Fire NOC for a data centre: E-II rules, server rooms, batteries, DG sets and state policies
Updated By Flamekite Editorial DeskFacts checked against official sources on
Quick answer
A data centre is Group E business; NBCS 2026 names it E-II and asks sprinklers, a wet riser, hydrant and detection at any size. Your state sets the NOC line.
Where a state's fire rules name data centres at all (Sikkim, Meghalaya), they file them under business, so a data centre crosses the same line as any business building: over 15 m in Delhi, a floor over 500 m² in Haryana, 21 m in Karnataka, any size in Uttar Pradesh. State data centre policies relax height, FAR and parking but keep fire: Uttar Pradesh allows stacked DG sets only with a fire NOC, and Haryana promises the Fire Fighting Scheme within 10 working days.
- Li-ion backup a rack before mist is barred
- 20 kWh
- 600 kWh a floor lifts the building to CL-6
- Battery rules
Free, on WhatsApp. Or set a renewal reminder
Fire NOC for a data centre at a glance: 12 facts
| What | The rule | Source |
|---|---|---|
| NBC 2016 class | E-3: electronic data processing centres and computer installations, with IT parks and call centres | BIS, NBC 2016 Part 4 |
| NBCS 2026 class | Group E split into E-I, business buildings with people, and E-II, datacentres as a machine environment; Annex F sets data centre rules | NBCS 2026 Annex F |
| NBCS 2026 in law | Voluntary; only Assam had written NBCS 2026 into its fire law by 24 October 2026; UP's OSH rule 12 binds employers at 5 floors or 20 m | Assam Act XIII of 2026 |
| Systems at every size | Table 7E's data centre rows ask extinguishers, hose reels, wet riser, yard hydrant, sprinklers, detection and voice evacuation below and above 15 m; no down-comer | NBCS 2026 Table 7E |
| Server rooms and data halls | Table 9 rates aspirating smoke detection, water mist, clean agent and pre-action sprinklers suitable | NBCS 2026 Table 9 |
| Lithium-ion battery rooms | Pre-action sprinklers and water spray suitable; clean agent and water mist not suitable (Table 9); Note 15 asks pre-action only | NBCS 2026 Table 9 |
| Who decides the NOC | The state. Only Sikkim's Rules 2025 and Meghalaya's fee annex name data centres, both under business; elsewhere the business building line applies | Sikkim F&ES Rules 2025 |
| Uttar Pradesh policy | DC Policy 2026 (G.O. 536 of 9 July 2026): multi-level DG stacking only with a NOC from the Fire Safety Department | UP DC Policy 2026 |
| Haryana policy | Fire Fighting Scheme within 10 working days, Occupation Certificate within 15, through HEPB's single roof | Haryana DC Policy 2022 |
| CEA battery rules | BESS above 650 V: automatic suppression in every battery container and a third-party fire audit, in force 1 April 2027 | CEA |
| Diesel without a licence | Class B non-bulk up to 2,500 litres in receptacles of at most 1,000 litres; Class C up to 45,000 litres | PESO SOP |
| Last verified | 25 October 2026, against each instrument named on this page | Not stated |
Data centre fire NOC lines beside state data centre policies: 18 states
| Option | When a data centre building needs the certificate | State data centre policy and its fire clause | Fire instrument | Source |
|---|---|---|---|---|
| Uttar Pradesh | Every business building, at any size; 3-year certificate | DC Policy 2026: DG stacking needs a fire NOC; height relaxed only within fire regulations | Act 16 of 2022, s.26(3); Rules 2024 | UP DC Policy 2026 |
| Haryana | A floor over 500 m², or a high-rise | DC Policy 2022: Fire Fighting Scheme in 10 working days; data centres an infrastructure industry since 22 November 2023 | Act 14 of 2022, s.18 | Haryana DC Policy 2022 |
| Tamil Nadu | Director's NOC above 18.3 m; District Officer below | DC Policy 2021: DG stacking to G+5 with clearances; windows to 5% of facade within fire rules; window closed 31 March 2026 | TNCDBR 2019; TNSWP procedure | TN DC Policy 2021 |
| Odisha | 12 m and above, or 500 m² built-up; 2 years | DC Policy 2022: no fire clause; 50% of building fees refunded, up to Rs 2 lakh | Rules 2017, rule 9(1) as substituted in 2019 | Odisha DC Policy 2022 |
| Delhi | Business over 15 m or of 5 storeys or more | No data centre policy read | DFS Rules 2010, Rule 27 as gazetted 26 May 2026 | DFS |
| Karnataka | 21 m or more, any use | DC Policy 2022 not read from an official copy | Fire Force Act 1964, s.13(3) | Government of Karnataka |
| Telangana | Business above 15 m, risk class R3 | 2016 policy: no official copy found | Circular of 5 March 2016 | TSDRFS circular 2016 |
