Skip to content
Flamekite
ContactFree fire NOC check

Fire NOC 34 min read

Fire NOC for an apartment building: state lines, the builder's and the residents' duties, and fees

Updated By Flamekite Editorial DeskFacts checked against official sources on

Quick answer

An apartment building needs a fire NOC once it crosses your state's line: flats from 9 m and over 250 m² in Rajasthan, more than 8 flats in West Bengal, 15 m in most states, 16.5 m in Haryana, 21 m in Karnataka and, since 7 October 2026, 24 m for residential apartments in Telangana. The codes class flats as A-4 (NBC 2016) or A-III (NBCS 2026).

The builder takes the provisional and final NOC before the occupancy certificate; after handover the owners maintain the systems and file the state's periodic certificate, such as Maharashtra's Form B every January and July. The RERA Act makes the promoter list fire fighting facilities when registering and hand the plans to the association within 30 days of the occupancy certificate where no local law sets a time.

Telangana apartment line
24 m
Fresh files from 7 October 2026; 18 m before
36-state table
Rajasthan line for flats
9 m
And over 250 m², 2023 order Table 1
36-state table
Plans to the association
30 days
After the occupancy certificate, RERA s.17(2), absent local law
The handover
Karnataka residential fee
Rs 35 per m²
Minimum Rs 2,50,000
Fee lines

Fire NOC for an apartment building at a glance: 10 facts

How the fire codes, state laws and the RERA Act treat a block of flats, each fact with the instrument behind it. Last verified 25 October 2026.
WhatThe ruleSource
Occupancy in NBC 2016A-4 Apartment houses: living quarters for 3 or more families living independently, each with its own cooking, which takes in apartments, mansions and chawlsBIS, NBC 2016 Part 4
Occupancy in NBCS 2026A-III Apartment houses; NBC 2016 was withdrawn on 30 April 2026 and NBCS 2026 is voluntary, and only Assam had written it into its fire law by 24 October 2026Assam Act XIII of 2026
Lowest apartment linesRajasthan flats from 9 m and over 250 m²; Tripura above 10 m or 500 m²; Uttarakhand 12 mRajasthan UDH
Lines that count flatsWest Bengal: housing complexes of more than 8 flats; Assam: apartment buildings of 10 units or moreWest Bengal Fire and Emergency Services
Highest apartment line24 m and above for residential apartments in Telangana, for fresh Provisional NOC files from 7 October 2026TGFD circular 3455
Who appliesThe builder or promoter: Maharashtra's Act counts a builder who sells flats as an owner (s.2(11))MFS Act 2006 copy
Before the occupancy certificateHaryana bars any occupation certificate until the Fire Safety Certificate issues (s.19(5) of the 2022 Act)Government of Haryana
After handoverBihar rule 22(g) holds the builder answerable at handover; rule 22(h) makes the owners, occupants or their association maintain the systemsBihar Rules 2021
RERA disclosureSection 4(2)(e): the registration lists proposed facilities "including fire fighting facilities" and emergency evacuation servicesRERA Act 2016
RERA registration lineProjects over 500 m² of land or more than 8 apartments, all phases together (s.3(2)(a))RERA Act 2016

Apartment fire NOC lines in 36 states and UTs: height, flats or area

When a block of flats crosses each state's fire NOC line, in the instrument's words where it names apartments, flats or group housing, lowest line first. "More than" excludes the figure, "or more" includes it. Checked 25 October 2026.
OptionWhen an apartment block is caughtTerm or filing after handoverInstrumentSource
RajasthanFlats from 9 m and over 250 m² (Table 1); any building taller than 15 m needs the permanent NOC before the occupancy certificateGenerally yearly; renewal Rs 10,000, Rs 7,500 or Rs 5,000 by the size of the urban bodyUDH order of 14 September 2023; Model Building Regulations 2025 as amended on 29 May 2026Rajasthan UDH
TripuraHomes above 10 m or above 500 m² take the full Recommendation and certificate route; smaller ones self-certifyNot found by FlamekiteFire Safety Rules 2026, rules 6 and 7Directorate of Fire and Emergency Services, Tripura
West BengalHousing complexes of more than 8 flats at any height; any building 14.5 m or moreStand-alone KMC blocks up to 15.5 m and 500 m² self-certify on Form-1 every yearNotification 279 of 8 July 2003; Act 1950, s.2(ha)West Bengal Fire and Emergency Services
AssamApartment buildings of 10 units or more; under 15 m, more than 20 units is moderate riskCertificate valid until cancelledAct LIII of 2025, s.20(1) and Schedule IAssam Act LIII of 2025
Uttarakhand12 m or more (s.15(4))5 years; a self-declaration every 6 months; a fire safety officer at 500 flatsAct of 2016 as amended by Act 06 of 2022Uttarakhand Gazette 2022
Madhya PradeshFire drawings above 12.5 m; Fire Authority clearance above 30 m or 10 storeysNot found by Flamekite; Act 16 of 2026 has no start dateBhumi Vikas Rules 2012, rules 42 and 87MP Town Planning
Bihar15 m or more, or any floor above 500 m²5 years, renewed on Form M 45 days ahead; the association maintains the systems (r.22(h))Fire Service Rules 2021, rules 15 and 22Bihar Rules 2021
Jharkhand15.0 m and above, or more than 500 m² on any floorRenewal every yearBuilding Bye-laws 2016, clause 7.5RMC BPAMS
GujaratFlats 15 m and aboveFirst certificate 3 years, then 2 years through a Fire Safety Officer; Form B-15 every 6 monthsFire Regulations 2023, Third Schedule, Table 1Gujarat Fire Safety Compliance Portal
OdishaHomes 15 m and above5 years; above 30 m the audit needs a rule 9(15)(a) auditorFire Safety Rules 2017, rule 9(1); Order 50908 of 2019Order 50908 of 2019
Uttar PradeshMore than 15 m; apartment houses apply through Nivesh Mitra5 years; Form A-8 every January and July; a Fire Safety Officer at 45 m and aboveAct 16 of 2022, s.26(3); Rules 2024UP Rules 2024
GoaMore than 15 m (14.2 m is only a fee class)Not found by FlamekiteSection 13 notification of 17 December 2014DFES Goa charter
SikkimOver 15 m from the plinth; rule 28 exempts homes only below 15 m5 years for residential buildings other than hotelsAct 4 of 2023, s.24(3); Rules 2025Sikkim F&ES Rules 2025
KeralaOver 15 m, or over 1,000 m² of built-up area at any heightA fire fighting preparedness fee each year; Rs 6,000 for flats above 35 mMunicipality Building Rules 2019, rule 5(4)KMBR 2019
Himachal PradeshAbove 15 m, on the building plans (s.15-A)Not found by FlamekiteFire Fighting Services Act 1984, s.15-ADepartment of Fire Services, Himachal Pradesh
MeghalayaExceeding 15 mThe occupancy certificate waits for fire clearance; no renewal fee listed for A4Building Bye-Laws 2021Bye-Laws 2021
LadakhFire safety design above 15 m in Leh and Kargil municipal limitsNot found by FlamekiteUnified Building Bye Laws 2024Ladakh Gazette
DelhiOver 15 m or 5 storeys; a stilt floor counts as a storey5 years until 20 May 2027, then a Form K declaration every yearDFS Rules 2010, Rule 27 as amendedDFS
ManipurMore than 15 m or ground plus 45 yearsAct 9 of 2026, s.21(5)Government of Manipur
NagalandMore than 15 m or ground plus 4The owners' association files maintenance certificates every January and JulyAct 5 of 2023, s.21(1)Directorate of Fire and Emergency Services, Nagaland
ChhattisgarhAbove 15 m or ground plus 4Apartments above 15 m are moderate risk, 2-year certificates; flats up to 15 m low risk, 3 yearsSection 14(1) notification of 2022; validity order of 2025Fire and Emergency Services and SDRF, Chhattisgarh
Arunachal PradeshApartments above ground plus 4 (or 15 m) and over 500 m²; group housing of 15 m and above is high riskNot found by FlamekiteBuilding Bye-Laws 2019, bye-law 11.1 and Table 13.3AP Building Bye-Laws 2019
Jammu and KashmirGroup housing, flats and high-rise apartments (R3) at any height; 15 m, or 17.5 m with stilts, is sanctioned in 2 stagesNot found by FlamekiteUnified Building Bye-Laws 2021, clause 2.18(2), amended 1 December 2025J&K Gazette
Dadra and Nagar Haveli and Daman and DiuAbove 15 m, or apartments over 500 m² of all floors added togetherNot found by FlamekiteRegulation 6 of 2026, s.29(2)Gazette of India Extraordinary
LakshadweepOver 15 m, or apartments over 500 m²Not found by FlamekiteRegulation 3 of 2026, s.29(2)Lakshadweep Gazette
Andaman and Nicobar IslandsOver 15 m, or apartments over 500 m², once the Regulation starts; not in today's 9 clearance classesA 5-year certificate under the RegulationRegulation 5 of 2026, s.26 (start date not notified)Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026
PunjabNo height line published; the fee letter names apartments and independent floors up to 15 mNot found by FlamekiteFee letter 41343 of 8 October 2021; Act 12 of 2024Local Govt Punjab
HaryanaAbove 16.5 m (homes up to 16.5 m are left out); 2 basements or one over 500 m²First certificate 5 years, then 3; a yearly self-declarationAct 14 of 2022, ss.18 and 19Government of Haryana
ChandigarhAbove 16.5 m; 2 basements or one over 500 m²5 years; a licensed agency's certificate every July (s.19(6))Haryana Act 2022 as extended by S.O. 2264(E) of 6 May 2026Gazette of India
PuducherryApartments above 17 m (Category A); lower blocks are placed in no categoryA NOC every 3 years; audit certificates from 2 licensed agenciesG.O.Ms.No.61 (Home), 10 September 2025Puducherry G.O. 61
Tamil NaduOver 18.3 m: the Director's NOC before planning permission; up to 18.3 m the District OfficerA fire licence; a 2022 licence ran 1 yearFire Service Act 1985; TNCDBR 2019, rule 39(11)TNCDBR 2019
Karnataka21 m or more, any occupancy; Seva Sindhu still lists above 15 mNo renewal published; a Clearance Certificate after installation, at no chargeFire Force Act, s.13(3) as amended in 2023Government of Karnataka
TelanganaResidential apartments 24 m and above, fresh Provisional files from 7 October 2026 (18 m before)A third-party audit certificate each January above 30 m; January and July at 45 mCircular Rc.No.3455/MSB/2026; circular of 28 January 2020TGFD circular 3455
Andhra Pradesh24 m or more, stilt floor included; apartments are left out of the 500 m² floor clause by name; 2 basements or one over 500 m²First occupancy NOC 1 year, then 3 years for residential of 18 m and aboveFire Service Act 1999, s.13(1) as amended in 2026; G.O.Ms.No.218Andhra Pradesh Legislative Assembly
Mizoram15 m and above under the 2019 rule; 24 m once the amendment signed on 20 August 2026 is gazetted (date not found); in Aizawl a building permit above 15 m needs a fire NOCNot found by FlamekiteRule 57(1), 2019; substitution signed 20 August 2026Mizoram Home Dept
MaharashtraSchedule-I row (b), Apartment Houses (A-4), sets installations from below 15 m; homes over 70 m are section 45 buildingsNo routine renewal: Form B every January and July; above 70 m a licensed audit every 2 yearsAct of 2006, Schedule-I substituted in 2023MH Act 2023 Schedule-I

