Fire NOC for a hotel: the line in each state, the systems, fees and steps

Updated By Flamekite Editorial DeskFacts checked against official sources on

Quick answer

A hotel needs a fire NOC above 12 m or 4 storeys in Delhi, from 9 m or 500 m² on a floor in Rajasthan, and at any size in Goa. Uttar Pradesh, Sikkim and Rajasthan renew a hotel's certificate every year; Delhi, Bihar and Manipur every 3 years. NBC 2016 puts hotels up to four-star in Group A-5 and five-star hotels in A-6.

The star rating adds its own fire paper. The Ministry of Tourism's 2018 guidelines make a current fire NOC a document for star classification, shown in original at the inspection, and call smoke detectors, fire alarms, lit exit signs and fire drills necessary at every tier from 1-star to 5-star deluxe.

Delhi line for hotels
12 m or 4 storeys
Mezzanine and stilt floors count
11 cases
Term of a UP hotel certificate
1 year
Rule 44 of the 2024 Rules
Renewal by state
Underground tank for a 5-star hotel
2,50,000 litres
NBC 2016 and Maharashtra alike
Systems grid
Ministry of Tourism star classification term
5 years
Fire NOC shown in original at inspection
The guidelines

Fire NOC for a hotel at a glance: 10 facts

What the codes, state rules and the Ministry of Tourism say about hotels, each with its source.
WhatThe ruleSource
Code classA-5 hotels up to four-star; A-6 starred hotels of five-star and above (NBC 2016, clause 3.1.2)BIS, NBC 2016 Part 4
Code class from 2026A-IV hotels up to four-star; A-V starred hotels (NBCS 2026 Part F, voluntary)BIS, SP 7:2026
Delhi lineOver 12 m, or 4 or more storeys counting mezzanine and stilt floors (Rule 27(3), 26 May 2026)DFS
Rajasthan lineHotels of 9 m or more, or over 500 m² on any floor (UDH joint order, 14 September 2023)Rajasthan UDH
Uttar Pradesh term1 year for hotels, against 5 years for homes and 3 for other buildings (Rule 44, 2024 Rules)UP Rules 2024
Sikkim term1 year for hotels (rule 30, 2025 Rules); tourism registration also runs 1 yearSikkim F&ES Rules 2025
Fire Safety OfficerUP and Bihar from 100 rooms, Jharkhand from 50 rooms; NBC 2016 asks for a Fire Officer in every starred hotelBIS, NBC 2016 Part 4
Star classificationFire NOC uploaded current and valid, and shown in original to the HRACC inspection team (Ministry of Tourism, 19 January 2018)Ministry of Tourism
Kitchen under FSSAIA chimney sized to the kitchen before trading starts; Schedule 4 has no fire clauseFSSAI
Last verified25 October 2026, against each instrument named on this pageNot stated

Hotel fire NOC lines in 24 states and UTs, from the instruments

When a hotel needs the fire certificate, how long it lasts, and the instrument that says so. Where the instrument is silent, the cell says so.
OptionWhen a hotel is coveredTerm or renewalInstrumentSource
DelhiOver 12 m, or 4 or more storeys counting mezzanine and stilt floors3 years until 20 May 2027; then valid until cancelled with a yearly Form KDFS Rules 2010, Rule 27(3) as substituted on 26 May 2026DFS
Uttar PradeshRule 42 gives hotels no exemption; Form A-14 makes them moderate risk at 12 m, 4 floors, 3 stars or 25 rooms1 year (Rule 44)UP Fire and Emergency Services Rules, 2024UP Rules 2024
Rajasthan9 m or more, or over 500 m² on any floor; every rooftop restaurantGenerally every year, on the feeUDH joint order of 14 September 2023, Table 1Rajasthan UDH
SikkimHotels are outside rule 28's exemptions; Tourism's Form II asks for a fire NOC1 year (rule 30)Sikkim Fire and Emergency Services Rules, 2025Sikkim F&ES Rules 2025
PuducherryLarge hotels are Category A; "large" is not definedEvery year for large hotels; 3 years for Category BG.O.Ms.No.61, 10 September 2025Puducherry G.O. 61
GoaAny hotel, restaurant or bakery; 3 and 4-star hotels are DFES service 1095 years since 2025Section 13 notification of 17 December 2014; RTS gazette of 3 November 2022DFES Goa charter
KeralaResidential and lodging groups over 1,000 m² or over 15 m (KMBR rule 5(4))5 years for non-hazardous buildingsKMBR as amended in 2025; fee G.O.(Ms)No.272/2024KMBR amendment 2025
Chhattisgarh12 m, 500 m² built-up, 3 stars, or a 500 m² hall on any floor2 years: every hotel is moderate riskSection 14(1) notification of 29 November 2022; HQ order of 16 October 2025Home Department, Chhattisgarh
Odisha12 m and above, 500 m² built-up, or 3 stars and above2 years; a Deputy Fire Officer signs for 3 stars and aboveAmendment of 6 March 2019; Order 50908 of 2019Order 50908 of 2019
BiharA hotel with a floor over 500 m², or any building of 15 m3 years for hotels and restaurantsBihar Fire Services Rules 2021, rule 15Bihar Rules 2021
Himachal PradeshMore than 12 m, or ground plus 3 upper storeys, mezzanine includedNot set in the ActSection 9 notification of 23 July 2019, item 4HP Home notification
ManipurMore than 12 m, or ground plus 3 upper storeys, mezzanine included3 years, hotels included (section 25(2))Act 9 of 2026, in force 14 September 2026Government of Manipur
NagalandMore than 12 m; the ground plus 3 words carry no "or"2 yearsAct 5 of 2023, section 21(1)Directorate of Fire and Emergency Services, Nagaland
AssamHotels are listed at any size; under 15 m, more than 15 rooms is moderate riskValid until cancelledAct LIII of 2025, section 20(1) and Schedule IAssam Act LIII of 2025
Arunachal PradeshMore than 500 m² on any floor, or above 4 storeys or 15 mEvery year for hotels (bye-law 11.3)Arunachal Pradesh Building Bye-Laws, 2019AP Building Bye-Laws 2019
HaryanaMore than 500 m² on any one floor, at any height3 yearsHaryana Fire and Emergency Service Act 2022, section 18(2)Haryana Gazette
GujaratBelow 5 stars: under 15 m with a floor over 500 m², then by height; every 5-star hotel and resort3 years, then 2 years for each renewalFire Regulations 2023, Third Schedule; Amendment Rules 2024Gujarat Fire Safety Compliance Portal
UttarakhandPlan permission above 12 m and above 500 m² (both)3 years: hotels are carved out of the 5-year classAct of 2016 as amended in 2022, section 18; notification of 2021Uttarakhand Home notification
Andhra PradeshNot read for this page beyond the renewal table2 years for hotels below 18 mG.O.Ms.No.218 of 2023G.O.Ms.No.218
TelanganaHotels sit in risk class R3, medium; the hotel height line is not legible in the circular's textRenewal 5 years; random inspection twice in 5 yearsCircular Rc.No.4039-2/EODB/2015, 5 March 2016TSDRFS circular 2016
West BengalHotels are among the 19 occupancies of 2003; a non-star hotel up to 15.5 m and 500 m² self-certifies yearly3 yearsNotification 279 of 2003; notification 1930 of 2024WB notification 1930
Jammu and KashmirHotels below 4 stars (C3) and 4 and 5-star hotels (C4) are in the fire NOC list; a running hotel files a Final Registration NOCNot publishedUnified Building Bye-Laws 2021, clause 2.18(2)J&K Gazette
LakshadweepHotels and resorts named with no size line; the Rules add tourist stays of 30 rooms5 years under rule 12Regulation 3 of 2026, s.29(2); Rules 2026, rule 11(2)Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026
MeghalayaOver 500 m² covered in planning areas; any hotel in Shillong and adjoining areas3 years since July 2025Bye-Laws 2021, A2.59; notification HPL.127/2023/43 of 2024HPL.127/2023/43

How to get a fire NOC for a hotel: 9 steps

  1. Settle the class: A-5 or A-6

    A hotel up to four-star is A-5 and a five-star hotel A-6. The star category also moves state lines: 3 stars bring a hotel in at any height in Odisha, Chhattisgarh and UP.

