency and Civil Defence Department | Fire Service Act, 1999, as applied in Telangana | Telangana Fire, Disaster Response, Emergency and Civil Defence Department | fire.telangana.gov.in | Conflicting: 5 years (2016 circular) or every year (department FAQ) |
| Tripura High Court of Tripura/TFES/2025) | Tripura Fire and Emergency Services Act 2022, amended 2025; Fire Safety Rules 2026 | Directorate of Fire and Emergency Services, Agartala | e-District Tripura (edistrict.tripura.gov.in) | 3 years first, then renewed every year |
| Uttar Pradesh LegitQueststudy | UP Fire and Emergency Services Act 2022; Rules 2024 | UP Fire and Emergency Services | upfireservice.gov.in or Nivesh Mitra | 5 years residential, 3 non-residential, 1 for hotels, hospitals, assembly and hazardous |
| Uttarakhand Uttarakhand Home notification | Uttarakhand Fire and Emergency Service, Fire Prevention and Fire Safety Act 2016, amended 2022 | Uttarakhand Fire and Emergency Service | Invest Uttarakhand single window | 5 years residential except hotels; 3 years others (notification 342 of 2021) |
| West Bengal West Bengal Legislative Assembly | West Bengal Fire Services Act 1950, amended 2018 and 2022; Rules 2003 | West Bengal Fire and Emergency Services | wbfes.gov.in e-services; Silpasathi | 3 years; 5 years for government primary schools |
| Andaman and Nicobar Islands (UT) A&N CFO certificate | A&N Islands Fire and Emergency Service Regulation 2026 (commencement not found) | Andaman and Nicobar Fire Service (Chief Fire Officer, Aberdeen Bazar) | Fire Service portal andssw1.and.nic.in:8081/ospfire | Fire Clearance Certificate 1 year today; 5 years once the Regulation starts |
| Chandigarh (UT) Gazette of India | Haryana Fire and Emergency Services Act 2022 as extended by S.O. 2264(E) from 6 May 2026 (replacing the Delhi Act of 1986 as extended) | Fire and Emergency Services wing, Municipal Corporation Chandigarh | serviceonline.gov.in (ServicePlus service 8830004) | 5 years under S.O. 2264(E); earlier certificates 3 years |
| Dadra and Nagar Haveli and Daman and Diu (UT) Gazette of India Extraordinary | DNH and DD Fire and Emergency Service Regulation 2026 (in force 7 July 2026) | Department of Fire and Emergency Services, Daman | swp.dddgov.in single window | 5 years, with a self-declaration after 30 months |
| Delhi (NCT) Delhi Gazette Extraordinary, Part IV No. 314 | Delhi Fire Service Act 2007; Rules 2010 | Delhi Fire Service | DFS portal; plans through MCD, DDA or NDMC | 5 years residential, 3 non-residential, until about 20 May 2027 |
| Jammu and Kashmir (UT) J&K Gazette | J&K Fire Force Act 1967 as adapted in 2020; the NOC duty sits in the Unified Building Bye-Laws 2021, clause 2.18(2) | Fire and Emergency Services Department, J&K | J&K Single Window (singlewindow.jk.gov.in); building NOCs on the online Common Application Form | Not published |
| Ladakh (UT) Ladakh H&UDD | J&K Fire Force Act 1967 as adapted; Ladakh Fire Prevention and Fire Safety Rules 2025 | Ladakh Fire and Rescue Service (under the DGP since July 2026) | Building plans on OBPS (obps.ladakh.gov.in); a fire service website with NOC services was launched on 6 October 2026, address not published | Draft 2025 bye-laws: 10 years self-certified or 5 years with a fire NOC; final text not confirmed |
| Lakshadweep (UT) Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026 | Lakshadweep Fire and Emergency Service Regulation 2026 (in force 27 May 2026); Rules 2026 | Lakshadweep Fire Force, Home Department | Rules refer to an online portal; none found | 5 years, with a July maintenance certificate |
| Puducherry (UT) Puducherry G.O. 61 | No fire act; a 1966 office memorandum and G.O.Ms.No.61 of 2025 | Fire Service Department, Puducherry | Puducherry EoDB portal (eodb.py.gov.in) | 3 years; schools, hospitals and large hotels every year |
Maharashtra, Delhi and Telangana have their own Flamekite pages with the full detail. Validity here is the term of one certificate; renewal deadlines and maintenance filings are covered further down.
Does your building need a fire NOC? Height and area triggers
Start from 15 m, the Model Bill default, then check the exceptions: states set triggers from 9 m to 24 m, and some uses need a NOC at any height.
If Your building is above 15 m
You need one in almost every state: 15 m is the line in the Model Bill and in the laws of Uttar Pradesh, Bihar, Manipur, Nagaland, Sikkim, A&N and DNH and DD. DGFS, MHA
If It is a school, college or hospital of 9 m or more
Delhi, Haryana and Bihar bring educational and institutional buildings in at 9 m, Manipur above 9 m and Nagaland above 9 m or ground plus two, and Bihar covers every assembly building at any height. Bihar Rules 2021
If It is a hotel of 12 m or more
Delhi and Odisha use 12 m for hotels, and Manipur and Nagaland more than 12 m; Chhattisgarh also covers any hotel of 500 m² or of 3-star rating and above. Fire NOC Delhi Home Department, Chhattisgarh
If Any floor exceeds 500 m², or there are 2 or more basements
Andhra Pradesh's 2026 amendment, Bihar and Haryana cover business, mercantile and mixed buildings above 500 m² on any floor, and any building with 2 basements or one basement above 500 m². Andhra Pradesh Legislative Assembly
If It is a residential apartment in Telangana below 24 m
No fire NOC is needed for fresh provisional applications from 7 October 2026; the 24 m line covers residential apartments only. Fire NOC Telangana Telangana Fire, Disaster Response, Emergency and Civil Defence Department
If It is a residential building in Uttarakhand of 12 m or more
Uttarakhand's 2022 amendment sets 12 m, the lowest general residential trigger Flamekite found in any state. Uttarakhand Legislative Assembly
If It is a high-rise in Karnataka
The 2023 amendment ties the high-rise NOC to 21 m, whatever the occupancy. Government of Karnataka
If It is a small building in Tripura
Residential buildings up to 10 m and 500 m², and most other uses up to 10 m and 200 m², use self-certification instead of the full NOC route. Directorate of Fire and Emergency Services, Tripura
How long a fire NOC really takes: Madhya Pradesh's live dashboard
Madhya Pradesh promises a fire NOC in 30 working days in its four largest cities. Its own public dashboard, read on 24 October 2026, shows Bhopal and Indore taking about twice that on average since April 2020; the medians sit closer to the promise, so a tail of slow files drags the average up.
60.97 days
Bhopal: average per application (median 41, longest 304) Urban Administration and Development Department, Madhya Pradesh
59.84 days
Indore: average per application (median 37, longest 453) Urban Administration and Development Department, Madhya Pradesh
48.64 days
Gwalior: average per application (median 29, longest 335) Urban Administration and Development Department, Madhya Pradesh
27.78 days
Jabalpur: average per application (median 15, longest 191) Urban Administration and Development Department, Madhya Pradesh
1,772
Applications in the 4 cities from 1 April 2020 to 24 October 2026 Urban Administration and Development Department, Madhya Pradesh
30 working days
The timeline the dashboard promises for each city Urban Administration and Development Department, Madhya Pradesh
What the Supreme Court ordered for hospitals without a fire NOC
After the Rajkot COVID hospital fire of 26 November 2020, the Court ordered monthly fire audits and an immediate NOC application from every COVID hospital that lacked one.
Word for word
Covid hospitals who have not obtained NOCs from the fire department were required to apply it immediately. These orders were to be followed for the immediate renewal of the NOCs. In the event that any Covid hospital was found not possessing an NOC including a renewal, appropriate action was directed to be taken by the State.