| Maharashtra | Schedule-I business rows at every height; above 30 m a fire officer and a 2-year audit | IT and ITES Policy 2023 and green park GRs not read: the official site refused connections | Act of 2006 as amended in 2023 | Amendment Act 2023 |
| West Bengal | Certificate for high-risk buildings; the Form-7 yearly route is written for E-1 offices | DC Policy 2021 not read: the official links were broken | Notification 1930 of 1 March 2024 | WB notification 1930 |
| Rajasthan | Business 9 m or more, or over 500 m² on any floor | No data centre policy read | UDH and LSG order of 14 September 2023 | Rajasthan UDH |
| Kerala | Group E over 1,000 m² or over 15 m | No data centre policy read | Municipality Building Rules, rule 5(4) | KMBR amendment 2025 |
| Bihar | 15 m or more, or any floor over 500 m² | No data centre policy read | Fire Service Rules 2021 | Bihar Rules 2021 |
| Assam | Business at any size, risk by height; valid until cancelled | No data centre policy read; its fire law names NBCS 2026 | Act LIII of 2025 as amended 14 August 2026 | Assam Act LIII of 2025 |
| Chandigarh | A floor over 500 m², or a high-rise; 5 years | No data centre policy read | Haryana Act 2022 as extended on 6 May 2026 | Gazette of India |
| Gujarat | Offices above 15 m, or with a floor over 500 m²; data centres are not named | No data centre policy read | Fire Regulations 2023, Third Schedule | Gujarat Fire Safety Compliance Portal |
| Sikkim | Every business building; rule 28 names data centres among business buildings that need no agency certificate below 15 m with floors under 500 m² | No data centre policy read | Fire and Emergency Services Rules 2025, rule 28 | Sikkim F&ES Rules 2025 |
| Meghalaya | Every business building in Shillong city and adjoining areas; the fee annex lists IT parks, data centres and call centres as E-3 | No data centre policy read | Notification HPL.127/2023/43 of 26 September 2024; fee Annex B | HPL.127/2023/43 |
| Andhra Pradesh | More than 500 m² on one floor, or 24 m and above | No data centre policy read | Fire Service Act 1999, s.13(1) as amended in 2026 | Andhra Pradesh Legislative Assembly |
How to get a fire NOC for a data centre: 10 steps
Fix the class and the state line
Treat the building as Group E business: E-3 in NBC 2016, E-II in NBCS 2026. Then read your state's business line in the table above; a server room inside an office follows the office building.
Run the fire risk assessment at concept
Annex F wants one at planning and again during operation, covering ignition sources, fire load, electrical risks and HVAC.
Plan the envelope and compartments
Type 1 construction only, at most 2 basements, 2-hour rooms for server, UPS, battery and network equipment, and 2,000 m² sprinklered compartments.
Place the batteries and the DG sets
No battery, UPS or fuel rooms in basements; batteries behind 120 minute construction; DG sets at ground or first basement, or stacked beside the building as Annex F allows.
Choose detection and suppression room by room
Use Table 9: aspirating smoke detection and clean agent or pre-action sprinklers for data halls; pre-action or water spray, never clean agent or mist, for lithium-ion battery rooms.
Size the water and pumps by calculation
Every data centre row in Table 7E needs a wet riser, yard hydrant and sprinklers; a cluster of up to 3 buildings may share pumps with an added diesel pump and double storage.
Apply for the fire scheme with the building plan
Haryana's policy promises the Fire Fighting Scheme within 10 working days through HEPB; elsewhere apply on the state fire portal with the drawings the documents page lists.
Take the petroleum and electrical permissions
Diesel above the licence-free limits needs a licence from the District Authority or PESO; battery systems answer to the Electrical Inspector, and from 1 April 2027 to the CEA BESS chapter.
Test, then apply for the certificate before go-live
Install, test and commission the systems; the fire officer inspects before the certificate or Occupation Certificate is issued.
Diary renewals, filings and audits
Uttar Pradesh renews every 3 years, Odisha every 2, Maharashtra files Form B each January and July, and BESS above 650 V needs a third-party fire audit within 3 months of 1 April 2027.
Where a data centre sits in the codes: E-3, E-II and Annex F
Both national codes put a data centre in Group E, business. NBCS 2026 is the first to give it a subdivision of its own and an annex of rules.