  2. Measure height, floors, floor area and rooms the state's way

    Delhi counts mezzanine and stilt floors as storeys, UP counts basements, Rajasthan tests 500 m² on any one floor, and UP and Assam count rooms.

  3. Plan the systems for the largest floor

    Table 7 changes at 300 m² and 1,000 m² a floor under NBC 2016, and at 500 m² and 1,000 m² in Maharashtra. Draw the tanks, pumps and risers on the plans before sanction.

  4. Take the plan-stage NOC with the building permit

    Most states issue a provisional NOC on the plans. For a star project, the Ministry of Tourism also wants the fire fighting measures and hydrants on the plans it approves.

  5. Install, test and keep the installer's certificates

    UP asks for a qualified agency's certificate for every hotel, since Rule 42 gives hotels no exemption, plus an electrical safety audit report.

  6. Apply for the final NOC with the occupancy floor by floor

    Upload the plans, ownership papers, completion documents and the room and hall layout. In UP the hotel route runs through the fire portal linked to Nivesh Mitra.

  7. Appoint the Fire Safety Officer if your size calls for one

    UP and Bihar from 100 rooms, Jharkhand from 50 rooms, UP also from 4 stars; Gujarat wants a Specialist-grade officer for a 5-star hotel.

  8. Use the NOC for the trade, liquor and tourism papers

    Goa and Sikkim tourism registration and the Ministry of Tourism's star classification all ask for the fire NOC; keep the original for the inspection.

  9. Diary the renewal and the half-yearly filings

    UP renews a hotel every year and Rajasthan generally every year; UP also wants Form A-8 every January and July. The renewal date calculator works out your last day.

Where a hotel sits in the fire codes: A-5, A-6 and the star line

The codes split hotels at the fifth star. The class decides the systems, and some states read the star rating as a line of its own.

A-5, NBC 2016
Hotels: a building or group of buildings under one management giving sleeping accommodation, with or without dining, for hotels classified up to four-star. BIS, NBC 2016 Part 4
A-6, NBC 2016
Starred hotels: those approved by the concerned authorities as five-star and above. Table 7 gives them one row at every height. BIS, NBC 2016 Part 4
A-IV and A-V, NBCS 2026
The 2026 standard's names for hotels up to four-star and starred hotels. Its Table 7A puts a hotel of 3 or 4 stars in the 24 to 60 m band's protection level at any height. The standard is voluntary. BIS, SP 7:2026
Special building, NBC 2016 clause 1.2
A hotel with more than 500 m² on any one floor falls under Part 4 whatever its height; Haryana, Bihar and Arunachal write the same 500 m² test into law. BIS, NBC 2016 Part 4
C3 and C4, Jammu and Kashmir
The bye-laws' groups for hotels other than 4 and 5-star (C3), and for 4 and 5-star hotels and banquet halls (C4); both are in the fire NOC list. J&K Gazette
Group B and Group C, West Bengal fees
Hotels up to 3 stars pay the Group B rate and hotels above 3 stars the Group C rate for a Fire Safety Recommendation. WBFES
R3, Telangana
"Medium Residential (Hotel)" in the 2016 risk table: the fire service inspects at random twice in 5 years. TSDRFS circular 2016

Hotel fire systems by floor area and height: NBC 2016 against Maharashtra

Both tables require extinguishers and first-aid hose reels in every hotel. They part company below 15 m, where NBC 2016 steps up at 300 m² a floor and Maharashtra at 500 m². Read off the page images of both.

RiserYard hydrantSprinklersAlarm and detectionUnderground tankTerrace tankPumps
NBC A-5, below 15 m, no floor over 300 m² BIS, NBC 2016 Part 4NoneNoBasement over 200 m² onlyManual alarmNone5,000 litres, 5,000 more with a large basement450 litres a minute at the terrace
NBC A-5, below 15 m, a floor of 300 m² to 1,000 m² BIS, NBC 2016 Part 4Wet riser above ground plus 1NoBasement over 200 m² onlyManual alarm and automatic detection10,000 litres per 500 m² of floor, at least 50,00010,000 litresA 1,620 litre a minute set with the wet riser; 450 at the terrace
NBC A-5, below 15 m, a floor over 1,000 m² BIS, NBC 2016 Part 4Wet riser above 1 storeyYesRequiredManual alarm with talk-back and public address, and automatic detection1,00,000 litres10,000 litresA 1,620 litre a minute set
NBC A-5, 15 m to 30 m BIS, NBC 2016 Part 4Wet riserYesRequiredManual and automatic1,50,000 litres20,000 litresTwo electric and one diesel at 2,280 litres a minute
NBC A-5, above 30 m BIS, NBC 2016 Part 4Wet riserYesRequiredManual and automatic2,00,000 litres20,000 litresTwo electric and one diesel at 2,280 litres a minute
NBC A-6, five-star, any height BIS, NBC 2016 Part 4Wet riserYesRequiredManual and automatic2,50,000 litres20,000 litresTwo electric and one diesel at 2,850 litres a minute
Maharashtra A-5, below 15 m, no floor over 500 m² MH Act 2023 Schedule-INoneNoBasement over 200 m² onlyManual alarmNone5,000 litres, 5,000 more with a large basement450 litres a minute at the terrace
Maharashtra A-5, below 15 m, a floor of 500 m² to 1,000 m² MH Act 2023 Schedule-IDown-comerNoBasement over 200 m² onlyManual alarm and automatic detectionNone20,000 litres, 5,000 more with a large basement450 litres a minute at the terrace
Maharashtra A-5, below 15 m, a floor over 1,000 m² MH Act 2023 Schedule-IWet riserYesRequiredManual and automatic1,00,000 litres10,000 litresOne electric and one diesel at 2,280 litres a minute
Maharashtra A-5, 15 m to 30 m MH Act 2023 Schedule-IWet riserYesRequiredManual and automatic1,50,000 litres20,000 litresOne electric and one diesel at 2,280 litres a minute
Maharashtra A-5, above 30 m MH Act 2023 Schedule-IWet riserYesRequiredManual and automatic2,00,000 litres20,000 litresTwo electric and one diesel at 2,280 litres a minute
Maharashtra A-6, five-star MH Act 2023 Schedule-IWet riserYesRequiredManual and automatic2,50,000 litres20,000 litresTwo electric and one diesel at 2,850 litres a minute

Each pump set also carries a 180 litre a minute jockey pump (two in the larger sets); NBC Note 22 asks one set per 100 hydrants, up to 2 sets. The 2026 standard (NBCS) uses protection levels instead of rows; it is voluntary. Maharashtra's lodging-house rows are on the guest house fire NOC page.