The same directions asked every state for one nodal officer per COVID hospital and a district committee to fire-audit each hospital at least once a month. The MoHFW and NDMA advisory of 23 March 2024 later asked hospitals, through the states, to keep a valid fire NOC renewed annually as per State Fire Safety Rules.
Fire NOC for a hospital, restaurant, hotel, school and coaching centre
The same building gets a different answer in different states. These worked examples apply each state's published rule.
Case 1
A 20 m private hospital with an ICU in Chhattisgarh
Institutional, above 15 m, with a critical-care unit
What applies Needs a NOC on two counts: institutional above 9 m, and any critical-care unit. Hospitals above 15 m are high risk under the October 2025 order, so the NOC lasts 1 year, with an annual self-declaration and third-party audit report. Fire and Emergency Services and SDRF, Chhattisgarh
Case 2
A nursing home in Uttar Pradesh
Institutional building below 15 m
What applies Institutional buildings are special buildings under the UP Act, so height does not exempt it. Rule 44 makes a hospital's certificate valid for 1 year, against 5 years for homes. LegitQueststudy
Case 3
A 40-seat restaurant in Goa
Eating house with up to 50 seats
What applies Pays the small-eatery fee of Rs 150 per NOC per year. A restaurant for more than 50 people pays the licence fee of Rs 10 per m² of built-up area. Directorate of Fire and Emergency Services, Goa
Case 4
A 400 m² restaurant with 8 LPG cylinders in Mumbai
Eating house applying for a trade NOC under section 394 of the MMC Act
What applies Falls in the 50 to 500 m² or up to 10 cylinders tier, so a Station Officer inspects and an ADFO approves it. Inspection and the draft NOC take 7 working days, and rooftop restaurants are a separate risk row. Mumbai Fire Brigade, Municipal Corporation of Greater Mumbai
Case 5
A 13 m, 4-storey hotel
Hotel in Delhi, Odisha, Manipur or Nagaland
What applies Needs a certificate in all four, because each sets 12 m for hotels. The same hotel at 11 m would clear the height line in those states, but not in states that list hotels by floor area or star rating, such as Chhattisgarh. Government of Manipur
Case 6
A G+2 school in Puducherry
School up to ground plus 2 floors
What applies Category B: audit certificates from any two licensed agencies. Schools renew every year, although the general term is 3 years. Puducherry G.O. 61
Case 7
A coaching centre in a Rajasthan city
Coaching centre under an urban body
What applies Needs a fire NOC under the UDH order signed on 29 May 2026 and listed on 2 June, which amended the Model Rajasthan Building Regulations 2025. Urban Development and Housing Department, Rajasthan
Penalty for running a building without a fire NOC, by state
Fines and compounding fees run from Rs 500 to Rs 5 lakh across India, and most laws add sealing, utility disconnection or a daily fine while the breach continues.
| Offence | Penalty | Law |
|---|---|---|
| General offence (the national template) | Up to 3 months and/or Rs 10,000, plus Rs 1,000 a day | Model Bill 2019, Chapter VI DGFS, MHA |
| Not appointing a Fire Safety Officer | Rs 10 to Rs 50 per m² per month of default | Model Bill 2019, section 32; also Delhi, UP and Haryana DGFS, MHA |
| Breaching sections 15, 17 or 18 | Up to 2 years (English text; the Hindi text says 10) and/or Rs 1 lakh, plus Rs 5,000 a day | Uttarakhand Act 2016, section 21 Government of Uttarakhand |
| Offences under section 39(1), including a false compliance certificate | 1 month to 2 years and/or Rs 10,000 to Rs 1 lakh, plus Rs 3,000 a day | Gujarat Act 2013, section 39(1) LegitQueststudy |
| Breaching sections 14 to 17 or any provision of the Act | Up to 2 years and/or Rs 1 lakh | Meghalaya Act 2012, section 20 Invest Meghalaya |
| Breaching the building fire safety chapter | Up to 6 months and/or Rs 50,000, plus Rs 3,000 a day | Delhi Act 2007, section 37 CaseMinestudy |
| Breaching the multistorey building chapter | Up to 6 months and/or Rs 50,000, plus Rs 3,000 a day | Jharkhand Act 2024, section 37 Government of Jharkhand |
| Breaching the section 12(1) duty on water sources for fire fighting (Haryana) | Up to 3 months and/or Rs 50,000 | Haryana Act 2022, section 25 Government of Haryana |
| General contravention | Up to 3 months and/or Rs 10,000, plus Rs 1,000 a day | UP Act 2022, section 39 LegitQueststudy |
| Failure to take precautions | Up to 3 months and/or Rs 10,000, plus Rs 1,000 a day | Manipur Act 2026, section 35 Government of Manipur |
| Occupying a building without a Fire Safety Certificate (Assam) | Rs 10,000 to Rs 5 lakh by risk class, plus up to Rs 5,000 a day for a continuing high-risk offence | Assam Fire and Emergency Services Act 2025, section 26 Assam Act LIII of 2025 |
| Letting the yearly renewal lapse | Rs 500 a day up to Rs 2 lakh, plus 10% of the first application fee (set in July 2025; not repeated in the Act as passed in November 2025, so unconfirmed) | Tripura Home notice F.3-8(NOC)/TFES/2025 High Court of Tripura/TFES/2025) |
| Wilfully false self-certification | Fine up to Rs 5 lakh | Tripura Act 2022, section 26(A), inserted in 2025 High Court of Tripura/TFES/2025) |
| Not taking a fire safety certificate (cognizable, non-bailable) | Compounding fee from Rs 20,000 to Rs 5 lakh, by hazard and area | West Bengal Act 1950, section 38B West Bengal Fire and Emergency Services |
| Removing a fire service seal | Up to 3 months and/or Rs 25,000 | Jharkhand Act 2024, section 44(5); same in Haryana, UP and A&N (Delhi's section 44 sets a fine up to Rs 25,000; its prison term is not legible in the copy read) Government of Jharkhand |
| Ignoring a fire safety notification or direction | Fine up to Rs 500 | Karnataka Act 1964, section 25 CaseMinestudy |
| Failure to take notified precautions | Fine up to Rs 500 | J&K Fire Force Act 1967, section 22 (also applied in Ladakh) PRS copy |
Maharashtra's penalties are on its own page. Madhya Pradesh's 2026 amounts are left out until the damaged gazette page is proof-read, and UP's new civil penalty is listed under the 2026 changes.
Fire NOC fees: what each state actually publishes
Most fees are a rate per m² of built-up area, from Rs 2 in Mizoram to Rs 50 in Kerala, and some states charge nothing for the first stage.
As published
- Kerala, building NOCRs 12 to Rs 50 per m²Minimum Rs 20,000 for residential and hotels, Rs 26,000 for other uses; annual renewal Rs 2,500 to Rs 12,000 Kerala Fire and Rescue Services
- Andhra Pradesh, fire precaution feeRs 10 per m²Plus a bank guarantee of 15% of the fire-installation cost for 5 years; late renewal costs 25% extra AP State Disaster Response and Fire Services
- Telangana, fire precaution feeRs 10 per m²G.O.Ms.No.142 of 9 August 2016 Government of Telangana, Home Department
- GoaInitial NOC free; licence Rs 10 per m²Rs 150 per NOC per year for eateries up to 50 seats and small storage Directorate of Fire and Emergency Services, Goa
- Gujarat, residential 15 to 35 mRs 1,000 + Rs 10 per m² + Rs 1,000Plan approval, certificate and renewal fees, Regulations 2023, Annexure 8 Gujarat Fire Safety Compliance Portal
- West Bengal, high-risk buildingsRs 4.35 to Rs 13.05 per m²By fee group A to D, 2020 notification WBXPressstudy
- MeghalayaRs 3 to Rs 10 per m²Renewal Rs 500 to Rs 3,500 (12 June 2018); certificates last 3 years since July 2025 Fire and Emergency Services, Meghalaya
- MizoramRs 2 per m², capped at Rs 5,000Non-residential Rs 4 per m², capped at Rs 6,000, from 6 May 2026 Mizoram Fire and Emergency Services
- Assam, recommendation or NOCRs 200 to Rs 4,000By occupancy, height band and area; renewal is 10% of the NOC fee Fire and Emergency Services, Assam
- PuducherryFreeCitizen Charter of the Fire Service Department Fire Service Department, Puducherry
- LakshadweepNo application feeRules 2026; appeals cost Rs 1,000 or Rs 5,000 Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026
Karnataka's Seva Sindhu listing shows Rs 35 or Rs 60 per m² for a high-rise NOC; see the fees page. Tamil Nadu's single-window sheets say no fees are collected. Fees are not published online for Haryana, Chhattisgarh and most of the North-East. Flamekite lists only what an official notice or a legal database prints.