An apartment project's fire NOC from plan to handover in 7 steps

  1. Class the building and test it against the state line

    Record it as A-4 (NBC 2016) or A-III (NBCS 2026) and measure it the way your state does: Delhi counts the stilt as a storey, Andhra Pradesh counts it in the 24 m, Assam and West Bengal count flats.

  2. Take the plan-stage fire approval

    Telangana's Provisional NOC comes before plan approval; Maharashtra's Provisional approval comes at plan stage; Bihar asks a 15% bank guarantee on the fire-system estimate, held 5 years.

  3. Disclose the fire facilities to RERA

    Register the project with its development plan, which must list the fire fighting facilities and emergency evacuation services, and keep the approvals list on the RERA page current every quarter.

  4. Install through a licensed agency

    Fit the systems the height band asks for: in Maharashtra extinguishers, a hose reel and a 5,000 litre terrace tank even below 15 m; a down-comer from 15 m; a wet riser above 35 m.

  5. Get the final NOC before the occupancy certificate

    Haryana will not issue an occupation certificate without the Fire Safety Certificate; Rajasthan wants the permanent NOC first; Mumbai asks for PWD lift certificates at 24 m and above.

  6. Hand the fire papers to the association

    Under RERA section 17(2), the documents and plans go to the association as local law sets, or within 30 days of the occupancy certificate where it sets none.

  7. Diary the owners' periodic filing

    Form B each January and July in Maharashtra, Form A-8 in Uttar Pradesh, the January audit upload in Telangana above 30 m, the 5-year renewal in Delhi until 20 May 2027.

Apartment, flat and group housing: the words in the codes and Acts

Which word your state uses decides which row a fire officer reads. These 9 terms come from the 2 codes, 4 state instruments and the RERA Act.

A-4 Apartment houses (NBC 2016)
Living quarters for 3 or more families living independently of each other, each with independent cooking; apartments, mansions and chawls are the code's examples. BIS, NBC 2016 Part 4
A-III Apartment houses (NBCS 2026)
The same class under the 2026 standard, which also drops the 2016 subdivision for one or two-family homes. BIS, SP 7:2026
Apartment Houses (A-4), Maharashtra
Row (b) of Schedule-I as substituted in 2023, shared with dormitories (A-3), in 5 height bands. MH Act 2023 Schedule-I
Owner (Maharashtra, s.2(11))
Includes a registered co-operative housing society and a builder, developer or promoter who constructs flats for sale under the 1963 Ownership Flats Act or the 1970 Apartment Ownership Act. MFS Act 2006 copy
Occupier (Maharashtra, s.2(10)(e))
Includes a member of a co-operative housing society or an apartment owner. MFS Act 2006 copy
R3 (Jammu and Kashmir)
Group housing, flats and high-rise apartments, and multi-level parking: a use class in the fire NOC list at any height. J&K H&UDD
Residential apartment buildings (Telangana)
The only row circular Rc.No.3455/MSB/2026 moved to 24 m; lodging houses and other residential uses keep their lines. TGFD circular 3455
Association of allottees (RERA)
The association, society or co-operative of buyers the promoter must enable under section 11(4)(e); absent local law, formed within 3 months of a majority of allottees booking. RERA Act 2016
Real estate project (RERA, s.2(zn))
The building of apartments, or the conversion of a building into apartments, for sale, including the common areas and development works. RERA Act 2016

RERA section 4(2)(e): fire fighting facilities in every registered apartment project

The RERA Act does not issue a fire NOC, but it makes the promoter put the fire facilities on record at registration, where buyers can read them.

Word for word

(e) the plan of development works to be executed in the proposed project and the proposed facilities to be provided thereof including fire fighting facilities, drinking water facilities, emergency evacuation services, use of renewable energy;

Section 4(2)(e), The Real Estate (Regulation and Development) Act, 2016 (No. 16 of 2016), Gazette of India Extraordinary, 26 March 2016 RERA Act 2016

Clause (c) of the same sub-section asks for an authenticated copy of the approvals and commencement certificate from the competent authority, phase by phase, and clause (d) for the sanctioned plan and specifications. After registration, section 11(1)(d) makes the promoter post on the Authority's website, every quarter, "the list of approvals taken and the approvals which are pending subsequent to commencement certificate". A final fire NOC usually comes near completion, so a buyer should expect to see it on that list as pending until then. Registration is needed for projects over 500 m² of land or more than 8 apartments, all phases counted (section 3(2)(a)).

Handing an apartment's fire papers from builder to association: 8 stops

The RERA Act sets the order in which the promoter's fire duties pass to the buyers. Where a state's local law sets its own time, that time applies; the figures below are the Act's fall-backs.