Hotel-only fire rules in the codes: 10 clauses beyond Table 7

Table 7 sets the plant. These clauses set what a hotel's rooms, doors, kitchens and staff must have, from NBC 2016, the 2026 standard and the Ministry of Tourism's checklist.

  • Panic bars on fire exit doors, fixed between 865 mm and 1,220 mm above the floor (NBC 2016, clause 6.1.1.4(a)) BIS, NBC 2016 Part 4
  • Guest rooms and suites protected by extended-throw, quick-response sprinklers, with audio-based detectors of at least 75 dB (clause 6.1.1.4(b)) BIS, NBC 2016 Part 4
  • No horizontal sliding doors across corridors (clause 6.1.1.4(c)) BIS, NBC 2016 Part 4
  • A qualified Fire Officer with at least 3 years' experience on the premises of every starred hotel, who keeps the equipment working, issues fire orders and trains occupants (clause 4.10) BIS, NBC 2016 Part 4
  • A talk-back and public address system with the manual alarm once a hotel below 15 m has a floor over 1,000 m² (Table 7, Note 1) BIS, NBC 2016 Part 4
  • Live cooking areas in hotels, on any fuel, separated by 120-minute fire-rated construction (NBCS 2026, clause 4.5.3.6) BIS, SP 7:2026
  • Hotel stairs at least 1.50 m wide, against 1.25 m for lodging houses and dormitories (NBCS 2026, clause 4.4.2) BIS, SP 7:2026
  • Smoke detectors in a star hotel, necessary at all 5 tiers from 1-star to 5-star deluxe and allowed to run on batteries (Ministry of Tourism, Annexure III) Ministry of Tourism
  • Fire and emergency alarms with visual and audible signals, and fire exit signs on guest floors with backup power, necessary at every star tier Ministry of Tourism
  • Staff trained in fire fighting, periodic fire drills, and written manuals for disaster management, first aid and fire safety, at every star tier Ministry of Tourism

Does your hotel need a fire NOC? 11 cases

Find the first line that fits your building. Crossing any one test in your state is enough, and a star rating can be a test on its own.

  1. If Delhi, over 12 m, or 4 storeys counting mezzanine and stilt

    Yes: a DFS Fire Safety Certificate. Delhi's hotel line is 12 m or 4 storeys, against 15 m or 5 storeys for homes. Fire NOC Delhi DFS

  2. If Rajasthan, 9 m or more, or over 500 m² on any one floor

    Yes, under Table 1 of the 2023 order, with a yearly renewal; a restaurant on the roof needs its own NOC at any size. Fire NOC Rajasthan Rajasthan UDH

  3. If Uttar Pradesh, any hotel

    Rule 42 exempts small homes, schools and shops from the agency certificate but not hotels, and Rule 44 gives hotels a 1-year term. 3 stars or 25 rooms make it moderate risk at any height. Fire NOC UP UP Rules 2024

  4. If Odisha or Chhattisgarh, 3 stars, 12 m or 500 m²

    Yes. Any one of the three is enough; in Chhattisgarh every hotel then holds a 2-year moderate-risk certificate. Fire NOC Chhattisgarh Home Department, Chhattisgarh

  5. If Goa, any hotel

    Yes, at any size under the 2014 notification; and since 13 January 2026 Tourism will not register or renew a hotel without a valid DFES NOC. Fire NOC Goa Goa Tourism order

  6. If Sikkim, any hotel, lodge or resort

    Yes in practice: hotels are outside rule 28's exemptions, Tourism's Form II asks for a fire NOC, and the certificate runs 1 year. Fire NOC Sikkim Sikkim Tourist Trade Rules

  7. If Haryana, Bihar or Arunachal, a floor over 500 m²

    Yes, as a special building, at any height. Arunachal also renews hotel fire clearance every year. Fire NOC Haryana Haryana Gazette

  8. If Himachal, Manipur or Nagaland, more than 12 m

    Yes. Himachal and Manipur also catch ground plus 3 upper storeys; Nagaland's text has no "or" before it. Fire NOC Manipur 2026 Government of Manipur

  9. If A five-star hotel in Gujarat

    Yes, every one, whatever its size, with a Specialist-grade Fire Safety Officer to renew it. Fire NOC Gujarat Gujarat Fire Safety Compliance Portal

  10. If Kolkata or anywhere in West Bengal, a non-star hotel up to 15.5 m and 500 m²

    No full certificate: it self-certifies every year online under the 2024 notification. Above those limits it needs the full recommendation and certificate. Fire NOC West Bengal WB notification 1930

  11. If Below every line in your state

    No certificate, but the systems stay: a Maharashtra hotel below 15 m with no floor over 500 m² still needs hose reels, a manual alarm and a 450 litre a minute terrace pump. Do I need a fire NOC? MH Act 2023 Schedule-I

What the Ministry of Tourism asks of a hotel's fire NOC: the 2018 guidelines

Star classification is voluntary, but a hotel that applies for it puts its fire NOC in front of a central inspection team.

Word for word

ii. No Objection Certificate from the Fire Service Department (Local Fire Brigade Authority). [...] The approval of the Ministry of Tourism is no substitute for any statutory approval and the approval given is liable to be withdrawn without notice in case of any violations or misrepresentation of facts.

Ministry of Tourism, Guidelines for approval of hotel projects and star classification of operational hotels, No. 8-TI-I-1(3)/2013-PI-1 of 19 January 2018, Annexure II, paragraph 10 Ministry of Tourism

Paragraph 11 then lists the "NOC from Fire Department" among 13 papers the hotel shows in original at the HRACC inspection, current and valid. A classification lasts 5 years, and re-classification must be applied for, complete, 6 months before it runs out. At project stage the promoter files details of fire fighting measures and hydrants, and both stages carry a Rs 100 stamp-paper affidavit that the Fire approval was obtained, on pain of withdrawal and criminal proceedings.

Star classification and tourism registration: 7 regimes that check a hotel's fire paper

In these regimes the fire NOC is a document for the business, not only for the building. Here is what each one asks.

  • Central, 2018

    Ministry of Tourism star classification

    Fire NOC uploaded current and self-attested, and shown in original at inspection; fees from Rs 6,000 (1-star) to Rs 25,000 (5-star deluxe); classification valid 5 years. Ministry of Tourism

  • Since 13 January 2026

    Goa

    A valid DFES NOC for new registration and every renewal of a hotel with the Department of Tourism. Goa Tourism order

  • Rules 2025

    Sikkim

    Provisional registration of a hotel or resort under construction only after Fire Department clearance (rule 8); Form II asks for a NOC from Fire; registration renewed every year. Sikkim Tourist Trade Rules

  • Rules 2026

    Uttarakhand

    A residential tourism unit must be protected with fire safety equipment, one fire appliance per room (rule 4(7)); registration runs 5 years. The rules ask for no fire NOC as such. UTDB rules 2026

  • No fire paper listed

    Himachal Pradesh

    The tourism unit registration form lists plans and a Pollution Control Board NOC but no fire NOC; the 12 m line comes from the 2019 fire notification instead. HP Tourism forms

  • Single window

    Jammu and Kashmir

    A running hotel files a Final Registration NOC on the J&K Single Window, with the site plan, building plan and revenue record or rent deed. District Ganderbal

  • Shillong, 2024

    Meghalaya

    Every hotel, lodge, homestay and resort in Shillong and adjoining areas must hold a fire NOC, with no size line. HPL.127/2023/43

Hotel fire NOC fees in 13 official schedules

Hotels pay by floor area in most states that publish a rate, and some charge star hotels more. Each line is from an official schedule; where nothing is charged, the line says so.