How India's fire NOC laws were written, 1950 to 2026
Three generations of law sit side by side: fire brigade acts of the 1950s and 1960s, certification regimes of the 1990s and 2000s, and Model Bill acts since 2012.
1950
West Bengal Fire Services Act, still the base law there; a 2018 amendment added the 3-year certificate. West Bengal Legislative Assembly
1958
The Centre circulates the Model Fire Force Bill, the first template for state fire acts. DGFS, MHA
1964
Karnataka Fire Force Act; the high-rise NOC power arrives only with the 2023 amendment. Government of Karnataka
1967
Jammu and Kashmir Fire Force Act, still applied in J&K and Ladakh, with a Rs 500 precaution fine. PRS copy
1985
Assam Fire Service Act, with its Rules of 1989 tying the NOC to the trade licence; replaced on 24 December 2025 by the Assam Fire and Emergency Services Act 2025. Assam Act LIII of 2025
1993
Odisha Fire Service Act (Act 30 of 1993), later given Fire Prevention and Fire Safety Rules in 2017. Home Department, Odisha
2006
Maharashtra Fire Prevention and Life Safety Measures Act, the precursor of the modern pattern. Maharashtra Fire and Emergency Services
2007
Delhi Fire Service Act, followed by the Delhi Fire Service Rules, 2010. Delhi Fire Service
2013
Gujarat Fire Prevention and Life Safety Measures Act, later run on the GujFireSafety CoP portal. LegitQueststudy
2019
MHA revises the Model Bill: Fire Safety Certificate in 1 month, qualified agencies, Fire Safety Officers, fire tax. DGFS, MHA
2022
Haryana, Uttar Pradesh and Tripura pass Model Bill style acts. Government of Haryana
2024
Jharkhand and Punjab follow; Punjab's Act makes a certificate last ordinarily at least 3 years. Punjab Gazette
6 June 2025
Tamil Nadu gazettes its Fire and Rescue Services Act 2025, still awaiting commencement. Government of Tamil Nadu, Gazette Extraordinary No. 263, 6 June 2025
2026
Six new instruments in one year: the MP, Arunachal and Manipur acts and the A&N, DNH and DD and Lakshadweep regulations. Government of Manipur
Fire NOC changes in 2026, latest first
From news reports, not yet an official source.
Checked against gazettes and fire service portals on 24 October 2026. Flamekite adds each new instrument here when it is found.
16 October 2026
Delhi defers its valid-until-cancelled certificate and annual Form K to about 20 May 2027; until then the 5-year and 3-year terms apply. Delhi Gazette Extraordinary, Part IV No. 314
7 October 2026
Telangana stops requiring a fire NOC for residential apartments below 24 m (Circular Memo Rc.No.3455/MSB/2026 of 26 September); a fire tower and fire command centre are now needed at 24 m for every occupancy. Telangana Fire, Disaster Response, Emergency and Civil Defence Department
15 September 2026
Tamil Nadu's Act 16 of 2026 removes references to the withdrawn NBC 2016 from its 2025 fire law. TeamLease RegTechnews report
14 September 2026
Manipur's Fire and Emergency Service Act 2026 comes into force: 5-year residential and 3-year non-residential certificates. Government of Manipur
3 September 2026
Madhya Pradesh publishes Act 16 of 2026; its commencement notification had not been found by 24 October. Government of Madhya Pradesh
3 September 2026
Lakshadweep's Fire and Emergency Services Rules 2026 come into force, with a 5-year certificate for all buildings. Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026
7 July 2026
The DNH and DD Regulation 2026 comes into force: certificates valid 5 years, with a self-declaration after 30 months. Gazette of India Extraordinary
2 June 2026
Tripura gazettes its Fire Safety Rules 2026, with self-certification for small buildings up to 10 m. Directorate of Fire and Emergency Services, Tripura
2 June 2026
Rajasthan's UDH lists its order of 29 May 2026, which makes a fire NOC mandatory for coaching centres and drops NBC references from its building regulations. Urban Development and Housing Department, Rajasthan
25 May 2026
The A&N Islands Fire and Emergency Service Regulation 2026 (No. 5 of 2026) is published; its commencement date is not yet notified. Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026
11 May 2026
Arunachal Pradesh publishes its Fire and Emergency Services Act 2026 (Act 12 of 2026), in force on publication. Government of Arunachal Pradesh
30 April 2026
BIS withdraws NBC 2016 and establishes NBCS 2026 (SP 7:2026) the same day. Gazette of India
2 January 2026
UP Act 10 of 2026 receives assent: once notified, sections 36 and 39 of the fire Act become civil penalties of up to Rs 75,000. Government of Uttar Pradesh
Official fire NOC portals you can apply on
Apply only on these government addresses, each published by the state's own fire service or single window. All 21 were checked on 24 October 2026.