- E-3, NBC 2016 clause 3.1.6
- Electronic data processing centres, computer installations, IT parks and call centres share one subdivision with people-heavy IT offices. BIS, NBC 2016 Part 4
- NBC 2016 clause 6.5.2(b)
- For E-3, E-4 and E-5: automatic detection and alarm, with clean agents, mist or hypoxic air for special locations and CO2 or inert gas flooding for electrical panels. BIS, NBC 2016 Part 4
- E-I, NBCS 2026
- Business buildings that people occupy: offices, labs, IT parks, call centres. NBCS 2026 Annex F
- E-II, NBCS 2026
- Datacentres as a machine environment, classed by primary use, scale and the process equipment inside. NBCS 2026 Annex F
- Annex F, NBCS 2026
- Requirements for data centres in 9 clauses: risk assessment, construction, detection, suppression, electrical and HVAC, egress, seismic bracing, security and optional energy indicators. NBCS 2026 Annex F
- Data hall
- The rack space. Table 2 plans it at 50 m² gross a person against 10 m² for the admin areas. NBCS 2026 Tables 2, 4, 6
- BBU
- A backup battery unit inside the rack. Table 7E Notes 10 and 12 turn on whether a rack's lithium-ion BBU exceeds 20 kWh. NBCS 2026 Table 7E
- CL-6
- The protection level Note 11 asks of internet, hyperscale and colocation data centres, and Note 14 of any building with lithium-ion storage over 600 kWh a floor. NBCS 2026 Table 7E
- Battery energy storage system
- In the CEA's 2026 amendment, a stationary system connected to the electricity system that stores energy electrochemically, with its power conversion and battery management. CEA
NBCS 2026 Annex F for data centres: 16 points to design to
Annex F and Table 7E, paraphrased clause by clause. NBCS 2026 is voluntary unless your state or a rule like UP's OSH rule 12 brings it in.
- Every data centre row in Table 7E, below and above 15 m and at up to or over 1,000 m² a floor, asks extinguishers, hose reels, a wet riser, a yard hydrant, wet sprinklers, automatic detection and PA with voice evacuation; a down-comer is not required. NBCS 2026 Table 7E
- Assess fire risk at the planning stage and again during operation (F-1). NBCS 2026 Annex F
- Validate and certify the fire resistance of structural and non-structural elements against Table 1 (F-2.1). NBCS 2026 Annex F
- Seal external openings, and route no water source or pipeline through or above the data centre, UPS room or communications room (F-2.2). NBCS 2026 Annex F
- Separate server rooms, battery banks and fuel storage with fire-rated assemblies, and seal cable tray and duct openings to the compartment's rating (F-2.3). NBCS 2026 Annex F
- Keep basements to 2 at most, inside the building line and no larger in total than the ground floor (F-2.4). NBCS 2026 Annex F
- Agree fire truck access and movement with the local fire authority while planning parking and loading (F-2.5). NBCS 2026 Annex F
- Build in Type 1 construction only, with ground coverage ideally no more than 60 percent (F-2.7). NBCS 2026 Annex F
- Use aspirating smoke detection in server areas, with heat and high-sensitivity smoke detection to trigger suppression early (F-3.1, F-3.2). NBCS 2026 Annex F
- Make clean agents such as heptafluoropropane or a fluorinated ketone available throughout data hall areas, ozone-friendly and easy to recharge and test (F-4.1, F-4.3). NBCS 2026 Annex F
- Cover server rooms, network rooms, UPS and battery areas, and the spaces under raised floors and above ceilings (F-4.2). NBCS 2026 Annex F
- Integrate detection and suppression with the fire alarm and the building management system (F-4.4). NBCS 2026 Annex F
- Give UPS, transformer and generator rooms fire-rated partitions and doors and their own suppression (F-5.1). NBCS 2026 Annex F
- Fit fire dampers and smoke detectors in supply, fresh and return air ducts (F-5.4). NBCS 2026 Annex F
- Provide 2 enclosed, fire-rated, pressurised staircases at least 1.5 m wide in the data centre building (F-6.2). NBCS 2026 Annex F
- Let access-controlled doors alarm when left open and open for the area in fire (F-8). NBCS 2026 Annex F
Server, UPS and battery room protection in NBCS 2026 Table 9
Table 9 marks each detection and suppression system suitable (S) or not suitable (NS) for each room type. These are the 5 rows a data centre uses, read off the page image.
| Aspirating smoke detection | Heat, gas, flame or video detection | Water mist | Clean agent gas | Pre-action sprinkler | Water spray | |
|---|---|---|---|---|---|---|
| Server room or data hall NBCS 2026 Table 9 | S | NS | S | S | S | NS |
| Network or electrical room NBCS 2026 Table 9 | S | NS | S | S | S | NS |
| UPS room without batteries NBCS 2026 Table 9 | S | Gas, flame or video: S | S | S | S | NS |
| UPS room with batteries other than lithium-ion NBCS 2026 Table 9 | S | Gas, flame or video: S | S | S | S | NS |
| Battery room with lithium-ion NBCS 2026 Table 9 | S | Pneumatic linear heat and gas, flame or video: S | NS | NS | S | S |
Every row marks fuel leak detection, linear heat sensing cable, modular rack suppression with heat-sensitive tubing, wet chemical and aerosol systems NS. Server rooms and network rooms mark gas, flame and video detection NS. Table 9's title says A to F occupancies while clause 5.4 speaks of G to J; the rows are the same either way. Clause 4.5.3.2 separately asks every server, UPS, battery, network and telecom room to be enclosed in 2-hour construction whatever its size.