As published

The Ministry of Tourism's classification fee (Rs 6,000 to Rs 25,000) is not a fire fee and is not counted here. Your portal's demand note decides the amount; consultants' charges are not fees. All state rates side by side are on the fire NOC fees page.

How often a hotel renews its fire certificate: 1 year to valid until cancelled

Most fire laws give hotels a shorter term than homes. Each stop is one state's rule for hotels.

  1. Uttar Pradesh: 1 year

    Rule 44 gives hotels 1 year from issue. Apply on Form A-11 at least 1 month before expiry, and file Form A-8 every January and July. UP Rules 2024

  2. Sikkim: 1 year

    Rule 30 gives 5 years to homes other than hotels, 3 years to other buildings, and 1 year to hotels; renew online on Form A-11 one month before expiry. Sikkim F&ES Rules 2025

  3. Rajasthan and Arunachal: every year

    Rajasthan issues the NOC on the fee generally every year and wants the renewal filed 15 days before expiry; Arunachal's bye-law 11.3 renews hotels yearly. Rajasthan UDH

  4. Puducherry: every year for large hotels

    Category A hotels renew every year; other Category B buildings every 3 years. Puducherry G.O. 61

  5. Odisha, Chhattisgarh, Nagaland and Andhra Pradesh: 2 years

    Odisha's hotel certificate runs 2 years at every star level; Andhra Pradesh renews hotels below 18 m for 2 years. Order 50908 of 2019

  6. Delhi, Bihar, Manipur, Uttarakhand and Haryana: 3 years

    Delhi treats hotels as non-residential for the 3-year term until 20 May 2027, then moves to a certificate valid until cancelled with a yearly Form K. DFS

  7. Goa and Kerala: 5 years; Assam: until cancelled

    Goa's NOC lasts 5 years under the 2025 notification; Kerala's non-hazardous term is 5 years; Assam's 2025 Act keeps a certificate valid until cancelled. Government of Goa, Official Gazette Series II No. 14, 3 July 2025

Hotel fire NOCs in numbers

The lines and counts a hotel owner meets most often, each from its source.

  • 12 m

    Hotel line in Delhi, Himachal, Manipur, Nagaland, Odisha and Chhattisgarh DFS

  • 9 m

    Hotel line in Rajasthan, or over 500 m² on any floor Rajasthan UDH

  • 25 rooms

    Make a UP hotel moderate risk at any height UP Rules 2024

  • 100 rooms

    Need a Fire Safety Officer in UP and Bihar; Jharkhand starts at 50 Bihar Act 6 of 2014

  • 2,50,000 litres

    Underground fire tank for a five-star (A-6) hotel BIS, NBC 2016 Part 4

  • 291

    Fire NOCs issued to Goa hotels in 2025, against 168 in 2023 (figures tabled in the Assembly, as reported) The Goannews report

  • 80

    Patna hotels of 241 audited found compliant (reported June 2026) Patna Pressnews report

Hotel fire NOC worked cases: 8 buildings

Each case applies one state's instrument to a described hotel. They are Flamekite's worked examples, not decisions of any fire service.

  1. Case 1

    A 30-room hotel in Karol Bagh, Delhi, 11.5 m

    Ground, mezzanine and 3 upper floors.

    What applies Under 12 m but 5 storeys counting the mezzanine, so over Rule 27(3)'s 4-storey test: a DFS certificate for 3 years. DFS

  2. Case 2

    A 20-room hotel in Varanasi, 9 m, 3 floors

    No star rating, no hall.

    What applies Below Form A-14's moderate-risk lines, but Rule 42 still gives a hotel no exemption from the agency certificate, and Rule 44's 1-year term applies. UP Rules 2024

  3. Case 3

    A 10 m hotel in Jaipur with 450 m² floors

    Nagar Nigam area, 1,800 m² gross, about 19,375 sq ft.

    What applies Covered at 9 m. At Rs 2 per sq ft the fee is about Rs 38,750, renewed generally every year. Rajasthan UDH

  4. Case 4

    A 3-star hotel in Puri, 9 m

    Rooms and a restaurant on 3 floors.

    What applies Covered by its star rating alone; a Deputy Fire Officer issues the certificate for 2 years. Order 50908 of 2019

  5. Case 5

    A 14 m hotel in Pune with 800 m² floors

    Recorded as a hotel (A-5), no basement.

    What applies Maharashtra's 500 m² to 1,000 m² row: a down-comer, manual alarm, automatic detection and a 20,000 litre terrace tank with a 450 litre a minute pump. Under NBC 2016 the same floors would need a wet riser and an underground tank of at least 50,000 litres. MH Act 2023 Schedule-I

  6. Case 6

    A 5-star resort in Ahmedabad

    Ground plus 4, 12,000 m².

    What applies Every 5-star hotel is covered; at Rs 50 per m² the fee is Rs 6,00,000, and only a Specialist-grade Fire Safety Officer may sign for it. Gujarat Fire Safety Compliance Portal

  7. Case 7

    A 2-star hotel in Kochi seeking classification

    1,600 m², 13 m.

    What applies Over Kerala's 1,000 m² line: Rs 40 per m² makes Rs 64,000. The Ministry of Tourism's HRACC team then sees the original NOC at inspection. Kerala Fire and Rescue Services

  8. Case 8

    A 25-room hotel in Gangtok

    Registering with Tourism.

    What applies Form II asks for a NOC from Fire; the fire certificate runs 1 year under rule 30, and the tourism registration is also renewed every year. Sikkim F&ES Rules 2025

What a hotel risks without a valid fire certificate: 9 penalties

Penalties come from the fire Acts and rules; the tourism and classification penalties are separate. Each line names the law that sets it.

OffencePenaltyLaw
Breaching the fire safety chapter (Delhi)Up to 6 months or Rs 50,000 or both, and up to Rs 3,000 a dayDelhi Fire Service Act 2007, section 37 Caseminestudy
Letting fire systems lapse (Maharashtra)Rigorous imprisonment of 6 months to 3 years and a fine of Rs 20,000 to Rs 50,000Maharashtra Act 2006, section 36(1) MFS Act 2006 copy
No fire NOC, or equipment missing (Rajasthan)Rs 5,000 on the owner or user; another Rs 5,000 for a late renewalRajasthan Municipalities Act 2009, section 291, applied by the 2023 order Rajasthan UDH
Violations left unremedied (Uttar Pradesh)Reported to the licensing authority to cancel the hotel's licence; then sealingUP Rules 2024, rules 46 and 47 UP Rules 2024
Running without fire systems or a certificate (Chhattisgarh)No hotel licence issued or renewed; the fire service may seek its cancellation at onceChhattisgarh Rules 2021, rule 35; Act section 33 CG Gazette
No Fire Safety Officer for a hotel of 50 rooms (Jharkhand)Rs 10 to Rs 50 per m² a monthJharkhand Act 2024, section 31 Government of Jharkhand
Breaking the fire law (Assam)Fines from Rs 10,000 to Rs 5 lakhAssam Act LIII of 2025 Assam Act LIII of 2025
Running a tourism unit unregistered (Uttarakhand)Rs 10,000, then Rs 1,000 a dayTourism and Travel Business Registration Rules 2026, rule 14 UTDB rules 2026
A false star-classification claimDeclassified and debarred for 2 years; a one-time revocation costs Rs 25,000 (1-star) to Rs 3 lakh (5-star)Ministry of Tourism guidelines 2018, Note 4 Ministry of Tourism

Every state's penalty ladder is on the fire NOC penalties page.