Bihar
Bihar Fire NOC and Audit portal
Provisional and final NOC, renewal, audit and status tracking Bihar Fire Service
firenoc.bihar.gov.inChhattisgarh
CG Fire NOC portal
New NOC, renewal and fire audit; the third-party auditor you pick cannot be changed later Fire and Emergency Services and SDRF, Chhattisgarh
firenoc.cg.gov.inGoa
Goa Online
Initial NOC (FES91), final NOC (FES92) and renewal (FES93), with eSigned download Directorate of Fire and Emergency Services, Goa
goaonline.gov.inGujarat
GujFireSafety CoP
Fire safety certificate, renewal and Fire Safety Officer filings Directorate of Gujarat State Fire Prevention Services
gujfiresafetycop.inKerala
Kerala Fire and Rescue NOC portal
Building NOC, NOC verification, fee and time-frame PDFs; renewals on nocrnwl.fire.kerala.gov.in Kerala Fire and Rescue Services
noc.fire.kerala.gov.inMadhya Pradesh
e-Nagarpalika
Fire NOC (Building) online form and the public processing-time dashboard Urban Administration and Development Department, Madhya Pradesh
enagarpalika.mp.gov.inRajasthan
LSG fire service
Fire NOC registration; helpline 1800-180-4872 (its certificate verification link returned an error page on 24 October 2026) Local Self Government Department, Rajasthan
lsgonline.rajasthan.gov.in/fire_service.aspxTamil Nadu
TN Single Window Portal
Planning-permission NOC, fire licence and renewal from Tamil Nadu Fire and Rescue Services Tamil Nadu Fire and Rescue Services
tnswp.com/DIGIGOV/swp-tnswp.jspTripura
e-District Tripura
Recommendation, NOC and renewal with Aadhaar e-sign and e-GRAS payment e-District Tripura
edistrict.tripura.gov.inUttar Pradesh
UP Fire Service online
Online fire NOC applications and NOC verification Uttar Pradesh Fire and Emergency Services
upfireservice.gov.in/upfireWest Bengal
WBFES e-services
Fire Safety Recommendation, certificate, renewal, fire licence and self-certification West Bengal Fire and Emergency Services
wbfes.gov.in/eservices?language=enAssam
EoDB Assam
Fresh NOC (Form I), renewal (Form XII) and temporary structures (Form VI) Fire and Emergency Services, Assam
eodb.assam.gov.inMeghalaya
Invest Meghalaya
Provisional FSC (service 1171) and grant of FSC (service 14) Fire and Emergency Services, Meghalaya
investmeghalaya.gov.inMizoram
Mizoram Fire and Emergency Services
Online NOC link and the May 2026 fee notification Mizoram Fire and Emergency Services
fireservice.mizoram.gov.inHimachal Pradesh
Emerging Himachal
Fire NOC application in Form A through the single window Emerging Himachal single window
emerginghimachal.hp.gov.inUttarakhand
Invest Uttarakhand
Fire services 26.0 and 27.0 on the state single window Invest Uttarakhand single window
investuttarakhand.uk.gov.in/site/ServiceListingNew/iw/Y/id/ALLJammu and Kashmir
J&K Single Window
Provisional NOC and final or renewal NOC, with published turn-around times J&K Single Window Clearance System
singlewindow.jk.gov.inDNH and DD
DNH and DD Single Window
Provisional NOC, final NOC and renewal for the UT DNH and DD single window portal
swp.dddgov.in/fire-and-emergency-services-dnhddMaharashtra
MFS e-approval
Fire approvals in areas under the Director of Maharashtra Fire Services Maharashtra Fire and Emergency Services
mahafireservice.com/LoginDelhi
DFS certificate renewal
Renewal of Delhi fire safety certificates, with the current 5-year and 3-year terms Delhi Fire Service
dfs.delhi.gov.in/dfs/renewal-fire-safety-certificatefscnocTelangana
TG Fire building NOC
Provisional and occupancy NOC for Telangana buildings Telangana Fire, Disaster Response, Emergency and Civil Defence Department
fire.telangana.gov.in/Login1.aspx
Documents required for a fire NOC application
Lists differ by state and stage, but these items recur in the official checklists Flamekite read in 2026.
- Building plans with the fire layout; Tamil Nadu asks for 3 sets (site, elevation and typical floor) with Appendices 1 and 2 for a planning-permission NOC Tamil Nadu Fire and Rescue Services
- Proof of identity and a building plan drawn to the national code, with a separate fire layout plan (Meghalaya SOP) Invest Meghalaya
- Land documents and a statement of the nature of the business carried on (Puducherry) Fire Service Department, Puducherry
- Details of existing fire-fighting arrangements and any previous NOC (Puducherry) Fire Service Department, Puducherry
- Registration certificate and layout plan before construction; building permission or an affidavit after construction (Chhattisgarh) Fire and Emergency Services and SDRF, Chhattisgarh
- A bank guarantee of 15% of the estimated fire-system cost, valid 5 years, with a provisional application (Bihar) Bihar Rules 2021
- For the final stage: a copy of the NOC, details of the installed fire safety measures, and a fire safety plan with alarm and hydrant layouts (Tamil Nadu) Tamil Nadu Fire and Rescue Services
- For renewal: the last NOC and a self-declaration (Assam, Form XII), or an annual self-declaration on Rs 100 stamp paper (Goa) Fire and Emergency Services, Assam
- Self-attested copies only, with no affidavit or notary, for Tripura's self-certification forms D, J, N and R from October 2026 Directorate of Fire and Emergency Services, Tripura
Fire NOC mistakes that cost owners months or a sealed building
Most rejections and closures trace back to six avoidable errors.
If Letting the certificate expire before renewing
In Assam an expired NOC needs a fresh application, not a renewal. Apply early; Odisha's certificates ask for renewal at least 3 months before expiry. Fire and Emergency Services, Assam
If Trusting an old official page over the gazette
Goa's flowchart still says one year although its 23 June 2025 notification set 5 years. Read the newest gazette, and check its commencement date. Government of Goa, Official Gazette Series II No. 14, 3 July 2025
If Reading the NBCS 2026 high-rise line of 24 m as a NOC exemption
NBCS 2026 is voluntary and only Assam had written it into its fire law by 24 October 2026; your state's own trigger still applies, and Telangana moved its residential line to 24 m only by its own circular. BIS, SP 7:2026
If Moving in before the final certificate
The occupancy certificate is barred until the fire measures comply, and section 57 of the Model Bill lets the fire service seal the premises. DGFS, MHA
If Picking a third-party auditor casually in Chhattisgarh
The state portal warns that once you select an auditor the choice is final, so compare auditors before you click. Fire and Emergency Services and SDRF, Chhattisgarh
If Submitting fire plans in an old format in Kerala
Since 14 July 2025 the Kerala portal accepts fire plans only on its A1 template. Kerala Fire and Rescue Services
Fire NOC renewal: deadlines and habits that keep you legal
Renewal windows run from 2 weeks to 6 months before expiry, depending on the state.
Do
- Apply for renewal in Form M 45 days before expiry in Bihar. Bihar Rules 2021
- File 6 months before expiry in Manipur, as section 25(2) of its 2026 Act requires. Government of Manipur
- In Delhi, apply 6 months before expiry: the term is 5 years for homes and 3 years for other buildings until about 20 May 2027. Delhi Gazette Extraordinary, Part IV No. 314
- In Tripura, renew every year with a self-certificate or third-party Form-B, at least 2 weeks before expiry. High Court of Tripura/TFES/2025)
- File Goa's annual self-declaration (Annexure A) even in the 4 years between 5-yearly renewals. Directorate of Fire and Emergency Services, Goa
- Keep the January and July maintenance certificates where your law asks for them, as the Model Bill does. DGFS, MHA
Don’t
- Don't let an Andhra Pradesh licence lapse: renewing late costs 25% extra. AP State Disaster Response and Fire Services
- Don't miss Meghalaya's renewal at the end of its 3-year term: after 7 free days the late fee is Rs 5 a day, then Rs 15 a day after day 15. Fire and Emergency Services, Meghalaya
- Don't assume every building gets 5 years: hotels, hospitals and assembly buildings in Uttar Pradesh renew every year. LegitQueststudy
- Don't renew a Kerala NOC every year out of habit: since 4 August 2025 a non-hazardous building can take 5 years at 5 times the annual fee. Home Department, Kerala
Fire NOC terms: FSC, fire safety recommendation, fire licence and more
Ten words that appear on forms and certificates, with the law each one comes from.
- Fire NOC
- No objection certificate from the fire service; the common name for both the plan-stage and the final approval under the state law. Fire and Emergency Services, Assam
- Fire Safety Certificate (FSC)
- The Model Bill 2019 name for the final certificate, issued within 1 month of a complete application; used in Andhra Pradesh, Haryana, Punjab, UP, West Bengal and the 2026 UT regulations. DGFS, MHA
- Fire Safety Recommendation
- The plan-stage approval in West Bengal, Odisha, Tripura and Assam, issued before construction starts. West Bengal Fire and Emergency Services
- Fire licence
- Tamil Nadu's final-stage approval, issued with the completion certificate under the 1985 Act. Tamil Nadu Fire and Rescue Services
- Fire Safety Officer
- A post notified premises must fill under section 26 of the Model Bill; in Gujarat, Fire Safety Officers are private professionals who file compliance declarations every 6 months. Gujarat Fire Safety Compliance Portal
- Qualified or licensed agency
- A firm licensed to install or certify fire systems: Form M agencies in Maharashtra, qualified agencies under UP's 2024 Rules. LegitQueststudy
- Form B
- Maharashtra's maintenance certificate from a licensed agency, filed 2 times a year, in January and July. Maharashtra Fire and Emergency Services
- Deemed approval
- A licence treated as granted when the authority misses its deadline, as in section 27(5) of Tamil Nadu's 2025 Act. Government of Tamil Nadu, Gazette Extraordinary No. 263, 6 June 2025
- Self-certification
- The owner certifies compliance instead of waiting for an inspection; Puducherry's Category C (non-residential G+1) gets an automatic certificate, with 25% of cases inspected at random. Puducherry G.O. 61
- Fire Safety Supervisor
- A building-level post required by section 21-A of Andhra Pradesh's 2026 amendment and by Madhya Pradesh's 2026 Act. Andhra Pradesh Legislative Assembly
Five fire NOC myths, checked against the law
You may have read
There is one central fire NOC for all of India.