Data centre fire limits in NBCS 2026: 14 numbers
The figures NBCS 2026 sets for data centre buildings, read off the page images of Tables 2, 4, 6 and 7E and Annex F.
20 m² a person
Gross occupant load for a data centre building (Table 2); general business is 7.1 m² net NBCS 2026 Tables 2, 4, 6
50 m² a person
Gross occupant load in data halls, server and equipment rooms NBCS 2026 Tables 2, 4, 6
10 m² a person
Gross occupant load in a data centre's admin areas NBCS 2026 Tables 2, 4, 6
60 m
Longest travel to an exit in a sprinklered data centre building; Table 4 gives no unsprinklered figure NBCS 2026 Tables 2, 4, 6
2,000 m²
Largest sprinklered compartment in a data centre building (Table 6); it must be sprinklered to have one NBCS 2026 Tables 2, 4, 6
2 hours
Fire rating for every server, UPS, battery and network room, whatever its size (4.5.3.2) NBCS 2026 Tables 2, 4, 6
120 minutes
Fire-rated construction round battery rooms (F-5.2) NBCS 2026 Annex F
1.5 m
Least width of each of the 2 pressurised staircases (F-6.2) NBCS 2026 Annex F
2 basements
Most a data centre should have, none larger in total than the ground floor (F-2.4) NBCS 2026 Annex F
60 %
Ground coverage Annex F suggests as the ceiling (F-2.7); UP's policy allows the same NBCS 2026 Annex F
5 generators
How many DG sets Annex F suggests may be stacked beside the building (F-5.1) NBCS 2026 Annex F
3 buildings
Cluster of data centres that may share pumps and storage with an added diesel pump and double water (Note 13) NBCS 2026 Table 7E
1,000 m²
Floor area that splits Table 7E's data centre rows; both bands ask the same systems NBCS 2026 Table 7E
1 car space
Per 100 m² of the admin building (F-2.5); the data centre block is planned by trucks NBCS 2026 Annex F
Lithium-ion batteries in a data centre: 6 rules, rack to BESS
Lithium-ion appears at 4 scales in a data centre: in the rack, in a battery room, across a floor, and as grid-connected storage. Each has its own rule.
In the rack, up to 20 kWh
NBCS 2026 Note 12: racks with lithium-ion BBUs of no more than 20 kWh get wet or dry sprinklers, pre-action or water mist third-party tested for lithium-ion BBUs. Note 10 keeps clean agent for data halls whose racks have no BBU. NBCS 2026 Table 7E
In the rack, over 20 kWh
Note 12 again: above 20 kWh a rack, water mist is not to be installed. NBCS 2026 Table 7E
In a battery room
Table 9 marks clean agent and water mist not suitable for a lithium-ion battery room, and pre-action sprinklers and water spray suitable; Note 15 asks wet or single-interlock pre-action sprinklers only, treating the whole room as the area of operation. NBCS 2026 Table 9
Behind the walls
Annex F wants batteries segregated by 120 minute construction and ventilated as the maker instructs; clause 4.2.19.1 keeps battery and UPS rooms out of basements. NBCS 2026 Annex F
Across a floor, over 600 kWh
Note 14: a building with lithium-ion energy storage above 600 kWh on any floor complies with protection level CL-6. NBCS 2026 Table 7E
As grid-connected storage above 650 V
From 1 April 2027 the CEA's Chapter XA asks smoke, gas, heat and flame detection, automatic suppression in every battery container, 1.8 m fencing and a third-party fire safety audit reported to the Electrical Inspector. CEA
Fire clauses in 4 states' data centre policies
Flamekite read 6 official instruments from Uttar Pradesh, Tamil Nadu, Haryana and Odisha. They relax building norms and speed approvals; none waives the fire NOC.
Uttar Pradesh, G.O. 536 of 9 July 2026
UP Data Centre Policy 2026
5 years; repeals the 2021 policy. FAR 3.0 free plus 1.0 chargeable, DG space outside FAR, single-floor height unrestricted subject to structural and fire safety rules, and multi-level DG stacking only with a Fire Safety Department NOC. UP DC Policy 2026
Uttar Pradesh, 2021 as amended in 2022
UP Data Center Policy 2021
The same DG stacking clause, and a special task force with the Fire Safety department to suggest better regulatory norms. Windows allowed only with modern fire-fighting equipment installed. UP DC Policy 2021
Tamil Nadu, G.O.(Ms.) No. 33 of 23 November 2021
Data Centre Policy of Tamil Nadu 2021
A separate data centre category under TNCDBR 2019; DG stacking structures up to G+5 subject to clearances; windows up to 5% of the facade within building and fire safety rules. It covered data centres incorporated by 31 March 2026. TN DC Policy 2021
Haryana, 7 July 2022
Haryana State Data Center Policy 2022
Valid 7 years. Building plan, temporary power, Fire Fighting Scheme and consent to establish within 10 working days; Occupation Certificate, permanent power and consent to operate within 15, through HEPB's Single Roof Clearance System. Haryana DC Policy 2022
Haryana, Gazette of 22 November 2023
Data centres as an infrastructure industry
Data centres under the 2022 policy declared a separate Infrastructure Industry by notification No. 02/13/2023-4IB-II. Haryana Gazette
Odisha, 2022
Odisha Data Centre Policy 2022
No fire clause; it lists fire detection and control among a data centre's physical infrastructure, refunds 50% of building fees up to Rs 2 lakh, and treats data centres as essential services. Odisha DC Policy 2022
Uttar Pradesh's rule on stacked DG sets at data centres
Both of Uttar Pradesh's data centre policies tie stacked generators to the fire service. Para 8.3(vii) of the 2026 policy reads:
Word for word
Installation of DG sets including multi-level DG stacking shall be allowed subject to NOC from Fire Safety Department.