Where hotels fail a fire inspection, and the fix: 7 cases

These are the failures the instruments and the post-fire reports point to for hotels.

  • If Carpets and wooden wall cladding in corridors and stairs

    Strip them from escape routes. Delhi's fire department report on the 2019 Karol Bagh hotel fire said carpets and wooden wall covering fuelled the flames, as reported. The Quintnews report

  • If A certificate left to lapse

    Diary the renewal. Kolkata's Rituraj hotel, where 14 died in April 2025, had a fire licence pending renewal since 2022, its Fire DG said. ETV Bharatnews report

  • If Sizing the systems for the average floor

    Use the largest floor. Table 7 tests floor area on any floor, so one 1,100 m² banquet floor moves the whole hotel to the over-1,000 m² row. BIS, NBC 2016 Part 4

  • If Sliding doors across a corridor

    Replace them with side-hung doors; NBC 2016 clause 6.1.1.4(c) bars horizontal sliding doors across corridors in A-5 hotels. BIS, NBC 2016 Part 4

  • If Upgrading to 5 stars without upgrading the plant

    A-6 needs a 2,50,000 litre underground tank and 2,850 litre a minute pumps, and a Fire Officer on the premises. Plan the plant before the classification. BIS, NBC 2016 Part 4

  • If An expired NOC at the star inspection

    Renew first. The Ministry of Tourism wants the fire NOC current and valid, in original, when HRACC inspects. Ministry of Tourism

  • If Missing the half-yearly filing in UP

    File Form A-8 every January and July; a hotel's 1-year certificate does not replace it. UP Rules 2024

Hotel kitchens, rooftops and banquet halls: 6 dos and 5 don'ts

Most hotel fire rules outside the rooms land on three places: the kitchen, the roof and the hall. Each line is from an instrument.

Do

  • Separate a live cooking area with 120-minute fire-rated construction (NBCS 2026, clause 4.5.3.6). BIS, SP 7:2026
  • In a high-rise hotel, fit thermal detectors in large kitchen hoods that trip the exhaust fan and shut off gas (NBC 2016, clause 4.7.2). BIS, NBC 2016 Part 4
  • Fit a chimney sized to the kitchen before trading starts: FSSAI's catering schedule asks for it, for smoke, not for fire. FSSAI
  • Take a separate fire NOC for a rooftop restaurant in Rajasthan, whatever its size. Rajasthan UDH
  • Count a hall in UP: one of 2,000 sq ft or 300 persons makes the hotel moderate risk. UP Rules 2024
  • Treat a 500 m² hall on any floor as a line of its own in Chhattisgarh and Odisha. Home Department, Chhattisgarh

Don’t

  • Don't read an FSSAI licence as fire clearance: Schedule 4 has no fire extinguisher, suppression or NOC clause. FSSAI
  • Don't put LPG inside a high-rise hotel except in a kitchen on the ground floor at the building's edge (Arunachal bye-law 11.27). AP Building Bye-Laws 2019
  • Don't add a terrace restaurant to a Rajasthan hotel over 25% of the roof or above 4 m. Rajasthan UDH
  • Don't rely on the plain extinguisher rule for a kitchen in a centrally air-conditioned starred hotel: NBC Annex G asks for a kitchen suppression system there. BIS, NBC 2016 Part 4
  • Don't let a banquet floor push the hotel over 1,000 m² a floor without the wet riser, yard hydrant and sprinklers that row needs. BIS, NBC 2016 Part 4

Hotel fire NOC myths, checked against the rules

5 claims repeated online, and what the instruments say.

  • You may have read

    NBC puts hotels in Group A-4.

    Myth

    What the sources say

    A-4 is apartment houses. NBC 2016 puts hotels up to four-star in A-5 and five-star hotels in A-6. BIS, NBC 2016 Part 4

  • You may have read

    A hotel needs a fire NOC only above 15 m.

    Myth

    What the sources say

    Delhi's line is 12 m or 4 storeys, Rajasthan's 9 m or 500 m² on a floor, and Goa covers hotels at any size. Rajasthan UDH

  • You may have read

    A hotel fire NOC lasts 5 years everywhere.

    Myth

    What the sources say

    UP and Sikkim give hotels 1 year, Rajasthan renews generally every year, and Delhi gives 3 years, against 5 for homes. UP Rules 2024

  • You may have read

    Star classification replaces the fire NOC.

    Myth

    What the sources say

    The Ministry of Tourism says its approval is no substitute for any statutory approval, and asks for the fire NOC itself. Ministry of Tourism

  • You may have read

    The FSSAI licence covers kitchen fire safety.

    Myth

    What the sources say

    Schedule 4 asks for a chimney and smoke outlets, for hygiene. The kitchen's fire rules come from the fire law and codes. FSSAI

Hotel fire rules and orders, dated: 2016 to 2026

The instruments that set or changed a hotel's fire duties, and the court order after Rajkot, in order.

  1. 5 March 2016

    Telangana places hotels in risk class R3, with random inspection twice in 5 years. TSDRFS circular 2016

  2. 19 January 2018

    The Ministry of Tourism's revised guidelines make a current fire NOC a document for star classification. Ministry of Tourism

  3. 6 March 2019

    Odisha covers hotels at 12 m, 500 m² or 3 stars. Odisha Rules 2019

  4. 23 July 2019

    Himachal lists hotels above 12 m or ground plus 3. HP Home notification

  5. 14 September 2023

    Rajasthan's UDH order sets 9 m or 500 m² on a floor for hotels, and a yearly fee. Rajasthan UDH

  6. 18 January 2024

    UP's Rules give hotels a 1-year term and no Rule 42 exemption. UP Rules 2024

  7. 13 June 2024

    After the Rajkot game-zone fire, the Gujarat High Court orders a fact-finding committee on Rajkot's officers and fire checks of all schools; nothing in it is specific to hotels. Gujarat High Court

  8. 5 March 2025

    Sikkim's Tourist Trade Rules require Fire Department clearance for hotel registration. Sikkim Tourist Trade Rules

  9. 10 September 2025

    Puducherry puts large hotels in Category A with yearly renewal. Puducherry G.O. 61

  10. 13 January 2026

    Goa ties hotel registration and renewal to a DFES NOC. Goa Tourism order

  11. 26 May 2026

    Delhi's substituted Rule 27(3) covers hotels over 12 m or of 4 storeys. DFS

  12. 5 June 2026

    Uttarakhand's tourism rules ask for one fire appliance in each room of a residential unit. UTDB rules 2026

Hotel fires and the crackdowns after them: Karol Bagh 2019 to Patna 2026

From news reports, not yet an official source.

News reports only: Flamekite found no official order text for these steps on 25 October 2026. The rules in force are in the sections above and on each state page.