Myth
What the sources say
There is none. Fire is a State subject, so each of the 36 states and UTs issues its own under its own law. Lok Sabha
You may have read
Once issued, a fire NOC lasts for ever.
Myth
What the sources say
States set terms of 1 to 5 years. Delhi's valid-until-cancelled rule, which would still need an annual Form K, is deferred to about 20 May 2027. Delhi Gazette Extraordinary, Part IV No. 314
You may have read
NBCS 2026 ended the fire NOC for buildings under 24 m.
Myth
What the sources say
NBCS 2026 is voluntary, only Assam had written it into its fire law by 24 October 2026, and even there the Government sets the high-rise height; your state's own trigger, usually 15 m, still decides. BIS, SP 7:2026
You may have read
A NABH fire inspection replaces a hospital's fire NOC.
Myth
What the sources say
NABH accepts a 1-year third-party Type A inspection certificate only for accreditation; the statutory NOC is still needed. National Accreditation Board for Hospitals and Healthcare Providers
You may have read
Small shops and restaurants never need a fire NOC.
Myth
What the sources say
Mumbai issues trade NOCs even for premises of 50 m² or less with 1 or 2 LPG cylinders, through a Station Officer. Mumbai Fire Brigade, Municipal Corporation of Greater Mumbai
From drawing board to occupancy: the fire approval path of a new building
A new building meets the fire service at least 3 times: at plan approval, at completion and at every renewal.
Plan scrutiny
The fire drawings are checked against the state's rules; Bihar gives the applicant 30 days to correct plan defects. Bihar Rules 2021
Provisional NOC
Issued before work starts. Andhra Pradesh's 2026 amendment sets 21 days for this decision. Andhra Pradesh Legislative Assembly
Construction reporting
In Bihar the owner reports the start of work a week ahead and the progress every 6 months. Bihar Rules 2021
Installation
Under the 2019 Model Bill only a qualified agency may install the fire and life safety systems. DGFS, MHA
Final inspection and certificate
The certificate is due within 1 month of a complete application under the Model Bill, 30 days in Andhra Pradesh. DGFS, MHA
Occupancy certificate
The planning authority issues it only after the fire certificate, as section 19(5) of Haryana's Act spells out. Government of Haryana
Maintenance
Twice-yearly maintenance certificates in January and July under the Model Bill pattern, or an annual self-declaration where the state uses one. DGFS, MHA
Renewal
Due 1 to 5 years later depending on the state; the previous NOC is the key document. Fire and Emergency Services and SDRF, Chhattisgarh
What Flamekite could not confirm, state by state
These gaps are real on 24 October 2026: the official text is missing, unreadable or behind a login. Treat any page that states them as settled fact with care.
Karnataka
Validity
The KSFES site and 5 variant addresses were unreachable. Seva Sindhu now lists the fee and service times, but no official validity period was found; only a news report of renewal every 2 years exists. Seva Sindhu
Madhya Pradesh
Penalty amounts and start date
The penalty page of the 2026 Act is damaged in the gazette scan, and no commencement notification was found, so Flamekite does not quote its fines. Government of Madhya Pradesh
Rajasthan
Fees and validity
The LSG notification of 14 September 2023 is an 18-page Hindi scan; its numbers wait for a person's proof-read before Flamekite publishes them. Local Self Government Department, Rajasthan
Telangana
Renewal period
A 2016 circular says 5 years and the department FAQ says every year; Flamekite shows both until the department settles it. Telangana Fire, Disaster Response, Emergency and Civil Defence Department
West Bengal
Penalties after the 2022 amendment
The 1996 text of sections 11J and 11K sets 3 to 5 years or Rs 20,000 to Rs 5 lakh; whether Act VIII of 2022 changed them could not be read, and the consolidated text sits behind a paid login. West Bengal Fire and Emergency Services
Haryana and Jharkhand
Rules and start dates
Haryana's December 2025 certificate portal is unpublished and Jharkhand's 2024 Act has no commencement notification or rules found; both Acts themselves are verified, and Jharkhand's Single Window is live. Government of Haryana
Sikkim and A&N
Commencement
Sikkim's 2023 Act and the A&N Regulation of 2026 start on a notified date that Flamekite has not found. Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026
Meghalaya
Fees in practice
The 2018 notification charges Rs 3 to Rs 10 per m², but the Invest Meghalaya SOP says no fee; check the amount at payment. Invest Meghalaya
Fire NOC helplines and head offices in 10 states
Numbers and addresses exactly as each fire service publishes them, checked on 24 October 2026. For a fire, call 112 or 101.
State Fire Office, Bihar Fire Service Bihar Fire Service
Fire NOC and audit
- Address
- Lodipur, Patna
- Website
- firenoc.bihar.gov.in
Fire and Emergency Services and SDRF, Chhattisgarh Fire and Emergency Services and SDRF, Chhattisgarh
Directorate headquarters
- Address
- Sector 19, Atal Nagar, Nava Raipur
- Website
- firenoc.cg.gov.in
Directorate of Fire and Emergency Services, Goa Directorate of Fire and Emergency Services, Goa
Fire NOC
- Address
- St. Inez, Panaji
- Phone
- 7391047132
- Website
- dfes.goa.gov.in
Directorate of Gujarat State Fire Prevention Services Directorate of Gujarat State Fire Prevention Services
State fire prevention directorate
- Address
- Block No. 13, 3rd Floor, Dr. Jivraj Mehta Bhavan, Gandhinagar 382011
- Website
- gujfiresafetycop.in
Department of Fire Services, Himachal Pradesh Department of Fire Services, Himachal Pradesh
Director of Fire Services
- Address
- Barnes Court, near Raj Bhavan, Shimla 171002
- Phone
- 0177-2629945
- Website
- himachal.nic.in/fire
Kerala Fire and Rescue Services Kerala Fire and Rescue Services
Headquarters
- Address
- Fire Force Junction, Pulimoodu P.O., Thiruvananthapuram 695001
- Website
- fire.kerala.gov.in
Local Self Government Department, Rajasthan Local Self Government Department, Rajasthan
Fire NOC nodal officer and helpline
Directorate of Fire and Emergency Services, Tripura Directorate of Fire and Emergency Services, Tripura
Home (F&ES) Department
- Address
- Agartala
- Phone
- 0381-2326451
- Website
- fireservice.tripura.gov.in
Fire Brigade Headquarters, West Bengal Fire and Emergency Services Silpasathi, West Bengal single window
Fire safety certificates, South Bengal
- Address
- 13D Mirza Galib Street, Kolkata 700016
- Phone
- 033-2225 2222-8
- Website
- wbfes.gov.in
Director, Fire and Emergency Services, Assam Fire and Emergency Services, Assam
Renewal applications (Form XII)
- Address
- Panbazar, Guwahati 781001
Questions about Fire NOC
What is a fire NOC?
- A fire NOC is a certificate from your state's fire service saying that a building's fire safety plans, or its installed fire systems, meet the state's fire law. It comes in two stages: a provisional NOC before construction and a final NOC or fire safety certificate before occupation.
Is a fire NOC mandatory for every building?