  1. 1. Association formed

    The promoter enables an association or society of allottees; absent local law, within 3 months of a majority booking (s.11(4)(e)). Every allottee shall take part in forming it (s.19(9)). RERA Act 2016

  2. 2. Final fire NOC, then occupancy certificate

    The promoter obtains the completion or occupancy certificate and makes it available to allottees or the association (s.11(4)(b)). In Haryana the occupation certificate cannot issue before the Fire Safety Certificate. Government of Haryana

  3. 3. Essential services until takeover

    The promoter provides and maintains essential services, on reasonable charges, until the association takes over maintenance (s.11(4)(d)). RERA Act 2016

  4. 4. Possession within 2 months

    Every allottee takes physical possession within 2 months of the occupancy certificate (s.19(10)). RERA Act 2016

  5. 5. Conveyance within 3 months

    Absent local law, the conveyance deed and the common areas pass to the association within 3 months of the occupancy certificate (s.17(1)). RERA Act 2016

  6. 6. Documents and plans within 30 days

    Absent local law, the necessary documents and plans, including the common areas, go to the association within 30 days of the occupancy certificate (s.17(2)). Ask that the fire NOCs and system drawings are in the bundle. RERA Act 2016

  7. 7. Insurance papers

    On the association's formation, all documents of the title and construction insurance the promoter took go to the association (s.16(4)). RERA Act 2016

  8. 8. 5 years of defect liability

    A structural defect or a defect in workmanship, quality or provision of services reported within 5 years of possession is put right by the promoter within 30 days at no charge (s.14(3)). RERA Act 2016

Buying a flat: 12 fire checks before you pay

Each check rests on an official text a buyer can point to. None of them replaces the fire service's own record of the building.

  • The project's RERA registration number appears in the advertisement with the Authority's website (s.11(2)); projects over 500 m² or 8 flats must register. RERA Act 2016
  • The RERA page lists fire fighting facilities and emergency evacuation services in the development plan (s.4(2)(e)). RERA Act 2016
  • The quarterly approvals list shows the fire NOC as taken or pending (s.11(1)(d)), and the sanctioned plans are on display at booking (s.11(3)(a)). RERA Act 2016
  • The building's height and flat count against your state's row in the table above: 24 m in Telangana, 21 m in Karnataka, more than 8 flats in West Bengal. TGFD circular 3455
  • In Uttar Pradesh, the NOC ID returns the certificate on upfireservice.gov.in/upfire/nocverify. UP Verify NOC
  • In Kerala, the NOC's application number checks out on the Verify NOC page. Kerala Verify NOC
  • In Gujarat, the building appears on the Valid Certificate search by region and name. Gujarat Valid Certificate
  • In Telangana, the certificate's QR code scans: HYDRAA advised this after 56 fake NOCs surfaced in 2026. The Siasat Dailynews report
  • A ready flat has an occupancy certificate, which section 11(4)(b) makes the promoter obtain and share. RERA Act 2016
  • In Maharashtra, the society can show its last Form B, filed every January and July; there is no routine renewal to ask for. MFS circular 64
  • In a Mumbai tower of 24 m or more, the Final approval file carried PWD lift certificates. Mumbai Fire Brigade
  • Defects found after possession go to the promoter in writing within 5 years (s.14(3)). RERA Act 2016

Where to verify an apartment's fire certificate online

Five official portals let anyone check an issued certificate on 25 October 2026. Elsewhere, ask the fire station named on the certificate.

NBCS 2026 protection levels for apartment buildings: area, height and 4 levels

NBCS 2026 Table 7A grades apartments (A-III) by floor area as well as height, unlike NBC 2016's height-only Table 7. Read off the standard's pages; NBCS 2026 binds only where a state adopts it.

LevelHose, risers and hydrantSprinklersDetection and PA
501 to 1,000 m², under 60 m BIS, SP 7:2026HL-2Extinguisher, first-aid hose reel and a down-comerNot in this levelNot in this level
1,001 m² and above, under 60 m BIS, SP 7:2026HL-3Wet riser and yard hydrant, no down-comerNot in this levelAutomatic detection and alarm, and public address
Above 60 m BIS, SP 7:2026CL-4Wet riser and yard hydrantRequiredAutomatic detection and alarm, and public address
NBC 2016 Table 7, for contrast NBC 2016, Part 4By height onlyDown-comer from 15 m, wet riser above 35 m, yard hydrant above 45 mNot in Flamekite's proof-read of the A-4 rowManual alarm from 15 m; automatic detection above 60 m

Up to 500 m² and 24 m, NBCS 2026 accepts self-certification by a certified, state-approved building professional. The apartment row groups towers of 24 m to 60 m with buildings under 24 m, then gives only area bands, so how a 30 m tower with 800 m² floors is classed is not stated. Maharashtra's own height bands for apartments are on the housing society fire audit page; the wet riser page explains the riser itself.

Fire lifts, refuge areas and wet risers in apartment towers: 8 rules

The 3 features buyers ask about most in a high-rise. NBCS 2026 defines them; the height that triggers each comes from the state's bye-laws or rules.

  • NBCS 2026, clause 2.27

    What a fireman's lift is

    A lift with all the features of a firefighting shaft, so fire crews reach floors fast; it also serves as the evacuation lift for people who need help, and runs to the basements. BIS, SP 7:2026

  • Arunachal Pradesh, bye-law 11.9

    Lifts from 15 m

    Buildings of 15 m and above get lifts; the fire lift is at least 1.4 m², carries 545 kg (8 persons) and reaches the top floor in 1 minute. AP Building Bye-Laws 2019

  • Goa, DFES checklist

    Fire tower and fire lift

    A fire tower above 8 storeys or 24 m, with a fire lift for 8 passengers alongside. Directorate of Fire and Emergency Services, Goa

  • Kerala, KMBR 2019

    Stretcher lift above 16 flats

    Apartment buildings of more than 16 units provide at least 2 staircases, one a fire escape stair, and a stretcher lift. KMBR 2019

  • Telangana, from 7 October 2026

    Fire tower at 24 m

    A fire tower and a Fire Command Centre room from 24 m, for every occupancy, under circular Rc.No.3455/MSB/2026. TGFD circular 3455

  • NBCS 2026, Annex D-4.2

    Refuge areas and balconies

    High-rise apartments whose flats have balconies need no refuge area. Without balconies: refuge spaces of at least 12 m² in the shaft lobby, or refuge areas above 24 m at about every 15 m. BIS, SP 7:2026

  • Rajasthan and Tripura

    Two state variants

    Rajasthan exempts a building where every unit has a terrace or balcony, otherwise 10% of the floor or 15 m²; Tripura still asks balconied towers above 60 m for one at 60 m and every 30 m. Rajasthan UDH

  • Wet riser

    When the riser arrives

    NBC 2016 Table 7: a down-comer from 15 m and a wet riser above 35 m for apartments; NBCS 2026: a wet riser in apartments of 1,001 m² and above. NBC 2016, Part 4

Does your apartment block need a fire NOC? 12 cases by city and state

Match your block to one line. Where a state does not name apartments, the line is Flamekite's reading of its residential row.

  1. If A residential apartment block in Hyderabad, fresh Provisional file after 7 October 2026

    Only at 24 m and above. A 21 m block filed on 15 October 2026 needs no Provisional fire NOC, fire tower or FCC room; a commercial block of the same height still needs one above 15 m. Fire NOC Telangana TGFD circular 3455

  2. If An apartment block in Bengaluru between 15 m and 21 m

    The Act's line is 21 m, but Seva Sindhu still lists above 15 m. Ask KSFES in writing before plan sanction. Fire NOC Karnataka Government of Karnataka

  3. If An apartment block in Delhi over 15 m or 5 storeys

    Rule 27's residential row. A stilt plus 4 floors is already 5 storeys. The certificate renews every 5 years until 20 May 2027. Fire NOC Delhi DFS

  4. If A tower in Noida over 15 m

    A Fire Safety Certificate through Nivesh Mitra, valid 5 years; Form A-8 every January and July; a Fire Safety Officer at 45 m. Fire NOC UP UP Rules 2024

  5. If A group housing tower in Gurgaon above 16.5 m

    Fire scheme approval, then the certificate before the occupation certificate (s.19(5)); first term 5 years. Fire NOC Haryana Government of Haryana