  • After 17 died at Hotel Arpit Palace, Karol Bagh, Delhi's Home Minister said 45 hotels had been inspected in two days and the fire safety certificates of 30 cancelled, with the municipal corporations and police asked to seal them. The Quintnews report

  • About 200 Delhi guest houses were reported inspected and about 150 certificates cancelled in the same drive. The Quintnews report

  • West Bengal's Fire DG said Kolkata's Rituraj hotel, where 14 died, had a fire licence pending renewal since 2022. ETV Bharatnews report

  • After the Malviya Nagar guest-house fire, Delhi's Chief Minister ordered a special fire safety audit of hotels, commercial establishments and public buildings. Deccan Chroniclenews report

  • Patna's fire service warned 161 hotels and 78 private hospitals of sealing; 80 of 241 hotels audited a year earlier had been found compliant. Patna Pressnews report

Where a hotel applies: 4 official fire portals

Apply on the fire service's own portal or single window. These 4 are linked from official pages Flamekite read.

What Flamekite could not confirm about hotel fire NOCs

These 7 points are where a reader would expect an answer and no official source gave one on 25 October 2026.

  • How fire services read NBC 2016 clause 6.1.1.4(b), which says guest rooms are protected by quick-response sprinklers, against Table 7, which asks for sprinklers below 15 m only in a large basement until a floor passes 1,000 m².
  • What counts as a "large hotel" for Puducherry's yearly renewal: G.O.Ms.No.61 does not define it.
  • Which Kerala building rules group (A1 or A2) a hotel falls in for the 1,000 m² or 15 m line.
  • Telangana's hotel height line: the row in the 2016 circular's risk table is not legible in the text Flamekite read.
  • The text of any Delhi order behind the 30 hotel certificates cancelled after Karol Bagh in February 2019, and the outcome of the Delhi High Court petition that followed. Only news reports were found.
  • Whether the Ministry of Tourism has replaced its 2018 classification guidelines: the copy it served in 2025 is still the 2018 text.
  • NBC 2016 Table 7's pump and alarm notes for hotels were read from the PDF's text layer, not proof-read on the page image; the rows themselves were.

Questions about fire NOCs for hotels

Is a fire NOC mandatory for a hotel?

Above your state's hotel line, yes, and the line is usually lower than for homes: over 12 m or 4 storeys in Delhi, 9 m or 500 m² on a floor in Rajasthan, 12 m, 500 m² or 3 stars in Odisha and Chhattisgarh, and any size in Goa. Below it, the state's minimum systems still apply.

How do I get a fire NOC for a hotel?

Fix the class (A-5 or A-6), size the systems for the largest floor, take the plan-stage NOC with the building permit, install and test, then apply for the final NOC online with the completion papers and face the inspection. In UP a qualified agency's certificate is needed for every hotel.

How long is a hotel fire NOC valid?

1 year in UP and Sikkim, generally 1 year in Rajasthan, 2 years in Odisha and Chhattisgarh, 3 years in Delhi, Bihar and Manipur, and 5 years in Goa. Puducherry renews large hotels every year.

Is a fire NOC required for hotel star classification?

Yes. The Ministry of Tourism's 2018 guidelines ask for a fire NOC from the local fire service, uploaded current and valid and shown in original at the HRACC inspection, with a Rs 100 stamp-paper affidavit that fire approval was obtained.

Do hotel rooms need smoke detectors?

For star classification, yes: the Ministry of Tourism lists smoke detectors as necessary at every tier from 1-star to 5-star deluxe and allows battery-operated ones. NBC 2016 asks for audio-based detectors of at least 75 dB in A-5 guest rooms.

Which hotels need a Fire Safety Officer?

Hotels of 100 rooms in UP and Bihar, 50 rooms in Jharkhand, and 4 stars and above in UP. NBC 2016 wants a Fire Officer with 3 years' experience on the premises of every starred hotel.

What fire systems does a small hotel need?

Under NBC 2016, a hotel below 15 m with no floor over 300 m² needs extinguishers, hose reels, a manual alarm, a 5,000 litre terrace tank and a 450 litre a minute terrace pump. Maharashtra applies the same row up to 500 m² a floor.

Does the FSSAI licence cover fire safety in a hotel kitchen?

No. FSSAI's Schedule 4 asks for a chimney sized to the kitchen and smoke outlets for open-fire cooking, for hygiene. The kitchen's fire rules come from the fire law and the building codes.

Keep reading

Free tools for this

Words on this page, explained

Sources

Each source was opened and read on the date shown. How Flamekite checks its sources