- No. It is mandatory for the buildings your state lists: usually those above 15 m, special occupancies such as schools, hospitals, hotels and assembly halls, and mixed buildings with a floor above 500 m². A small home below your state's trigger usually needs none.
Who issues a fire NOC in India?
- The state or UT fire service in most of India, a municipal Chief Fire Officer in Maharashtra's corporations, and the Local Self Government Department in Rajasthan. No central ministry issues one.
How long is a fire NOC valid?
- It depends on the state: 1 year for high-risk premises in Chhattisgarh and Uttar Pradesh, 3 years in Gujarat, Haryana and West Bengal, and 5 years in Goa, Kerala (non-hazardous), Lakshadweep and DNH and DD.
How do I write an application for a fire NOC?
- In most states you no longer write a letter: you fill in the state's online form and upload the drawings. Where paper is still used, use the prescribed form, such as Form D at a Nagaland fire station, and attach the plans and your previous NOC. The application format page lists the form for each state.
Can I get a fire NOC online?
- Yes, in most states: Bihar, Chhattisgarh, Goa, Gujarat, Kerala, Uttar Pradesh and West Bengal, among others, run official portals. Ladakh's fire service website, launched on 6 October 2026, had no public address by 24 October 2026; Manipur and Nagaland opened their routes in 2026, and Sikkim's 2025 Rules require online applications through a portal that did not respond.
How long does a fire NOC take?
- On paper, from 3 working days for an Andhra Pradesh provisional NOC (by circular; its Act says 21 days) to 60 working days for a Karnataka high-rise NOC; the Model Bill says 1 month. In practice, Madhya Pradesh's own dashboard shows Jabalpur averaging under 28 days and Bhopal about 61 days against a promise of 30 working days.
What is the fee for a fire NOC?
- Usually a rate per m² of built-up area: Rs 10 in Andhra Pradesh and Telangana, Rs 12 to Rs 50 in Kerala, Rs 2 to Rs 4 in Mizoram. Goa's initial NOC and Puducherry's NOC are free.
Keep reading
- Fire accidents in India: NCRB data5,971 fire accidents and 5,888 deaths in 2024, by place and by state.
- Do I need a fire NOC?Your state, use, height and floor area: the rule your building crosses.
- Fire safety norms in IndiaEvery state's fire Act and rules, and the central laws beside them.
- Fire NOC for residential buildingsHouses, villas and low-rise homes: the residential line in 32 states.
- Fire NOC for apartmentsThe apartment line in all 36 states, builder vs residents, and buyer checks.
- Fire NOC for mallsShopping and multiplex malls: D-6, the 100-point DGFS checklist and 23 states.
- Fire NOC for cinemasCinema halls and multiplexes: licences, the Uphaar directions and state lines.
- Fire NOC for banquet hallsMarriage and party halls, pandals and the Dabwali judgment, in 29 states.
Keep exploring
Fire NOC: the steps
The codes behind the fire NOC
Sources
Each source was opened and read on the date shown. How Flamekite checks its sources
- Legislative Department, Ministry of Law and Justice: The Constitution of India (Twelfth Schedule, item 7: Fire services; Article 243W) (opens in a new tab)
- Lok Sabha (Ministry of Home Affairs): Unstarred Question 1199, 30 July 2024: fire is a State subject; NCRB 2022 fire incidents and deaths; fire services scheme (opens in a new tab)
- All India Radio News: Union Home Ministry launches scheme for expansion and modernisation of fire services in states, total outlay Rs 5,000 crore (July 2023) (opens in a new tab)
- Directorate General Fire Services, Civil Defence and Home Guards (MHA): Revised Model Fire and Emergency Service Bill, 2019 (opens in a new tab)
- Maharashtra Fire and Emergency Services: Fire Act: Maharashtra Fire Prevention and Life Safety Measures Act, 2006 and Rules (opens in a new tab)
- Local Self Government Department, Rajasthan: Fire service: Fire NOC registration and certificate verification (nodal officer and helpline) (opens in a new tab)
Show all 111 sourcesShow fewer
- Government of Madhya Pradesh (PRS copy of MP Gazette Extraordinary, 3 September 2026): MP Agnishaman Evam Apatkalin Sevayen Adhiniyam, 2026 (MP Act 16 of 2026) (opens in a new tab)
- Government of Haryana (PRS copy): Haryana Fire and Emergency Services Act, 2022 (Act 14 of 2022) (opens in a new tab)
- Directorate General Fire Services, Civil Defence and Home Guards (MHA): National Building Code of India: Fire and Life Safety (NBC described as a recommendatory document; advisory of 18 April 2017) (opens in a new tab)
- Ministry of Health and Family Welfare and NDMA (text reproduced by NABH): Joint advisory to prevent hospital fires, 23 March 2024 (HFW/Advisory to prevent hospital fires/23rdMarch2024/1) (opens in a new tab)
- Department of Information and Public Relations, Nagaland: Fire and Emergency Services advisory on fire safety NOC applications (Form D at the local fire station, then Fire Headquarters Kohima) (opens in a new tab)
- Fire and Emergency Services, Assam: Process flow of service delivery: Recommendation, then NOC, through the EoDB portal (opens in a new tab)
- Fire and Emergency Services and SDRF, Chhattisgarh: HQ order No. 204/Agnishaman/2025, 16 October 2025: risk-based NOC validity of 3, 2 or 1 years (opens in a new tab)
- Gazette of India (Bureau of Indian Standards notification): Gazette of India Extraordinary, Part III Sec 4, No. 299, 30 April 2026: SP 7:2026 established, SP 7:2016 withdrawn (Ref HQ-PUB013/1/2020-PUB-BIS (1529)) (opens in a new tab)
- Urban Development and Housing Department, Rajasthan: UDH order signed 29 May 2026, listed 2 June 2026, amending the Model Rajasthan Building Regulations 2025 (fire NOC for coaching centres) (opens in a new tab)
- Government of Assam (PRS copy): Assam Fire Service Act, 1985 (Act XIII of 1985), with the Assam Fire Service Rules, 1989 (opens in a new tab)
- Government of Bihar, Home Department (English copy hosted by Bihar Fire Service): Bihar Fire Service Rules, 2021: rule 15 (NOC thresholds, forms, validity, renewal), rules 20 to 26 and Schedule C (opens in a new tab)
- Government of Andhra Pradesh, Home (Prisons and Fire) Department (copy hosted by AP Fire Services): G.O.Ms.No.218, 22 December 2023: periodicity of renewal of No Objection Certificates for non-residential and residential buildings (opens in a new tab)
- Government of Arunachal Pradesh (PRS copy of AP Gazette Extraordinary No. 128, 11 May 2026): Arunachal Pradesh Fire and Emergency Services Act, 2026 (Act 12 of 2026) (opens in a new tab)
- Assam Gazette Extraordinary No. 811, 24 December 2025 (PRS copy of the gazette): The Assam Fire and Emergency Services Act, 2025 (Assam Act No. LIII of 2025), notification No. LGL.52/2025/3: sections 1 to 67 and Schedule I (opens in a new tab)
- Government of Goa, Official Gazette Series II No. 14, 3 July 2025: Home Department notification 3/14/2024-HD(G)/1652, 23 June 2025: 5-year fire NOC validity (opens in a new tab)
- Gujarat Fire Safety Compliance Portal (GujFireSafety CoP): Gujarat Fire Prevention and Life Safety Measures Regulations, 2023 (fees in Annexure 8) (opens in a new tab)
- Himachal Pradesh Fire Services (NOC copy hosted by ABVGIET, Shimla): Fire NOC for an institutional building in Shimla, valid 23 January 2024 to 22 January 2026 (opens in a new tab)