  6. If A block of flats in Pune or Thane of any height

    Schedule-I row (b) applies from below 15 m, and the society files Form B every January and July. Fire Audit for Housing Society MH Act 2023 Schedule-I

  7. If Flats in Jaipur of 9 m or more and over 250 m²

    Table 1 of the 2023 order catches them, below 15 m; the fee is per sq ft of gross built-up area. Fire NOC Rajasthan Rajasthan UDH

  8. If A housing complex in Kolkata of more than 8 flats

    One of the 19 high-risk occupancies of the 2003 notification, at any height; it needs the full FSR and FSC unless it fits the 2024 self-certification limits. Fire NOC West Bengal West Bengal Fire and Emergency Services

  9. If An apartment building in Guwahati of 10 or more flats

    Covered by section 20(1); low risk up to 20 flats under 15 m, moderate above, high at 15 m. Fire NOC Assam 2026 Assam Act LIII of 2025

  10. If A flat block in Chennai over 18.3 m

    The Director's NOC before planning permission, then a compliance certificate and fire licence; up to 18.3 m the District Officer decides. Fire NOC Tamil Nadu TNCDBR 2019

  11. If A flat block in Kochi over 1,000 m², even under 15 m

    A Kerala fire NOC under rule 5(4); 300 to 1,000 m² up to 15 m files a self-declaration. Fire NOC Kerala KMBR 2019

  12. If A residential block in Vijayawada under 24 m with no large basement

    Section 13(1) does not list it on Flamekite's reading; the 2018 MA&UD circular still speaks of 18 m, so confirm in writing. Fire NOC Andhra Pradesh Andhra Pradesh Legislative Assembly

Apartment fire NOC fees in the official schedules

These 14 lines come from an Act, rule or order that names residential buildings or apartments. A consultant's or agency's quote is a private price.

As published

  • Karnataka, residential high-rise NOCRs 35 per m²Or Rs 2,50,000, whichever is higher; Clearance Certificate free Seva Sindhu
  • Telangana, fire precaution feeRs 10 per m²Of total built-up area, G.O.Ms.No.142 of 2016 G.O.Ms.No.142
  • Andhra Pradesh, high-rise apartmentsRs 10 per m²Of built-up area under G.O.Ms.No.273 of 2025 G.O.Ms.No.273
  • Gujarat, flats of 15 to 35 mRs 1,000 + Rs 10 per m² + Rs 1,000Plan approval, certificate and each renewal; Rs 20 per m² above 60 m Gujarat Fire Safety Compliance Portal
  • Kerala, flats (A4) up to 16 mRs 12 per m²Minimum Rs 20,000; Rs 25 per m² above 16 m Kerala Fire and Rescue Services
  • Kerala, preparedness fee for flats above 35 mRs 6,000 a year Kerala Fire and Rescue Services
  • Rajasthan, NOC by urban bodyRs 2, Rs 1.50 or Rs 1 per sq ftNagar Nigam, Parishad or Palika, on gross built-up area Rajasthan UDH
  • Bihar, residentialRs 2 per m² provisionalRs 1 per m² final and at each 5-year renewal BFS fee PDF
  • Odisha, homes of 15 m and aboveRs 1 per m² a stageRecommendation, certificate and each renewal Order 50908 of 2019
  • Meghalaya, apartment houses (A4)Rs 4 per m²No renewal fee listed for apartments Meghalaya F&ES
  • Assam, apartment houses under 15 mRs 200 to Rs 1,000 a stageRs 400 to Rs 1,200 at 15 m and above, by area Assam fee Annexure A
  • Punjab, apartments up to 15 m, plot under 1 acreRs 20,00030 m and above Rs 30,000 plus 50% per extra acre, up to Rs 2 lakh Local Govt Punjab
  • Chandigarh, apartment houses (A-4)ExemptMC Office Order No. 23 of 10 February 2025 MCC Office Order 23
  • Tamil Nadu and Uttar PradeshNo fee collectedTNSWP procedure sheets; UP portal fee Nil TN Single Window

Delhi's rules in force publish no certificate fee; a Rs 1,000 fee comes with Form K from 20 May 2027. Every state's schedule is compared on the fire NOC fees page.

Penalties for an apartment block without fire compliance

Some Acts punish the missing certificate, others the lapsed system, and one Bihar rule fines a whole building. These are the amounts the instruments set.

OffencePenaltyLaw
A multi-storeyed building without the required fire arrangements, BiharA collective fine on the owners and occupants of double the provisional NOC fee for its categoryRule 22(j), Fire Service Rules 2021 Bihar Rules 2021
Breaking the multistorey chapter, BiharUp to 6 months or Rs 50,000 or both, and up to Rs 3,000 a daySection 37, Fire Service Act 2014 Bihar Act 6 of 2014
Letting fire systems fall out of repair, MaharashtraRigorous imprisonment of 6 months to 3 years and a fine of Rs 20,000 to Rs 50,000Section 36(1), Act of 2006 MFS Act 2006 copy
A high-risk building without a certificate, AssamRs 1 lakh to Rs 5 lakh; Rs 10,000 to Rs 25,000 for low risk, Rs 25,000 to Rs 50,000 for moderateSection 26, Act LIII of 2025 Assam Act LIII of 2025
Breach of the fire Act, Gujarat1 month to 2 years, or Rs 10,000 to Rs 1 lakh, or both; up to Rs 3,000 a daySection 39(1), Act of 2013 Gujarat Gazette
No NOC or missing equipment, RajasthanRs 5,000 under section 291 of the Municipalities ActUDH order of 14 September 2023 Rajasthan UDH
Applying for the occupation certificate before the fire certificate, HaryanaThe occupation certificate is barred; breaches carry up to 3 months or Rs 10,000, plus Rs 1,000 a daySections 19(5) and 30, Act 14 of 2022 Government of Haryana
A fire certificate breach, ChandigarhA penalty up to Rs 1 lakh from the Chief Fire Officer, doubled for a repeatS.O. 2264(E) of 6 May 2026 Gazette of India

In Maharashtra section 38 can reach the committee members and secretary of a society; the housing society fire audit page sets that out. Every state's penalties are on the penalties page.

Where apartment blocks fail on fire safety, and the fix

Most apartment failures happen at the seam between builder and residents. These 7 come from the instruments and from reported cases.

  • If Flats handed over before the final NOC

    Bihar rule 22(g) holds the builder answerable at handover; insist on the occupancy certificate the promoter must obtain under RERA s.11(4)(b). Bihar Rules 2021

  • If The association thinks the fire papers are still the builder's job

    After handover the owners or their association maintain the systems (Bihar r.22(h)); in Maharashtra the society is the owner under s.2(11). Bihar Rules 2021

  • If The refuge area fitted out as a gym or store

    Maharashtra's 2026 Form B covering letter declares that refuge areas are not misused; NBCS 2026 keeps them free of combustible storage and equipment. MFS Form B guidelines

  • If No talk-back or public address in a 24 m Maharashtra tower

    Note 1 of Schedule-I asks for them in apartments from 24 m. MH Act 2023 Schedule-I

  • If Reading Telangana's 24 m line onto a commercial podium

    The circular moves residential apartments only and says "No change for other occupancy types". TGFD circular 3455

  • If A NOC printout nobody has checked

    Verify it on the state's portal or scan its QR code; Hyderabad found 56 fake NOCs in 2026, as reported. The Siasat Dailynews report

  • If The Kerala preparedness fee left unpaid on a 40 m tower

    Flats above 35 m pay Rs 6,000 a year to keep the certificate alive. Kerala Fire and Rescue Services

Apartment association fire duties: 6 dos and 4 don'ts

Once the builder leaves, the residents' body is the fire service's contact. These 10 duties come from the state instruments; Maharashtra's society procedure is on the housing society page.