The 2021 policy carried the same words at para 8.3(ix). Tamil Nadu's 2021 policy allows DG stacking structures up to G+5 "subject to necessary clearances and orders of the Government" without naming the fire service. NBCS 2026 Annex F suggests up to 5 stacked generators beside the building with the maker's advice, while its clause 3.5.5.4 keeps DG sets inside a building to the ground floor or first basement.
DG sets and diesel tanks at a data centre: 5 dos and 4 don'ts
From NBCS 2026 clause 3.5.5.4 and Annex F, Uttar Pradesh's policy and PESO's Petroleum Rules SOP. Each line names its source.
Do
- Enclose an indoor DG room in 120 minute walls and doors, and plan its ventilation and exhaust (3.5.5.4). NBCS 2026 Tables 2, 4, 6
- Put a separate oil tank in a dyked enclosure holding at least 10 percent more than the tank, with 300 mm of sand (3.5.5.4). NBCS 2026 Tables 2, 4, 6
- Give the generator room its own suppression and fire-rated doors (Annex F, F-5.1). NBCS 2026 Annex F
- In Uttar Pradesh, take the Fire Safety Department's NOC before stacking DG sets. UP DC Policy 2026
- Keep Class B diesel non-bulk within 2,500 litres in receptacles of 1,000 litres or less to need no licence; up to 25,000 litres take Form XIII from the District Authority. PESO SOP
Don’t
- Don't install DG sets above the ground floor or below the first basement inside the building (3.5.5.4). NBCS 2026 Tables 2, 4, 6
- Don't put fuel oil storage, UPS rooms or battery rooms in a basement (4.2.19.1). NBCS 2026 Tables 2, 4, 6
- Don't count a tank over 1,000 litres as non-bulk: PESO treats it as bulk storage. PESO SOP
- Don't assume diesel's class: PESO lists diesel (HSD) as needing a licence but classes petroleum by flash point, so check the fuel's certificate. PESO
Does your data centre or server room need a fire NOC? 12 cases
Find the first line that fits. A data centre crosses the same line as any business building in its state; a server room follows the building it sits in.
If Uttar Pradesh, any data centre
Yes: section 26(3) covers every business building; below 10 m and 500 m² no agency certificate is needed. Fire NOC UP UP Rules 2024
If Delhi, over 15 m or 5 storeys
Yes, under Rule 27; certificates run 3 years for non-residential buildings until 20 May 2027. Fire NOC Delhi DFS
If Haryana or Chandigarh, a floor over 500 m²
Yes, as a special building at any height: scheme first, then the certificate. Fire NOC Haryana Government of Haryana
If Karnataka, 21 m or more
Yes, the section 13(3) NOC; lower buildings fall outside the state's line. Fire NOC Karnataka Government of Karnataka
If Telangana, above 15 m
Yes; business buildings sit in risk class R3. Fire NOC Telangana TSDRFS circular 2016
If Odisha, 12 m or 500 m² built-up
Yes: a Fire Safety Recommendation, then the certificate for 2 years. Fire NOC Odisha Odisha Rules 2019
If Rajasthan, 9 m or a floor over 500 m²
Yes, with fees by square foot, generally every year. Fire NOC Rajasthan Rajasthan UDH
If Kerala, over 1,000 m² or over 15 m
Yes; 300 to 1,000 m² files an Appendix L self-declaration. Fire NOC Kerala KMBR amendment 2025
If Maharashtra, any height
Schedule-I applies at every height and Form B goes in each January and July. Fire NOC Maharashtra Amendment Act 2023
If A UP data centre of 5 floors or 20 m
Besides the certificate, OSH rule 12 binds the employer or owner to NBCS 2026 Part F, which carries Annex F. OSH Code 2020 UP Gazette
If A server room inside an office building
No separate NOC: the office building's certificate covers it, but NBCS asks a 2-hour enclosure and Table 9 systems. Fire NOC for Office NBCS 2026 Tables 2, 4, 6
If Below every line in your state
No certificate, but extinguishers, detection and the building's own fire rules still apply; check with the free checker. Do I need a fire NOC? NBCS 2026 Table 7E
Data centre fire NOC fees in 10 official schedules
A data centre pays the business or non-residential rate where a state publishes one. Each line is from an official schedule; vendors' and consultants' charges are not shown.