- Government of Jharkhand, Single Window Clearance System: Directorate of Fire Service: Advisory for Fire Safety (Pre Construction), Fire NoC before Occupancy Certificate and Renewal of fire NOC, each with a 30-day timeline (opens in a new tab)
- Government of Karnataka (PRS copy): Karnataka Fire Force (Amendment) Ordinance, 2023: section 13(3) high-rise NOC (opens in a new tab)
- Home (F) Department, Kerala (on the Kerala Fire and Rescue renewal portal): G.O.(Ms)No.143/2025/HOME, 4 August 2025: fire NOC valid 5 years (non-hazardous) or 2 years (hazardous) (opens in a new tab)
- Urban Administration and Development Department, Madhya Pradesh (e-Nagar Palika): User manual, citizen side: Fire Safety Certificate, version 1.0 (15 November 2025, in force from 30 May 2025) (opens in a new tab)
- Government of Manipur (PRS copy): Manipur Fire and Emergency Service Act, 2026 (Act 9 of 2026) (opens in a new tab)
- Gazette of Meghalaya No. 33, Part IIA, 14 August 2025: Home (Police) notification No. HPL.36/2019/212 of 24 July 2025: Fire NOC and Fire Clearance Certificate valid 3 years from issue; random or surprise inspections; suspension or revocation (opens in a new tab)
- Home Department, Government of Mizoram (copy on the Mizoram Fire and Emergency Services site): Notification No. B-20011/2/2026-HM(F&ES), 20 August 2026: Mizoram Fire and Emergency Services (Superintendence and Control of the Fire Force and Fire Safety and Prevention) (Amendment) Rules, 2026, substituting Rule 57 and inserting Rules 57(A) and 57(B) (opens in a new tab)
- Directorate of Fire and Emergency Services, Nagaland: Nagaland Fire and Emergency Services Act (Act No. 5 of 2023), Nagaland Gazette, 31 August 2023 (opens in a new tab)
- Home Department, Government of Odisha: Order No. 50908 of 19 November 2019: procedure for issue and renewal of Fire Safety Certificates and Fire Safety Recommendations (issuing officer, validity, inspecting team and time limit by building type) (opens in a new tab)
- Punjab Government Gazette (Extraordinary), copy hosted by PRS Legislative Research: Punjab Govt. Gazette (Extra), 26 November 2024: the Punjab Fire and Emergency Service Act, 2024 (Punjab Act No. 12 of 2024), Notification No. 12-Leg./2024 of 27 October 2024 (opens in a new tab)
- Urban Development, Housing and Local Self Government Departments, Rajasthan: Joint order No. P.11(9)UDH/2020 Part, 14 September 2023, on the fire safety certificate and fire NOC (18-page Hindi scan) (opens in a new tab)
- Government of Sikkim, Sikkim Government Gazette Extraordinary No. 466, 17 December 2025: The Sikkim Fire and Emergency Services Rules, 2025: Home Department notification No. 99/Home/2025, 17 December 2025, under section 63 of Act 4 of 2023, with Schedules I to V and Forms A1 to A20 (opens in a new tab)
- Tamil Nadu Fire and Rescue Services: NOC procedure: Director above 18.3 m, District Officer up to 18.3 m (opens in a new tab)
- Telangana Fire, Disaster Response, Emergency and Civil Defence Department: FAQs: building NOC and renewal (opens in a new tab)
- High Court of Tripura (copy with the 2025 amendments and Home notice F.3-8(NOC)/TFES/2025): Tripura Fire and Emergency Services Act, 2022, section 26(C) and renewal lapse fee (opens in a new tab)
- Government of Uttarakhand, Home Section-4 (copy hosted by Uttarakhand Fire and Emergency Services): Notification No. 342/XX-3/2021-2(39)/2006 of November 2021 under section 26 of the 2016 Act: 5 year validity for residential buildings except hotels, 3 years for other buildings, six-monthly self-declaration, fresh certificate on change of use (opens in a new tab)
- West Bengal Legislative Assembly (PRS copy): West Bengal Fire Services (Amendment) Bill, 2018: section 11C(3A), 3-year fire safety certificate (opens in a new tab)
- Office of the Chief Fire Officer, Andaman and Nicobar Islands: Fire Clearance Certificate format: no objection for a period of one year (opens in a new tab)
- Gazette of India, Ministry of Home Affairs (copy hosted by TaxHeal): S.O. 2264(E) of 6 May 2026: the Haryana Fire and Emergency Services Act, 2022 extended to the Union territory of Chandigarh, with modifications (opens in a new tab)
- Gazette of India Extraordinary (CG-DL-E-02062026-273069): Dadra and Nagar Haveli and Daman and Diu Fire and Emergency Service Regulation, 2026 (No. 6 of 2026) (opens in a new tab)
- Delhi Gazette Extraordinary, Part IV No. 314 (SG-DL-E-17102026-277257): Home Department notification F. No. 6/DFS/MS/HQ/MISC/2026/01/631, 16 October 2026: commencement of amended Rules 34 to 38 extended to 20 May 2027 (opens in a new tab)
- Jammu and Kashmir Official Gazette (Extraordinary), copy hosted by the Housing and Urban Development Department: J&K Official Gazette, Vol. 134, No. 39-4, 24 December 2021: the Jammu and Kashmir Unified Building Bye-Laws, 2021 (opens in a new tab)
- Housing and Urban Development Department, UT Ladakh: Draft Ladakh Building Bye Laws, 2025, published for objections under section 219 of the J&K Municipal Act 2000 (listed 17 October 2025; clause 8.12 Fire Clearance Criteria read from the page images) (opens in a new tab)
- Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026: Lakshadweep Fire and Emergency Services Rules, 2026 (Rule 12: 5-year fire safety certificate) (opens in a new tab)
- Government of Puducherry, Home Department (copy hosted by the Fire Service Department): G.O.Ms.No.61, 10 September 2025: Fire Safety Audit and Issue of NOC, Third Party Fire Safety Audit, Categories A, B and C, renewal, temporary licences, and Annexures I to V on licensed agencies and the Category C protocol (opens in a new tab)
- Home Department, Chhattisgarh (on the CG Fire NOC portal): Notification under section 14(1), 29 November 2022: buildings that need a fire NOC (opens in a new tab)
- Andhra Pradesh Legislative Assembly (PRS copy of AP Gazette Part IV-A No. 12, 4 March 2026): Andhra Pradesh Fire Service (Amendment) Bill, 2026 (L.A. Bill No. 12 of 2026): new section 13 thresholds, 21-day and 30-day timelines (opens in a new tab)
- Telangana Fire, Disaster Response, Emergency and Civil Defence Department: DG Circular Memo Rc.No.3455/MSB/2026, 26 September 2026: 24 m threshold for residential apartments (opens in a new tab)
- Uttarakhand Legislative Assembly (PRS copy): Uttarakhand Fire and Emergency Service (Amendment) Bill, 2022: residential buildings of 12 m and above (opens in a new tab)
- Directorate of Fire and Emergency Services, Tripura: Tripura Fire Safety Rules, 2026 (Tripura Gazette, 2 June 2026) (opens in a new tab)
- Urban Administration and Development Department, Madhya Pradesh (e-Nagarpalika): Online Single Window System Dashboard for Fire NOC (queried 1 April 2020 to 24 October 2026 for Bhopal, Indore, Jabalpur and Gwalior) (opens in a new tab)
- Supreme Court of India: SMW(C) 7/2020, In Re: Proper Treatment of COVID-19 Patients, order of 19 July 2021 restating the directions of 18 December 2020 (opens in a new tab)
- Directorate of Fire and Emergency Services, Goa: BRAP 2024 item 284: fire NOC fees and timeline (opens in a new tab)
- Mumbai Fire Brigade, Municipal Corporation of Greater Mumbai: Fire SOP, single window: online trade NOC under section 394 of the MMC Act, risk-tier table (opens in a new tab)