Do

  • In Maharashtra, file Form B from a licensed agency every January and July. MFS Act 2006 copy
  • In Telangana, upload a third-party auditor's certificate every January above 30 m, and every January and July at 45 m. TG fire circular 2020
  • In Uttar Pradesh, file the Form A-8 declaration every January and July, countersigned by the agency. UP Rules 2024
  • In Delhi, apply for renewal on Form I 6 months before the 5-year certificate ends. DFS
  • In Nagaland, file the maintenance certificates every January and July as the owners' association. Directorate of Fire and Emergency Services, Nagaland
  • Take over the builder's insurance papers when the association forms (RERA s.16(4)). RERA Act 2016

Don’t

  • Don't let anyone tamper with, alter or remove installed fire equipment, sprinkler heads in flats included (Maharashtra s.3(4)). MFS Act 2006 copy
  • Don't let members store combustible goods without the committee's written permission (Maharashtra model bye-law 47). MH model bye-laws 2014
  • Don't let a common staircase, landing or corridor be occupied; an encroacher pays 5 times the monthly maintenance for each month (bye-law 168(a)). MH model bye-laws 2014
  • Don't put gas lines through refuge areas or refuge floors (NBCS 2026, 4.7.8). BIS, SP 7:2026

Apartment fire NOC worked cases: 8 buildings

Flamekite's reading of the rules for 8 example blocks; the buildings are illustrations, the figures are the instruments'.

  1. Case 1

    A 45 m tower in Bengaluru, 15,000 m²

    Flats on 14 floors.

    What applies Over 21 m, so a KSFES NOC: 15,000 x Rs 35 = Rs 5,25,000, above the Rs 2,50,000 floor. A Clearance Certificate follows installation at no charge. Seva Sindhu

  2. Case 2

    A 50 m tower in Gachibowli

    Residential apartments, filed after 7 October 2026.

    What applies Over 24 m: Provisional and Occupancy NOCs, a fire tower and FCC room; after occupation, the third-party audit each January and July at 45 m. TGFD circular 3455

  3. Case 3

    A 12 m block of flats in Jaipur, 1,000 m²

    Inside a Nagar Nigam area.

    What applies Over 9 m and 250 m², so Table 1 catches it. 1,000 m² is 10,764 sq ft; at Rs 2 a sq ft the fee is about Rs 21,528, and renewal is generally yearly at Rs 10,000. Rajasthan UDH

  4. Case 4

    A 50 m tower in Noida

    Flats on 16 floors in Gautam Buddh Nagar.

    What applies Over 15 m: the certificate through Nivesh Mitra, valid 5 years, no portal fee; Form A-8 each January and July; a Fire Safety Officer at 45 m and above. UP Rules 2024

  5. Case 5

    A 12 m society building in Thane

    Ground plus 3, no basement.

    What applies Schedule-I row (b), below 15 m: extinguishers, a first-aid hose reel, a 5,000 litre terrace tank and a 450 l/min terrace pump; Form B each January and July. MH Act 2023 Schedule-I

  6. Case 6

    A 12 m block of 10 flats in Kolkata, 900 m²

    Stand-alone residential.

    What applies More than 8 flats and over the 500 m² self-certification cap, so the full FSR and FSC route. West Bengal Fire and Emergency Services

  7. Case 7

    A 12-flat block in Guwahati, 1,500 m², under 15 m

    Ground plus 3 with stilt parking.

    What applies 10 units or more, so covered; low risk at 12 flats. Rs 700 for the recommendation and Rs 700 for the certificate under the 1,000 to 2,000 m² line. Assam fee Annexure A

  8. Case 8

    A 40 m group housing tower in Gurgaon

    2 basements of parking.

    What applies Above 16.5 m: no occupation certificate before the Fire Safety Certificate; first term 5 years, then renewals every 3, with a yearly self-declaration. Government of Haryana

Apartment fire rules in numbers

Apartment fire rules, dated: 2003 to 2027

Thirteen dated steps that shaped what a block of flats owes today.

  1. 8 July 2003

    West Bengal's notification 279 lists housing complexes of more than 8 flats among 19 high-risk occupancies. West Bengal Fire and Emergency Services

  2. 25 March 2016

    The RERA Act receives assent: fire fighting facilities go into every registration (s.4(2)(e)). RERA Act 2016

  3. 28 January 2020

    Telangana's circular sets the January, and January and July, audit uploads by height and use. TG fire circular 2020

  4. 20 March 2021

    Bihar's Fire Service Rules put the builder on the hook at handover and the association after it. Bihar Rules 2021

  5. 30 May 2023

    Maharashtra's 2023 Amendment Act comes into force with a new Schedule-I and section 45 for homes over 70 m. UDD notification 2023

  6. 14 September 2023

    Rajasthan's order brings flats of 9 m and over 250 m² under the fire NOC. Rajasthan UDH

  7. 20 January 2026

    Telangana's G.O.Ms.No.15 empanels third-party fire and life safety auditors. G.O.Ms.No.15

  8. 30 April 2026

    NBC 2016 is withdrawn; NBCS 2026 keeps apartments as A-III. Gazette of India

  9. 6 May 2026

    Chandigarh moves to the Haryana Act: 5-year certificates and a July agency certificate. Gazette of India

  10. 26 May 2026

    Delhi's amended Rule 27 is gazetted, keeping homes over 15 m or 5 storeys. DFS

  11. 26 September 2026

    Telangana signs circular Rc.No.3455/MSB/2026 for residential apartments. TGFD circular 3455

  12. 7 October 2026

    Telangana's 24 m apartment line applies to fresh Provisional files. TGFD circular 3455

  13. 20 May 2027

    Delhi's Form K and valid-until-cancelled regime is due to start. Delhi Gazette

High-rise apartment fires and follow-ups reported, 2022 to 2026

From news reports, not yet an official source.

No fire service publishes a count of apartment buildings holding a fire NOC, and Flamekite found no published inquiry report on a high-rise apartment fire. These reports, all secondary, record what officials said or ordered.

  • Navbharat Live reports that only 489 institutions had filed Form B with Pune's fire department; the reporter counts about 25,000 housing societies in the city. Navbharat Livenews report

  • The Tribune reports Chandigarh housing societies telling the Administrator their renewals had been pending since the previous November; he ordered the backlog cleared. The Tribunenews report

  • PropNewsTime reports a fire directorate representative saying only about 20% of Maharashtra's 2 lakh residential complexes filed the July maintenance reports. PropNewsTimenews report

  • Pune's chief fire officer is reported saying only 10 to 15 percent of the city's housing societies had completed Form B. Pune Pulsenews report

  • The Tribune reports Gurugram's Deputy Commissioner ordering safety audits of all high-rises after a fire at an apartment complex in Sector 52, saying 30% of the city's high-rises lacked fire NOCs. The Tribunenews report

  • Scroll.in reports at least 6 dead and 15 injured in a fire in the 20-storey Kamala building in Tardeo, Mumbai; the Deputy Chief Minister said an investigation would be conducted. Scroll.innews report

Apartment fire NOC myths, checked against the rules

  • You may have read

    Telangana scrapped the fire NOC for every building under 24 m.

    Myth

    What the sources say

    Circular 3455 of 2026 moves residential apartments only; commercial buildings still need one above 15 m. TGFD circular 3455

  • You may have read

    Low-rise flats never need a fire NOC.

    Myth

    What the sources say

    West Bengal counts more than 8 flats, Assam 10 units, Rajasthan 9 m and 250 m², Tripura 10 m, at any of which a low block is caught. West Bengal Fire and Emergency Services

  • You may have read

    A RERA registration means the fire NOC is done.

    Myth

    What the sources say

    Registration needs the approvals then held; section 11(1)(d) makes the promoter post approvals taken and pending every quarter. RERA Act 2016

  • You may have read

    The fire NOC is the builder's problem for ever.

    Myth

    What the sources say

    Bihar rule 22(h) puts upkeep on the owners or their association after handover, and Maharashtra makes the society the owner. Bihar Rules 2021

  • You may have read

    Every high-rise apartment needs a refuge floor.

    Myth

    What the sources say

    NBCS 2026 exempts high-rise apartments whose flats have balconies; Tripura still asks for one above 60 m. BIS, SP 7:2026

  • You may have read

    NBC 2016 still decides a new tower's fire systems.

    Myth

    What the sources say

    It was withdrawn on 30 April 2026; NBCS 2026 is voluntary, and your state's Act and rules decide. Gazette of India

What Flamekite could not confirm about apartment fire NOCs

These 9 points were checked and left open on 25 October 2026. Where they matter to your building, ask the fire service in writing.