As published
- Karnataka, non-residential high-riseRs 60 per m²At least Rs 5,00,000 (Seva Sindhu listing) Seva Sindhu
- Meghalaya, E-3: IT parks, data centres and call centresRs 4 per m²Renewal Rs 1,000; the only schedule read that names data centres Meghalaya F&ES
- Chandigarh, Group E businessRs 14 per m²At least Rs 6,615 (MC Office Order 23) MCC Office Order 23
- Telangana, fire precaution feeRs 10 per m²Of total built-up area; renewal inspection Rs 10,000 (G.O.Ms.No.142 of 2016) G.O.Ms.No.142
- West Bengal, high-risk buildingsRs 4.35 to Rs 13.05 per m²By group, on floor area (notification of 5 February 2020) WBXPressstudy
- Odisha, non-residentialRs 2 per m²At the recommendation, the certificate and each renewal OFES FSR service
- Rajasthan, Nagar Nigam areaRs 2 per sq ftRs 1.50 in a Nagar Parishad, Rs 1 in a Nagar Palika Rajasthan UDH
- Uttar PradeshNilThe fire service dashboard lists no fee UP Fire dashboard
- Tamil NaduNilThe TNFRS procedure sheets say no fees are collected TNSWP
- HaryanaNone prescribedThe 2022 Act leaves fees to rules not yet notified ULB Haryana
Odisha's data centre policy refunds 50% of building fees and plan approval cost paid to municipal authorities, up to Rs 2 lakh a unit; it does not say whether the fire fee counts. Every state's rate is on the fees page.
What a data centre risks without fire clearance: 8 penalties
A data centre answers to the fire law, to the petroleum law for its diesel and, as an employer, to the OSH Code. Each line names the law that sets it.
| Offence | Penalty | Law |
|---|---|---|
| Breaching the fire safety chapter in Delhi | Up to 6 months or Rs 50,000 or both, and up to Rs 3,000 a day | Delhi Fire Service Act 2007, section 37 Caseminestudy |
| Letting fire systems lapse in Maharashtra | Rigorous imprisonment of 6 months to 3 years and a fine of Rs 20,000 to Rs 50,000 | Maharashtra Act 2006, section 36(1) MFS Act 2006 copy |
| Not maintaining fire equipment in Gujarat | Rs 10,000 to Rs 1 lakh or 1 month to 2 years or both, plus up to Rs 3,000 a day | Gujarat Act 2013, section 39(1) Gujarat Gazette |
| Occupying a high-risk business building without a certificate in Assam | Rs 1 lakh to Rs 5 lakh | Assam Act LIII of 2025, section 26 Assam Act LIII of 2025 |
| No Fire Safety Officer within 30 days of notice in Haryana | Rs 10 to Rs 50 per m² a month | Haryana Act 2022, section 26 Government of Haryana |
| No fire NOC or equipment missing in Rajasthan | Rs 5,000 on the owner or user | Rajasthan Municipalities Act 2009, section 291 Rajasthan UDH |
| Storing diesel beyond the licence-free limit without a licence | Up to 1 month or Rs 1,000 or both; up to 3 months or Rs 5,000 on a repeat | Petroleum Act 1934, section 23 Petroleum Act 1934 |
| An employer breaking an OSH rule such as UP rule 12 | Rs 2 lakh to Rs 3 lakh, and up to Rs 2,000 a day if it continues | OSH Code 2020, section 94 OSH Code |
Every state's penalty ladder is on the fire NOC penalties page.
Data centre fire NOC worked cases: 8 facilities
Each case applies the instruments to a described facility. They are Flamekite's worked examples, not decisions of any fire service.
Case 1
A 12 MW colocation building in Greater Noida
6 floors, 30 m, lithium-ion UPS rooms.
What applies A UP fire certificate for 3 years at any size, a data centre unit under the 2026 policy (over 2 MW, under 40 MW), a fire NOC before any stacked DG sets, and OSH rule 12 bringing in NBCS Part F at 20 m. UP DC Policy 2026
Case 2
A 20 MW campus in Gurugram, 2,500 m² a floor
4 floors on a 4 acre plot.
What applies A floor over 500 m², so a special building: the Fire Fighting Scheme is promised within 10 working days and the Occupation Certificate within 15 under the 2022 policy. Haryana DC Policy 2022
Case 3
A 24 m data centre in Bengaluru, 20,000 m² built up
Non-residential high-rise.