  1. Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016, Part 4: Table 7 rows (d) hotels (A-5) and (e) hotels (A-6) with Notes 1 to 15, clause 4.10.1 (Fire Officer for starred hotels) and clause 6.1.1.4 (Subdivision A-5), read off the page images (opens in a new tab)checked 25 October 2026
  2. Government of Maharashtra (gazette copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023, substituted Schedule-I: rows (c) hotels (A-5) and (d) hotels (A-6), gazette pages 16 and 17 (read off the page images) (opens in a new tab)checked 25 October 2026
  3. Ministry of Tourism, Government of India: Revised guidelines for approval of hotels at project stage and star classification, No. 8-TI-I-1(3)/2013-PI-1 (opens in a new tab)checked 25 October 2026
  4. Food Safety and Standards Authority of India: Compendium, Food Safety and Standards (Licensing and Registration of Food Businesses) Regulations, 2011, Version II: Schedule 4, Part II clause 5.3.1.4 and Part V (catering and food service), kitchen smoke outlets and chimneys (opens in a new tab)checked 25 October 2026
  5. Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016 (SP 7:2016), Part 4: Fire and Life Safety, clauses 1.2, 2.38 and 3.1 (opens in a new tab)checked 25 October 2026
  6. Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 National Building Construction Standards 2026, Part F: Fire and Life Safety (opens in a new tab)checked 25 October 2026
Show all 66 sourcesShow fewer
  1. Urban Development, Housing and Local Self Government Departments, Rajasthan: Joint order No. P.11(9)UDH/2020 Part, 14 September 2023, on the fire safety certificate and fire NOC (18-page Hindi scan) (opens in a new tab)checked 25 October 2026
  2. Uttar Pradesh Gazette Extraordinary, 18 January 2024 (copy hosted by UP Fire and Emergency Services): Uttar Pradesh Fire and Emergency Services Rules, 2024, Notification No. 181/VI-Pu-8-2024-801(1)-2023: rules 40 to 56, 65, 66 and 72, Schedules VI and VII, Forms A-4, A-8 and A-11 to A-13 (opens in a new tab)checked 25 October 2026
  3. Government of Sikkim, Sikkim Government Gazette Extraordinary No. 466, 17 December 2025: The Sikkim Fire and Emergency Services Rules, 2025: Home Department notification No. 99/Home/2025, 17 December 2025, under section 63 of Act 4 of 2023, with Schedules I to V and Forms A1 to A20 (opens in a new tab)checked 25 October 2026
  4. Delhi Fire Service (copy of Delhi Gazette Extraordinary, Part IV): Delhi Fire Service (Amendment) Rules, 2025, notification F.No. DFS/HQ/Misc/2025/01(E-259159)/237, gazetted 26 May 2026 (opens in a new tab)checked 25 October 2026
  5. Gazette of India (Bureau of Indian Standards notification): Gazette of India Extraordinary, Part III Sec 4, No. 299, 30 April 2026: SP 7:2026 established, SP 7:2016 withdrawn (Ref HQ-PUB013/1/2020-PUB-BIS (1529)) (opens in a new tab)checked 25 October 2026
  6. Jammu and Kashmir Official Gazette (Extraordinary), copy hosted by the Housing and Urban Development Department: J&K Official Gazette, Vol. 134, No. 39-4, 24 December 2021: the Jammu and Kashmir Unified Building Bye-Laws, 2021 (opens in a new tab)checked 24 October 2026
  7. West Bengal Fire and Emergency Services: Issuance of Fire Safety Recommendation: document requirement with drawing scales (opens in a new tab)checked 24 October 2026
  8. Telangana State Disaster Response and Fire Services Department: Circular Memorandum Rc.No.4039-2/EODB/2015, 5 March 2016: revision of the period of renewal of NOC, risk categories and random inspections (quotes section 13 of the Fire Service Act, 1999) (opens in a new tab)checked 25 October 2026
  9. Home Department, Chhattisgarh (on the CG Fire NOC portal): Notification under section 14(1), 29 November 2022: buildings that need a fire NOC (opens in a new tab)checked 24 October 2026
  10. Government of Goa, Official Gazette Series I No. 42 (Extraordinary), 16 January 2026 (copy hosted by the Department of Tourism): Department of Tourism order N5/3(865)/2025-26/DT/339, 13 January 2026: documents for registration and renewal of hotels, homestays, shacks, water sports and other tourist trades, with the corrigendum of 29 January 2026 (opens in a new tab)checked 25 October 2026
  11. Government of Sikkim, Sikkim Government Gazette Extraordinary No. 37, 5 March 2025: The Sikkim Registration of Tourist Trade Rules, 2025, Tourism and Civil Aviation Department notification No. 01/DoT&CAv, 4 March 2025, with Forms I to VII (opens in a new tab)checked 24 October 2026
  12. Haryana Government Gazette, hosted by the Revenue and Disaster Management Department: Haryana Government Gazette Extraordinary No. 65-2022/Ext., 8 April 2022: the Haryana Fire and Emergency Services Act, 2022 (Haryana Act No. 14 of 2022), Notification No. Leg. 14/2022 (opens in a new tab)checked 24 October 2026
  13. Government of Manipur (PRS copy): Manipur Fire and Emergency Service Act, 2026 (Act 9 of 2026) (opens in a new tab)checked 24 October 2026
  14. Gujarat Fire Safety Compliance Portal (GujFireSafety CoP): Gujarat Fire Prevention and Life Safety Measures Regulations, 2023 (fees in Annexure 8) (opens in a new tab)checked 25 October 2026
  15. Department of Fire and Emergency Services, Government of West Bengal: Notification 1930/FES/O/MISC-08/2023, 1 March 2024: 12 occupancies moved to yearly self-certification (with forwarding letter 1961 of 5 March 2024) (opens in a new tab)checked 25 October 2026
  16. Government of Uttarakhand, Culture, Tourism and Sports Section-1 (English translation hosted by Uttarakhand Tourism Development Board): Uttarakhand Tourism and Travel Business Registration Rules, 2026, notification No. 531 of 5 June 2026: fees, one fire appliance per room, homestay limits, 5 year registration, penalties (opens in a new tab)checked 24 October 2026
  17. Department of Tourism and Civil Aviation, Himachal Pradesh: Application forms and document lists for registration of tourism units, travel agents, guides, restaurants and adventure operators under the HP Tourism Development and Registration Act, 2002 (opens in a new tab)checked 24 October 2026
  18. District Administration Ganderbal, Government of Jammu and Kashmir: Fire & Emergency: Final Registration NOC for hotels, guest houses, restaurants and joinery mills, and Provisional Registration (updated 23 July 2022) (opens in a new tab)checked 24 October 2026
  19. Home (Police) Department, Government of Meghalaya: Notification No. HPL.127/2023/43 of 26 September 2024: compulsory fire NOC for hotels, lodges, homestays, resorts and business buildings in Shillong city and adjoining areas (opens in a new tab)checked 24 October 2026
  20. Kerala Fire and Rescue Services: Fee structure, G.O.(Ms)No.272/2024/Home (opens in a new tab)checked 24 October 2026
  21. Fire and Emergency Services, Meghalaya: Annexure B (with continuation sheets B1 and B2) to notification HPL.179/2017/85: fees per m² and annual renewal fees for every building category (opens in a new tab)checked 24 October 2026
  22. Fire and Emergency Services, Assam: Annexure A, proposed rates of fee for issuance of No Objection Certificate, renewal NOC etc. (5 image pages, read from the page images) (opens in a new tab)checked 24 October 2026
  23. Municipal Corporation Chandigarh, Fire and Rescue Services: Office Order No. 23 of 10 February 2025: Fire Safety Certificate charges by NBC occupancy group from 1 April 2025, validity 3 years, exemptions (read from the page images) (opens in a new tab)checked 25 October 2026
  24. Directorate of Fire and Emergency Services, Goa: Acts, Rules, Citizen's Charter and RTI: fee schedule of the Goa State Fire Force Rules, including stand-by appliances at Rs 2,000 a day (opens in a new tab)checked 24 October 2026
  25. Government of Telangana, Home (Ser.IV) Department: G.O.Ms.No.142, Home (Ser.IV), 9 August 2016: fire precaution fee amending the Levy of Fee Rules, 2006 (opens in a new tab)checked 24 October 2026
  26. Department of Fire and Emergency Services, DNH and DD (single window): SOP for the provisional fire NOC, 4 August 2025: Rs 10 per m² of total built-up area under the notification of 9 May 2016 (opens in a new tab)checked 24 October 2026