No state publishes how many apartment buildings hold a valid fire NOC, so no figure for compliance appears here beyond what officials told reporters.

  • NBCS 2026 Table 7A: how a 24 to 60 m apartment tower is graded when its area falls in a lower band, and whether the area is per floor or in all.
  • Karnataka: the Act's 21 m line against Seva Sindhu's "above 15 m" listing; KSFES has not published which governs a 15 to 21 m block.
  • Andhra Pradesh: whether the 2018 MA&UD circular's 18 m still applies to apartments now that section 13(1) uses 24 m.
  • Telangana: what a residential block of 18 m to 24 m approved before 7 October 2026 owes at renewal, and why the 2020 audit circular names no tier for apartments of 18 m to 30 m.
  • A height at which NBCS 2026 itself makes a fireman's lift compulsory in apartments: Flamekite read the definition, not a trigger.
  • State RERA rules and regulations that may require a fire NOC upload: only the central Act was read for this page.
  • Maharashtra model bye-law 75(c) ties the society's fire audit to a "State Fire Policy" that no instrument defines.
  • The outcome of the inquiry into the 22 January 2022 Tardeo fire: no published report was found.
  • A Press Information Bureau release of March 2026 on a Delhi residential fire returned HTTP 403 and was not read.

Questions about fire NOCs for apartments and flats

Is a fire NOC mandatory for an apartment?

Yes, once the block crosses your state's line. Most states use 15 m; Delhi over 15 m or 5 storeys, Haryana above 16.5 m, Karnataka 21 m and Telangana 24 m for residential apartments since 7 October 2026. Some count flats: more than 8 in West Bengal, 10 in Assam.

Who applies for the fire NOC of an apartment, the builder or the residents?

The builder or promoter takes the provisional and final NOC before the occupancy certificate. After handover the owners or their association maintain the systems and file the periodic certificate, as Bihar's rule 22(h) and Maharashtra's Form B make plain.

What is the fire NOC height for apartments in Hyderabad?

24 m and above, for fresh Provisional NOC applications received on or after 7 October 2026, under circular Rc.No.3455/MSB/2026. It was 18 m before. The change covers residential apartments only.

Does an apartment in Bangalore need a fire NOC?

At 21 m or more under section 13(3) of the Karnataka Fire Force Act as amended in 2023, though Seva Sindhu still lists above 15 m. The residential fee is Rs 35 per m² of built-up area, minimum Rs 2,50,000.

How can I check whether an apartment has a fire NOC?

Ask for the certificate number and check it on the state portal where one exists: Uttar Pradesh by NOC ID, Kerala by application number, Gujarat by building name, DNH and DD by barcode. Then read the project's RERA page, which lists approvals taken and pending every quarter.

Does RERA require the fire NOC?

The RERA Act asks the promoter to list fire fighting facilities and emergency evacuation services at registration (s.4(2)(e)), to post approvals taken and pending each quarter (s.11(1)(d)) and to obtain the occupancy certificate (s.11(4)(b)). The fire NOC itself comes from the state fire service.

Do apartments need a refuge area?

Under NBCS 2026, not if every flat has a balcony; otherwise refuge spaces in the shaft lobby or refuge areas above 24 m. Rajasthan exempts buildings where every unit has a terrace or balcony; Tripura still asks for one in towers above 60 m.

How often is an apartment fire NOC renewed?

It depends on the state: 5 years in Delhi until 20 May 2027, Uttar Pradesh, Bihar and Odisha; 3 years for apartments of 18 m and above in Andhra Pradesh; generally yearly in Rajasthan. Maharashtra has no routine renewal: Form B every January and July instead.

Keep reading

Words on this page, explained

Keep exploring

Sources

Each source was opened and read on the date shown. How Flamekite checks its sources