What applies 21 m or more, so a section 13(3) NOC: 20,000 x Rs 60 = Rs 12,00,000, above the Rs 5,00,000 floor. Seva Sindhu
Case 4
A 14 m edge site in Hyderabad
Ground plus 2, 600 m² a floor, 1 MW.
What applies Below Telangana's 15 m business line, so no NOC under the 2016 circular; Table 7E would still ask a wet riser, hydrant and sprinklers. TSDRFS circular 2016
Case 5
A 6,000 m² data centre in Bhubaneswar
3 floors, 15 m.
What applies Over 12 m: a Fire Safety Recommendation and a certificate at Rs 2 per m², Rs 12,000 each, renewed every 2 years. OFES FSR service
Case 6
A 30 m data centre in Chennai
Built under the 2021 policy, DG structure of ground plus 3.
What applies Above 18.3 m, the Director's NOC with no fee; the policy allowed DG stacking to G+5 subject to clearances. TN DC Policy 2021
Case 7
A 40 m² server room on an office floor in Kolkata
Inside a 20 m office building.
What applies No separate NOC; the building's certificate covers it. NBCS asks a 2-hour enclosure, and Table 9 points to aspirating detection with clean agent or pre-action sprinklers. NBCS 2026 Table 9
Case 8
A floor with 800 kWh of lithium-ion storage
A battery hall serving the UPS.
What applies Over 600 kWh a floor: the building complies with CL-6 (Note 14); the battery room takes pre-action sprinklers only, with no clean agent or water mist. NBCS 2026 Table 7E
Where data centres fail on fire safety, and the fix: 8 cases
Faults the codes and policies anticipate in data centres, each with the clause that answers it.
If Battery or UPS rooms placed in a basement
NBCS 4.2.19.1 lists battery rooms, UPS rooms and fuel oil storage among uses a basement should not hold; move them above ground. NBCS 2026 Tables 2, 4, 6
If Clean agent chosen for a lithium-ion battery room
Table 9 marks clean agent not suitable there; use pre-action sprinklers or water spray, as Note 15 asks. NBCS 2026 Table 9
If Chilled water or drain pipes run over the data hall
Annex F F-2.2 keeps every water source and pipeline out of and above the data centre, UPS and communications rooms. NBCS 2026 Annex F
If Cable trays punched through compartment walls and left open
Seal openings for trays and ducts to the compartment's fire rating (F-2.3). NBCS 2026 Annex F
If Access-controlled doors that stay locked on a power cut
Doors must unlock on loss of power and when the alarm or sprinklers operate, with a PUSH TO EXIT release independent of the access electronics. NBCS 2026 Tables 2, 4, 6
If Generators stacked without the fire service's say
Uttar Pradesh's policy makes stacking subject to a Fire Safety Department NOC; plan it into the fire scheme. UP DC Policy 2026
If Diesel kept in a 2,000 litre tank as if it were drums
Over 1,000 litres a receptacle is bulk storage; the licence-free Class B limit covers non-bulk only. PESO SOP
If A data hall turned into offices or a call centre
Table 2 plans a data hall at 50 m² a person against 7.1 m² for business; Annex F asks authorities to consider such a change of occupancy, so get the class and exits reviewed. NBCS 2026 Tables 2, 4, 6
Data centre fire safety myths, checked against NBCS 2026
6 claims repeated online, including in the top search result, and what the instruments say.
You may have read
NBCS 2026's data centre rules start at 15 m or 750 m² on a floor.
Myth
What the sources say
Table 7E's data centre rows start below 15 m with floors up to 1,000 m², and ask the same systems at every size; Flamekite found no 750 m² line in Table 7E or Annex F. NBCS 2026 Table 7E
You may have read
A data centre's admin area is planned at 7.1 m² a person.
Myth
What the sources say
Table 2 gives 7.1 m² net for business in general, but 10 m² gross for a data centre's admin areas and 20 m² gross for the building. NBCS 2026 Tables 2, 4, 6
You may have read
Sprinklers are never allowed in a data hall.
Myth
What the sources say
Every data centre row in Table 7E asks wet sprinklers, and Table 9 marks pre-action sprinklers and water mist suitable for server rooms. NBCS 2026 Table 9
You may have read
Clean agent protects every room in a data centre.
Myth
What the sources say
Table 9 marks clean agent not suitable for a lithium-ion battery room, and Note 10 keeps it for data halls whose racks carry no BBU. NBCS 2026 Table 9
You may have read
A state data centre policy exempts you from the fire NOC.
Myth
What the sources say
None of the 6 instruments read does: UP ties DG stacking to a fire NOC, Tamil Nadu ties windows to fire rules, and their self-certification lists cover labour Acts only. UP DC Policy 2026
You may have read
The CEA's battery storage rules already apply.
Myth
What the sources say
They were gazetted on 30 March 2026 but come into force on 1 April 2027, and chapter XA's detailed rules apply to systems above 650 V. CEA
Data centre fire rules in India, dated: 2016 to 2027
The instruments that set or changed a data centre's fire duties, in order.