  27. Directorate of Local Government, Punjab (Wayback Machine copy of 21 March 2022 of the portal's fee download): Letter No. S4-DSMS-(Fire)-2021/41343 of 8 October 2021: new fees for online fire NOCs, by NBC zone, with provisional, renewal and 30-day rules (opens in a new tab)checked 25 October 2026
  28. Uttar Pradesh Fire and Emergency Services: Dashboard: provisional, final and renewal applications, approvals and days to certificate (printed 24 October 2026) (opens in a new tab)checked 24 October 2026
  29. Fire Service Department, Puducherry: Services: issue of fire NOC or licence, free (categories and validity are in G.O.Ms.No.61, source py-go61-scan) (opens in a new tab)checked 24 October 2026
  30. Government of Puducherry, Home Department (copy hosted by the Fire Service Department): G.O.Ms.No.61, 10 September 2025: Fire Safety Audit and Issue of NOC, Third Party Fire Safety Audit, Categories A, B and C, renewal, temporary licences, and Annexures I to V on licensed agencies and the Category C protocol (opens in a new tab)checked 25 October 2026
  31. Home Department, Government of Odisha: Order No. 50908 of 19 November 2019: procedure for issue and renewal of Fire Safety Certificates and Fire Safety Recommendations (issuing officer, validity, inspecting team and time limit by building type) (opens in a new tab)checked 25 October 2026
  32. Delhi Fire Service: Renewal of Fire Safety Certificate (FSC/NOC) (last updated 23/10/2026) (opens in a new tab)checked 25 October 2026
  33. Government of Goa, Official Gazette Series II No. 14, 3 July 2025: Home Department notification 3/14/2024-HD(G)/1652, 23 June 2025: 5-year fire NOC validity (opens in a new tab)checked 25 October 2026
  34. Uttar Pradesh Gazette Extraordinary, 18 January 2024 (copy hosted by UP Fire and Emergency Services): Uttar Pradesh Fire and Emergency Services Rules, 2024: Form A-14, risk category of occupancies (hotels, lodgings and guest houses), and Form A-15, Fire Safety Officer for hotels and guest houses of 100 rooms (gazette pages 132 and 133) (opens in a new tab)checked 25 October 2026
  35. Bihar Gazette Extraordinary, 27 March 2014 (copy hosted by Bihar Fire Service): Bihar Fire Service Act, 2014 (Bihar Act 6 of 2014): sections 1, 2, 20, 29 to 37, 44 and 49 to 57 (opens in a new tab)checked 24 October 2026
  36. Government of Maharashtra (gazette copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures Act, 2006, English gazette of 5 February 2007 (sections 3, 8, 36 to 38 read off the page images) (opens in a new tab)checked 25 October 2026
  37. Chhattisgarh Gazette Extraordinary No. 300, 18 August 2018 (on the CG Fire NOC portal): Chhattisgarh Fire and Emergency Service Act, 2018 (No. 19 of 2018), Hindi and English text: sections 1, 2, 14 to 20, 26, 28, 32 to 35, 41 and 47 to 58 (opens in a new tab)checked 24 October 2026
  38. Government of Jharkhand (PRS copy): Jharkhand Fire Service Act, 2024 (Act 9 of 2024) (opens in a new tab)checked 25 October 2026
  39. Assam Gazette Extraordinary No. 811, 24 December 2025 (PRS copy of the gazette): The Assam Fire and Emergency Services Act, 2025 (Assam Act No. LIII of 2025), notification No. LGL.52/2025/3: sections 1 to 67 and Schedule I (opens in a new tab)checked 25 October 2026
  40. Department of Town Planning and ULBs, Arunachal Pradesh (Gazette No. 347, 4 September 2019; copy on EoDB Arunachal): Arunachal Pradesh Building Bye-Laws, 2019 (notification No. DTP/BBL-03/2011-12/2592-601, 30 August 2019): definitions, bye-laws 2.9 to 2.17, chapter 11, Annexures C and D, and 13.5 (opens in a new tab)checked 24 October 2026
  41. Urban Development Department, Rajasthan: Model Rajasthan Building Regulations, 2025, order No. P-11(5)/UDH/Bhavan Viniyam-2025/2025 (listed 12 May 2025): Regs 2.36, 2.75, 2.77, 4.6.2, 5.4, 11.2, 14.5 and Schedules 2 and 3 (opens in a new tab)checked 25 October 2026
  42. Home Department, Government of Odisha: Odisha Fire Prevention and Fire Safety (Amendment) Rules, 2019, notification No. 10573/H of 6 March 2019: rule 9(1) classes, rules 10, 13(3) and 22(5) (opens in a new tab)checked 24 October 2026
  43. Government of Himachal Pradesh, Department of Home (copy hosted by the Department of Fire Services): Notification No. Home-F(A)3-1/2019-I, 23 July 2019, under section 9(1) of the HP Fire Fighting Services Act, 1984: 17 classes of premises and 20 fire precautions, English and Hindi texts (opens in a new tab)checked 25 October 2026
  44. High Court of Gujarat (order copy hosted by LiveLaw): R/WPPIL No. 34 of 2024 with WPPIL No. 118 of 2020, order of 13 June 2024 (Sunita Agarwal CJ and Pranav Trivedi J): Rajkot TRP game zone fire (opens in a new tab)checked 25 October 2026
  45. Delhi Fire Service: Department of Delhi Fire Service, Govt of NCT of Delhi (home page and portal links) (opens in a new tab)checked 25 October 2026
  46. Kerala Fire and Rescue Services: NOC portal home: live application counters, trial-run banner, A1 fire-plan notice and complaint address (opens in a new tab)checked 24 October 2026
  47. Directorate of Fire and Emergency Services, Goa: Citizen's Charter, December 2024: 17 fire stations, 3 zones, 1,106 posts, the section 13 notification 3/5/97-HD(G) Part/3934 of 17 December 2014 with Annexures I and II, the 2018 Annexure III on shacks and guest houses, and the 2009 fee rules (opens in a new tab)checked 25 October 2026
  48. Local Self Government Department, Government of Kerala (Kerala Gazette Extraordinary No. 3808): Kerala Municipality Building (Amendment) Rules, 2025 (G.O.(P) No.53/2025/LSGD, S.R.O. No.1240/2025, 29 October 2025) and Kerala Panchayat Building (Amendment) Rules, 2025 (G.O.(P) No.54/2025/LSGD): rule 5(4) restated, rules 35 and 36 (opens in a new tab)checked 25 October 2026
  49. Government of Bihar, Home Department notification (English copy hosted by Bihar Fire Service): Bihar Fire Service Rules, 2021: rules 14 to 27, 33, 34 and 38, Schedules C (fees), D (online NOC), E (pandals) and H (existing buildings) (opens in a new tab)checked 25 October 2026
  50. Directorate of Fire and Emergency Services, Nagaland: Nagaland Fire and Emergency Services Act (Act No. 5 of 2023), Nagaland Gazette, 31 August 2023 (opens in a new tab)checked 24 October 2026
  51. Government of Uttarakhand, Home Section-4 (copy hosted by Uttarakhand Fire and Emergency Services): Notification No. 342/XX-3/2021-2(39)/2006 of November 2021 under section 26 of the 2016 Act: 5 year validity for residential buildings except hotels, 3 years for other buildings, six-monthly self-declaration, fresh certificate on change of use (opens in a new tab)checked 24 October 2026
  52. Government of Andhra Pradesh, Home (Prisons and Fire) Department (copy hosted by AP Fire Services): G.O.Ms.No.218, 22 December 2023: periodicity of renewal of No Objection Certificates for non-residential and residential buildings (opens in a new tab)checked 24 October 2026
  53. Lakshadweep Gazette Extraordinary Vol. LXII No. 42, 3 September 2026: Lakshadweep Fire and Emergency Services Rules, 2026 (Rule 12: 5-year fire safety certificate) (opens in a new tab)checked 24 October 2026
  54. Casemine (secondary copy of the Act text): Delhi Fire Service Act, 2007: sections 29, 31, 37, 44, 49, 52 and 54 (opens in a new tab)Peer-reviewed study · checked 24 October 2026
  55. The Goan: Hundreds of shacks, hotels operate without fire NOCs (16 January 2026): fire NOC figures tabled in the Goa Assembly (opens in a new tab)News report · checked 24 October 2026
  56. Patna Press, 5 June 2026: Patna fire department warns 239 hotels and hospitals of sealing after June 15 (opens in a new tab)News report · checked 24 October 2026
  57. The Quint (PTI), 16 February 2019: Delhi Govt cancels NOC of 30 hotels after Karol Bagh fire: 45 hotels inspected in two days (opens in a new tab)News report · checked 25 October 2026
  58. ETV Bharat: Rituraj hotel fire, Kolkata (30 April 2025): Fire DG says the hotel's fire licence had been pending renewal since 2022; toll reported as 14, later 15 (opens in a new tab)News report · checked 24 October 2026
  59. The Quint (IANS), 27 February 2019: Over 150 Delhi guest houses shut for violating fire safety norms (opens in a new tab)News report · checked 25 October 2026
  60. Deccan Chronicle: Delhi orders fire safety audit after guesthouse tragedy (June 2026) (opens in a new tab)News report · checked 24 October 2026