  1. Gazette of India Extraordinary, Part II Section 1, No. 17 of 26 March 2016 (scanned copy hosted by the Uttar Pradesh Real Estate Regulatory Authority): The Real Estate (Regulation and Development) Act, 2016 (No. 16 of 2016): sections 3(2), 4(2)(c) to (e), 11(1)(d), 11(4)(a) to (e), 14(3), 16(4), 17, 19(5), 19(9) and 19(10) (opens in a new tab)checked 25 October 2026
  2. Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 National Building Construction Standards 2026, Part F: Fire and Life Safety (opens in a new tab)checked 25 October 2026
  3. Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016 (SP 7:2016), Part 4: Fire and Life Safety, clauses 1.2, 2.38 and 3.1 (opens in a new tab)checked 25 October 2026
  4. Telangana Fire, Disaster Response, Emergency and Civil Defence Department: Circular Memorandum Rc.No.3455/MSB/2026, 26 September 2026: revised requirements for Fire NOCs in the context of G.O.Ms.No.95 (in force 7 October 2026) (opens in a new tab)checked 25 October 2026
  5. Director General, Telangana State Disaster Response and Fire Services: Circular Memorandum Rc.No.6402/MSB/2019, 28 January 2020: conducting of fire audit in all high-rise and non-high-rise buildings; third-party certificate uploaded every January, or every January and July, by height and use, with the 13-point certificate format (read from the page images) (opens in a new tab)checked 25 October 2026
  6. Government of Bihar, Home Department notification (English copy hosted by Bihar Fire Service): Bihar Fire Service Rules, 2021: rules 14 to 27, 33, 34 and 38, Schedules C (fees), D (online NOC), E (pandals) and H (existing buildings) (opens in a new tab)checked 25 October 2026
Show all 77 sourcesShow fewer
  1. Government of Maharashtra (gazette copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures Act, 2006, English gazette of 5 February 2007 (sections 3, 8, 36 to 38 read off the page images) (opens in a new tab)checked 25 October 2026
  2. Government of Haryana (PRS copy): Haryana Fire and Emergency Services Act, 2022 (Act 14 of 2022) (opens in a new tab)checked 25 October 2026
  3. Assam Gazette Extraordinary No. 427, 14 August 2026 (PRS copy of the gazette): The Assam Jan Vishwas (Amendment of Provisions) Act, 2026 (Assam Act No. XIII of 2026): Schedule item 4 amending sections 2, 20, 21 and 31 of the 2025 Act (opens in a new tab)checked 25 October 2026
  4. Gazette of India (Bureau of Indian Standards notification): Gazette of India Extraordinary, Part III Sec 4, No. 299, 30 April 2026: SP 7:2026 established, SP 7:2016 withdrawn (Ref HQ-PUB013/1/2020-PUB-BIS (1529)) (opens in a new tab)checked 25 October 2026
  5. Local Self Government Department, Government of Kerala (Kerala Gazette copies): Kerala Municipality Building Rules, 2019 (G.O.(P) No.77/2019/LSGD, S.R.O. No.828/2019, 8 November 2019) with the Amendment Rules, 2020 (G.O.(P) No.57/2020/LSGD, S.R.O. No.639/2020): rule 5(4) items 12 and 13, rules 28, 29, 35, 80 and 81, Appendix L (opens in a new tab)checked 25 October 2026
  6. Commissioner of Cooperation and Registrar of Co-operative Societies, Maharashtra (copy of the official file kept by the Internet Archive, 8 August 2025): Model Bye-laws of Co-operative Housing Society (Tenant Co-Partnership Housing Society), 2014: bye-laws 13, 14, 47, 75, 140, 154 to 159 and 168 on funds, fire audit, registers, repairs, insurance and the Emergency Planning Scheme (opens in a new tab)checked 25 October 2026
  7. Urban Development, Housing and Local Self Government Departments, Rajasthan: Joint order No. P.11(9)UDH/2020 Part, 14 September 2023, on the fire safety certificate and fire NOC (18-page Hindi scan) (opens in a new tab)checked 25 October 2026
  8. West Bengal Fire and Emergency Services: FAQ: fire safety certificate, 14.5 m line, compounding under section 38B (opens in a new tab)checked 24 October 2026
  9. Government of Maharashtra (gazette copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023, substituted Schedule-I: minimum fire fighting installations for apartment houses (A-4) by height, with Notes 1, 4, 6, 10, 11 and 15 (read off the page images, pp. 13 to 15 and 32 to 34) (opens in a new tab)checked 25 October 2026
  10. Housing and Urban Development Department, J&K (copy hosted by NITI for States): Jammu and Kashmir Unified Building Byelaws 2021 (February 2021): use classes, high-rise and tall buildings, fire access and Fire Consultant on Record (opens in a new tab)checked 25 October 2026
  11. Uttar Pradesh Fire and Emergency Services: Verify NOC by NOC ID, with the published objection and rejection points (opens in a new tab)checked 24 October 2026
  12. Kerala Fire and Rescue Services: Verify NOC: application number and captcha (with the payment-upgrade alert of October 2026) (opens in a new tab)checked 24 October 2026
  13. Gujarat State Fire Prevention Services: Valid Certificate search by region, application type and building name (opens in a new tab)checked 24 October 2026
  14. Director, Maharashtra Fire Service: Circular MFS/51/2025/64, 31 January 2025: Necessity or otherwise of renewal of fire approval (opens in a new tab)checked 25 October 2026
  15. Municipal Corporation of Greater Mumbai, Mumbai Fire Brigade: List of documents: occupation-stage fire NOC (opens in a new tab)checked 24 October 2026
  16. DNH and DD single window portal: Single window certificate verification by 9-digit barcode or certificate number (opens in a new tab)checked 24 October 2026
  17. Guidance Tamil Nadu (Tamil Nadu Single Window Portal): TNSWP home: TNFRS services, citizen registration, Verify Certificate, NSWS integration, toll-free helpline (opens in a new tab)checked 24 October 2026
  18. Bureau of Indian Standards (copy hosted by Puducherry Fire Service): National Building Code of India 2016, Volume 1, Part 4 Fire and Life Safety: Table 7, Minimum Requirements for Fire Fighting Installations, and its notes 6 to 24 (read from the page images) (opens in a new tab)checked 25 October 2026
  19. Department of Town Planning and ULBs, Arunachal Pradesh (Gazette No. 347, 4 September 2019; copy on EoDB Arunachal): Arunachal Pradesh Building Bye-Laws, 2019 (notification No. DTP/BBL-03/2011-12/2592-601, 30 August 2019): definitions, bye-laws 2.9 to 2.17, chapter 11, Annexures C and D, and 13.5 (opens in a new tab)checked 24 October 2026
  20. Directorate of Fire and Emergency Services, Goa: BRAP 2024 item 284: fire NOC fees and timeline (opens in a new tab)checked 25 October 2026
  21. Urban Development Department, Rajasthan: Model Rajasthan Building Regulations, 2025, order No. P-11(5)/UDH/Bhavan Viniyam-2025/2025 (listed 12 May 2025): Regs 2.36, 2.75, 2.77, 4.6.2, 5.4, 11.2, 14.5 and Schedules 2 and 3 (opens in a new tab)checked 25 October 2026
  22. Government of Karnataka (PRS copy): Karnataka Fire Force (Amendment) Ordinance, 2023: section 13(3) high-rise NOC (opens in a new tab)checked 25 October 2026
  23. Delhi Fire Service (copy of Delhi Gazette Extraordinary, Part IV): Delhi Fire Service (Amendment) Rules, 2025, notification F.No. DFS/HQ/Misc/2025/01(E-259159)/237, gazetted 26 May 2026 (opens in a new tab)checked 25 October 2026
  24. Uttar Pradesh Gazette Extraordinary, 18 January 2024 (copy hosted by UP Fire and Emergency Services): Uttar Pradesh Fire and Emergency Services Rules, 2024, Notification No. 181/VI-Pu-8-2024-801(1)-2023: rules 40 to 56, 65, 66 and 72, Schedules VI and VII, Forms A-4, A-8 and A-11 to A-13 (opens in a new tab)checked 25 October 2026
  25. Assam Gazette Extraordinary No. 811, 24 December 2025 (PRS copy of the gazette): The Assam Fire and Emergency Services Act, 2025 (Assam Act No. LIII of 2025), notification No. LGL.52/2025/3: sections 1 to 67 and Schedule I (opens in a new tab)checked 25 October 2026
  26. Chennai Metropolitan Development Authority (copy of Tamil Nadu Government Gazette Extraordinary No. 43): Tamil Nadu Combined Development and Building Rules, 2019 (G.O. Ms. No. 18, MAWS, 4 February 2019): rules 2(58), 7, 20, 39, 64 and Annexure IX (opens in a new tab)checked 25 October 2026
  27. Andhra Pradesh Legislative Assembly (PRS copy of AP Gazette Part IV-A No. 12, 4 March 2026): Andhra Pradesh Fire Service (Amendment) Bill, 2026 (L.A. Bill No. 12 of 2026): new section 13 thresholds, 21-day and 30-day timelines (opens in a new tab)checked 24 October 2026
  28. Seva Sindhu, Government of Karnataka: Application for No Objection Certificate (High rise Building) - Fire & Emergency: documents, fee under G.O. of 13-09-2019, 60 working days (opens in a new tab)checked 24 October 2026
  29. Government of Telangana, Home (Ser.IV) Department: G.O.Ms.No.142, Home (Ser.IV), 9 August 2016: fire precaution fee amending the Levy of Fee Rules, 2006 (opens in a new tab)checked 24 October 2026
  30. Government of Andhra Pradesh, MA&UD (M) Department, final notification (copy hosted by Simpliance): G.O.Ms.No.273, 19 December 2025: amendments to the AP Building Rules, 2017 (high-rise at 24 m; Fire NOC before 24 m) (opens in a new tab)checked 24 October 2026
  31. Gujarat Fire Safety Compliance Portal (GujFireSafety CoP): Gujarat Fire Prevention and Life Safety Measures Regulations, 2023 (fees in Annexure 8) (opens in a new tab)checked 25 October 2026
  32. Kerala Fire and Rescue Services: Fee structure, G.O.(Ms)No.272/2024/Home (opens in a new tab)checked 24 October 2026
  33. Bihar Fire Service: Fire NOC and Audit portal: Schedule C, prescribed rate of fee for NOC, renewal, fire audit and fire consultation (opens in a new tab)checked 25 October 2026