- Government of Uttarakhand (PRS copy): Uttarakhand Fire and Emergency Service, Fire Prevention and Fire Safety Act, 2016 (Act 37 of 2016) (opens in a new tab)
- Invest Meghalaya: Meghalaya Fire and Emergency Services Act, 2012 (Act 5 of 2012) (opens in a new tab)
- Government of Jharkhand (PRS copy): Jharkhand Fire Service Act, 2024 (Act 9 of 2024) (opens in a new tab)
- West Bengal Fire and Emergency Services: FAQ: fire safety certificate, 14.5 m line, compounding under section 38B (opens in a new tab)
- PRS copy: Jammu and Kashmir Fire Force Act, 1967, section 22 (opens in a new tab)
- Kerala Fire and Rescue Services: Fee structure, G.O.(Ms)No.272/2024/Home (opens in a new tab)
- AP State Disaster Response and Fire Services: AP Fire and Emergency Operations and Levy of Fee Rules, 2006 (G.O.Ms.306, 8 December 2006) (opens in a new tab)
- Government of Telangana, Home (Ser.IV) Department: G.O.Ms.No.142, 9 August 2016: fire precaution fee Rs 10 per m² (opens in a new tab)
- Fire and Emergency Services, Meghalaya: Notification HPL.179/2017/85, 12 June 2018: fee structure and annual renewal fees (opens in a new tab)
- Mizoram Fire and Emergency Services: Home Department notification G/262/2026-HM (F&ES), 6 May 2026: rate of NOC fees (opens in a new tab)
- Fire and Emergency Services, Assam: Fee structure for fire NOC through the EoDB payment gateway (renewal fee 10% of NOC fee) (opens in a new tab)
- Fire Service Department, Puducherry: Services: issue of fire NOC or licence, free (categories and validity are in G.O.Ms.No.61, source py-go61-scan) (opens in a new tab)
- Home Department, Odisha (Fire Service branch): Odisha Fire Service Act, 1993 and Odisha Fire Prevention and Fire Safety Rules, 2017 (with 2025 amendment) (opens in a new tab)
- Delhi Fire Service: Delhi Fire Service Rules, 2010 (consolidated copy) (opens in a new tab)
- Government of Tamil Nadu, Gazette Extraordinary No. 263, 6 June 2025: Tamil Nadu Fire and Rescue Services Act, 2025 (TN Act 37 of 2025) (opens in a new tab)
- Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026: Andaman and Nicobar Islands Fire and Emergency Service Regulation, 2026 (No. 5 of 2026) (opens in a new tab)
- Government of Uttar Pradesh (PRS gazette copy): UP Act 10 of 2026 (UP Sugamya Vyaapar Act, 2025, assent 2 January 2026): fire Act penalties up to Rs 75,000 (opens in a new tab)
- Bihar Fire Service: Bihar Fire NOC and Audit portal: introduction and State Fire Office contacts (opens in a new tab)
- Fire and Emergency Services and SDRF, Chhattisgarh: CG Fire NOC portal: New NOC, NOC Renewal, Fire Audit (with helplines) (opens in a new tab)
- Directorate of Fire and Emergency Services, Goa: Ease of Doing Business: online fire NOC on Goa Online (FES91, FES92, FES93), annual self-declaration (opens in a new tab)
- Directorate of Gujarat State Fire Prevention Services: GujFireSafety CoP home page (Directorate address and phone) (opens in a new tab)
- Kerala Fire and Rescue Services: Fire NOC portal: online NOC, renewal, NOC verification, A1 template for fire plans from 14 July 2025 (opens in a new tab)
- e-District Tripura: Guidelines for fire safety certificate and NOC services (Aadhaar e-sign, e-GRAS payment) (opens in a new tab)
- Uttar Pradesh Fire and Emergency Services: UP Fire Service online portal (applications and NOC verification) (opens in a new tab)
- West Bengal Fire and Emergency Services: E-services: Fire Safety Recommendation, Fire Safety Certificate, renewal, fire licence (opens in a new tab)
- Fire and Emergency Services, Meghalaya: Official site linking Invest Meghalaya services 14 (grant of FSC) and 1171 (provisional FSC) (opens in a new tab)
- Emerging Himachal single window: Fire NOC checklist and procedure (Form A) (opens in a new tab)
- Invest Uttarakhand single window: Service listing: fire services 26.0 and 27.0 (opens in a new tab)
- J&K Single Window Clearance System: Turn-around time: provisional and final or renewal fire NOC (opens in a new tab)
- DNH and DD single window portal: Fire and Emergency Services DNHDD: online services and reform points (opens in a new tab)
- Delhi Fire Service: Renewal of fire safety certificate (FSC/NOC) (opens in a new tab)
- Tamil Nadu Fire and Rescue Services: Documents for planning-permission NOC, completion certificate or fire licence, and renewal (opens in a new tab)
- Invest Meghalaya: Standard operating procedure for fire clearance (opens in a new tab)
- Fire Service Department, Puducherry: Documents required for fire NOC and clearance (opens in a new tab)
- Directorate of Fire and Emergency Services, Tripura: Notification, October 2026: self-certification forms no longer need an affidavit (with Directorate contacts) (opens in a new tab)
- Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 National Building Construction Standards 2026, Part F: Fire and Life Safety (opens in a new tab)
- National Accreditation Board for Hospitals and Healthcare Providers (NABH): Revised Advisory for Minimum Essential Fire Safety Measures, 20 September 2022 (opens in a new tab)
- Seva Sindhu, Government of Karnataka: Application for No Objection Certificate (High rise Building) - Fire & Emergency: documents, fee under G.O. of 13-09-2019, 60 working days (opens in a new tab)
- Directorate of Fire and Emergency Services, Goa: DFES Goa home page (contacts) (opens in a new tab)
- Department of Fire Services, Himachal Pradesh: HP Fire Services home page (Barnes Court, Shimla) (opens in a new tab)
- Kerala Fire and Rescue Services: Kerala Fire and Rescue Services home page (headquarters contacts) (opens in a new tab)
- Silpasathi, West Bengal single window: Fire and Emergency Services: simplified procedure and offices (Kolkata headquarters, Siliguri) (opens in a new tab)
- Fire and Emergency Services, Assam: Standard Form XII: renewal application (renewable for 1, 2 or 3 years by hazard) (opens in a new tab)
- Kerala Fire and Rescue Services: Time frame for site NOC, final NOC and renewal (opens in a new tab)
- LegitQuest (legal database): Gujarat Fire Prevention and Life Safety Measures Act, 2013: sections 21, 26 and 39 (opens in a new tab)
- LegitQuest (legal database): Uttar Pradesh Fire and Emergency Services Rules, 2024: Rule 44 validity, Rule 46 cancellation (opens in a new tab)
- CaseMine (legal database): Delhi Fire Service Act, 2007: sections 31, 37, 44 and 54 (opens in a new tab)
- LegitQuest (legal database): Uttar Pradesh Fire and Emergency Services Act, 2022: sections 33, 36, 39 and 58 (opens in a new tab)
- CaseMine (legal database): Karnataka Fire Force Act, 1964: sections 24 and 25 (opens in a new tab)
- WBXPress (legal database): Fire NOC fees, West Bengal Fire and Emergency Services (2020 notification) (opens in a new tab)
- IndiaFilings (compliance guide): Odisha fire licence: thresholds, fees and timelines (opens in a new tab)
- The Arunachal Times: Fire and Emergency Services operationalise single window clearance system (7 May 2026) (opens in a new tab)
- Taxheal: A&N Islands Fire and Emergency Service Regulation, 2026: penalties (opens in a new tab)
- TeamLease RegTech: Tamil Nadu Fire and Rescue Services (Amendment) Act, 2026 (Act No. 16 of 2026) (opens in a new tab)