  34. Home Department, Government of Odisha: Order No. 50908 of 19 November 2019: procedure for issue and renewal of Fire Safety Certificates and Fire Safety Recommendations (issuing officer, validity, inspecting team and time limit by building type) (opens in a new tab)checked 25 October 2026
  35. Fire and Emergency Services, Meghalaya: Annexure B (with continuation sheets B1 and B2) to notification HPL.179/2017/85: fees per m² and annual renewal fees for every building category (opens in a new tab)checked 24 October 2026
  36. Fire and Emergency Services, Assam: Annexure A, proposed rates of fee for issuance of No Objection Certificate, renewal NOC etc. (5 image pages, read from the page images) (opens in a new tab)checked 24 October 2026
  37. Directorate of Local Government, Punjab (Wayback Machine copy of 21 March 2022 of the portal's fee download): Letter No. S4-DSMS-(Fire)-2021/41343 of 8 October 2021: new fees for online fire NOCs, by NBC zone, with provisional, renewal and 30-day rules (opens in a new tab)checked 25 October 2026
  38. Municipal Corporation Chandigarh, Fire and Rescue Services: Office Order No. 23 of 10 February 2025: Fire Safety Certificate charges by NBC occupancy group from 1 April 2025, validity 3 years, exemptions (read from the page images) (opens in a new tab)checked 25 October 2026
  39. Bihar Gazette Extraordinary, 27 March 2014 (copy hosted by Bihar Fire Service): Bihar Fire Service Act, 2014 (Bihar Act 6 of 2014): sections 1, 2, 20, 29 to 37, 44 and 49 to 57 (opens in a new tab)checked 24 October 2026
  40. Gujarat Government Gazette (copy hosted by PRS Legislative Research): Gujarat Fire Prevention and Life Safety Measures Act, 2013 (Guj. Act 11 of 2013), Gazette Extraordinary of 1 April 2013, with Gujarat Act No. 5 of 2021 appended (Gazette of 23 March 2021) (opens in a new tab)checked 24 October 2026
  41. Gazette of India, Ministry of Home Affairs (copy hosted by TaxHeal): S.O. 2264(E) of 6 May 2026: the Haryana Fire and Emergency Services Act, 2022 extended to the Union territory of Chandigarh, with modifications (opens in a new tab)checked 25 October 2026
  42. Maharashtra Fire and Emergency Services: Guidelines for Form B, Annexure A: to be followed by licensed agencies issuing Form B under section 3(3) and rule 4(2) (circular of 7 July 2026) (opens in a new tab)checked 25 October 2026
  43. Delhi Fire Service: Renewal of Fire Safety Certificate (FSC/NOC) (last updated 23/10/2026) (opens in a new tab)checked 25 October 2026
  44. Directorate of Fire and Emergency Services, Nagaland: Nagaland Fire and Emergency Services Act (Act No. 5 of 2023), Nagaland Gazette, 31 August 2023 (opens in a new tab)checked 24 October 2026
  45. Urban Development Department, Government of Maharashtra (gazette copy hosted by MFS): Notification No. FFS-2022/C.R.36/UD-14, 30 May 2023: the Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023 comes into force on 30 May 2023 (Gazette Extraordinary Part IV-B No. 209) (opens in a new tab)checked 25 October 2026
  46. Government of Telangana, Home (Services.IV) Department: G.O.Ms.No.15, 20 January 2026: empanelment of Third-Party Fire and Life Safety Auditors and Fire and Life Safety System Integrators (opens in a new tab)checked 25 October 2026
  47. Delhi Gazette Extraordinary, Part IV (Home Department, Govt of NCT of Delhi): Notification F. No. 6/DFS/MS/HQ/MISC/2026/01/631, 16 October 2026 (No. 314, SG-DL-E-17102026-277257): commencement of Rules 34 to 38 and the First and Seventh Schedules extended to 20/05/2027 (opens in a new tab)checked 25 October 2026
  48. Directorate of Fire and Emergency Services, Tripura: Tripura Fire Safety Rules, 2026 (Tripura Gazette, 2 June 2026) (opens in a new tab)checked 24 October 2026
  49. Government of Uttarakhand, Sarkari Gazette Extraordinary, 21 July 2022 (copy hosted by Uttarakhand Fire and Emergency Services): Uttarakhand Fire & Emergency Service, Fire Prevention and Fire Safety (Amendment) Act, 2022 (Uttarakhand Act No. 06 of 2022), assented 20 July 2022, notification 191/XXXVI(3)/2022/36(1)/2022: sections 15(4) and 18 at 12 m and 500 m2 (opens in a new tab)checked 24 October 2026
  50. Directorate of Town and Country Planning, Madhya Pradesh: Madhya Pradesh Bhumi Vikas Rules, 2012, English text updated up to 6 March 2025: rules 2(38), 12(2), 26, 42 and 87 (fire audit amendment of 4 September 2020) (opens in a new tab)checked 25 October 2026
  51. Ranchi Municipal Corporation: Ranchi Municipal Corporation BPAMS: building plan approval through a licensed technical person (opens in a new tab)checked 24 October 2026
  52. Directorate of Fire and Emergency Services, Goa: Citizen's Charter, December 2024: 17 fire stations, 3 zones, 1,106 posts, the section 13 notification 3/5/97-HD(G) Part/3934 of 17 December 2014 with Annexures I and II, the 2018 Annexure III on shacks and guest houses, and the 2009 fee rules (opens in a new tab)checked 25 October 2026
  53. Government of Sikkim, Sikkim Government Gazette Extraordinary No. 466, 17 December 2025: The Sikkim Fire and Emergency Services Rules, 2025: Home Department notification No. 99/Home/2025, 17 December 2025, under section 63 of Act 4 of 2023, with Schedules I to V and Forms A1 to A20 (opens in a new tab)checked 25 October 2026
  54. Department of Fire Services, Himachal Pradesh: Acts and Rules: HP Fire Fighting Services Act, 1984 with the 2000 amendment (section 15-A) (opens in a new tab)checked 24 October 2026
  55. Gazette of Meghalaya No. 12, Part IIA, 25 March 2021 (copy hosted by the Urban Affairs Department): Meghalaya Building Bye-Laws, 2021 (No. UAU.73/2016/Pt/402 of 9 March 2021): A2.30 high-rise, A2.59 special buildings, A4.1.3, A10 occupancy and fire clearance, C11 (opens in a new tab)checked 25 October 2026
  56. Ladakh Gazette Extraordinary (Housing and Urban Development Department, UT Ladakh), copy on the OBPS portal: S.O. 123 of 4 November 2024 (SG-LD-E-19112024-1416): Unified Ladakh Building Bye Laws, 2024, for the municipal limits of Leh and Kargil (opens in a new tab)checked 24 October 2026
  57. Government of Manipur (PRS copy): Manipur Fire and Emergency Service Act, 2026 (Act 9 of 2026) (opens in a new tab)checked 24 October 2026
  58. Fire and Emergency Services and SDRF, Chhattisgarh: HQ order No. 204/Agnishaman/2025, 16 October 2025: risk-based NOC validity of 3, 2 or 1 years (opens in a new tab)checked 24 October 2026
  59. Jammu and Kashmir Official Gazette (Extraordinary), copy hosted by the Housing and Urban Development Department: J&K Official Gazette, Vol. 134, No. 39-4, 24 December 2021: the Jammu and Kashmir Unified Building Bye-Laws, 2021 (opens in a new tab)checked 24 October 2026
  60. Gazette of India Extraordinary (CG-DL-E-02062026-273069): Dadra and Nagar Haveli and Daman and Diu Fire and Emergency Service Regulation, 2026 (No. 6 of 2026) (opens in a new tab)checked 24 October 2026
  61. Lakshadweep Administration, Lakshadweep Fire Force (Home Department): Notification F.No.03/11/2020-FIRE(PART), 27 May 2026, Lakshadweep Gazette Extraordinary Vol. LXII No. 14: Regulation in force from publication (opens in a new tab)checked 24 October 2026
  62. Gazette of India Extraordinary, Part II Section 1, No. 19, 25 May 2026: Andaman and Nicobar Islands Fire and Emergency Service Regulation, 2026 (No. 5 of 2026) (opens in a new tab)checked 24 October 2026
  63. Government of Puducherry, Home Department (copy hosted by the Fire Service Department): G.O.Ms.No.61, 10 September 2025: Fire Safety Audit and Issue of NOC, Third Party Fire Safety Audit, Categories A, B and C, renewal, temporary licences, and Annexures I to V on licensed agencies and the Category C protocol (opens in a new tab)checked 25 October 2026
  64. Home Department, Government of Mizoram (copy on the Mizoram Fire and Emergency Services site): Notification No. B-20011/2/2026-HM(F&ES), 20 August 2026: Mizoram Fire and Emergency Services (Superintendence and Control of the Fire Force and Fire Safety and Prevention) (Amendment) Rules, 2026, substituting Rule 57 and inserting Rules 57(A) and 57(B) (opens in a new tab)checked 25 October 2026
  65. The Siasat Daily: HYDRAA probes fake fire NOC racket, denies corruption claims (6 August 2026) (opens in a new tab)News report · checked 24 October 2026
  66. Navbharat Live, 6 June 2026 (Hindi): Pune fire safety: only 489 institutions filed Form B with the PMC fire department (opens in a new tab)News report · checked 25 October 2026
  67. The Tribune: Sharp increase in fire safety fines in Chandigarh under new Act (14 July 2026): rules pending, renewals delayed (opens in a new tab)News report · checked 24 October 2026
  68. PropNewsTime (page last updated 16 August 2023): Only 40,000 Maharashtra housing complexes submit reports on fire system maintenance (opens in a new tab)News report · checked 25 October 2026
  69. Pune Pulse, 27 January 2023: Alarming numbers: only 15-20 percent housing societies in Pune completed fire safety audit (fire chief: 10 to 15 percent filed Form B) (opens in a new tab)News report · checked 25 October 2026
  70. The Tribune, 17 May 2022: No NOC in 30% Gurugram high-rises, audit ordered (opens in a new tab)News report · checked 25 October 2026
  71. Scroll.in, 22 January 2022: Mumbai: At least six dead, 15 injured after fire breaks out in 20-storey building (opens in a new tab)News report · checked 25 October 2026