5 March 2016
Telangana's renewal circular puts business buildings above 15 m in risk class R3. TSDRFS circular 2016
23 November 2021
Tamil Nadu's Data Centre Policy, G.O.(Ms.) No. 33, allows DG stacking to G+5. TN DC Policy 2021
7 July 2022
Haryana notifies its Data Center Policy with a 10 working day Fire Fighting Scheme approval. Haryana DC Policy 2022
11 October 2022
Uttar Pradesh declares data centre industries an essential service. UP ESMA notification
7 November 2022
UP amends its 2021 policy; DG stacking stays subject to a fire NOC. UP DC Policy 2021
22 November 2023
Haryana declares data centres a separate infrastructure industry. Haryana Gazette
30 March 2026
The CEA's BESS amendment is gazetted, to come into force on 1 April 2027. CEA
31 March 2026
Tamil Nadu's 2021 policy stops covering newly incorporated data centres. TN DC Policy 2021
30 April 2026
NBC 2016 is withdrawn; NBCS 2026 brings E-II and Annex F. Gazette of India
9 July 2026
Uttar Pradesh notifies its Data Centre Policy 2026 and repeals the 2021 policy. UP DC Policy 2026
27 August 2026
UP's OSH rule 12 makes NBCS 2026 Part F binding on employers at 5 floors or 20 m. UP Gazette
1 April 2027
The CEA's battery storage chapter comes into force; the third-party fire audit is due within 3 months. CEA
The Delhi data centre fire of 5 June 2026: what was reported
From news reports, not yet an official source.
News reports only: Flamekite found no official probe report or fire service order on 25 October 2026, and the cause was still under investigation in the reports. The rules in force are in the sections above.
24 June 2026
A fire on 5 June at a New Delhi data centre run by STT Global Data Centres India was reported; Delhi Fire Services officials indicated lithium battery units may have been involved. The operator said the damage was largely confined to a single data hall. Business Todaynews report
30 June 2026
The site was reported as Next-Gen Tower, Greater Kailash-1; Tata Communications told the stock exchanges that a majority of affected customers' data had been recovered. W.Medianews report
What Flamekite could not confirm about data centre fire NOCs
These 9 points are where a reader would expect an answer and no official source gave one on 25 October 2026.
- Maharashtra's IT and ITES Policy 2023 and its green data centre park resolutions: the state's industries site refused connections, so their building and fire clauses are not on this page.
- West Bengal's Data Centre Policy 2021: the official links returned errors.
- Telangana's 2016 data centre policy and Karnataka's 2022 policy: no official copy was found; a 2024 Karnataka draft bye-law change for data centres was seen only in a secondary report and its final form was not found.
- Whether a rack BBU under 20 kWh rules out clean agent: Table 7E's Notes 10 and 12 read differently, and BIS has issued no clarification Flamekite found.
- Whether a data centre's UPS battery bank counts as a battery energy storage system connected to the electricity system under the CEA's 2026 amendment.
- Which petroleum class diesel (HSD) falls in: PESO's documents list diesel as needing a licence but do not name its class.
- The texts of IS 15493 and the other gaseous suppression standards: BIS sells them, and Flamekite has not read them.
- Any national MeitY guideline with fire rules for data centres: none in force was found.
- Whether any state fire service has adopted NBCS 2026 Annex F for data centre NOCs: none was found.
Questions about fire NOCs for data centres
Is a fire NOC required for a data centre?
- Yes, once the building crosses your state's business building line: over 15 m or 5 storeys in Delhi, a floor over 500 m² in Haryana, 21 m in Karnataka, any size in Uttar Pradesh. Sikkim and Meghalaya name data centres, but under business.
Which NBC occupancy is a data centre?
- Group E business. NBC 2016 put electronic data processing centres in E-3 with IT parks and call centres; NBCS 2026 gives data centres their own subdivision, E-II, a machine environment, with Annex F.
Which fire suppression does a server room need?
- NBCS 2026 Table 9 marks clean agent gas, water mist and pre-action sprinklers suitable for server rooms and data halls, with aspirating smoke detection. Annex F prefers clean agents such as heptafluoropropane or fluorinated ketone in data halls.
Can clean agent be used in a lithium-ion battery room?
- No, by NBCS 2026 Table 9: clean agent and water mist are marked not suitable for a lithium-ion battery room. Note 15 asks wet or single-interlock pre-action sprinklers, treating the whole room as the area of operation.
Do data centre policies relax fire rules?
- No. Uttar Pradesh, Tamil Nadu, Haryana and Odisha relax FAR, height, parking or approval times, but UP makes stacked DG sets subject to a fire NOC and Tamil Nadu keeps windows and height within fire safety regulations.
How much diesel can a data centre store without a PESO licence?
- Class B petroleum up to 2,500 litres non-bulk, in receptacles of at most 1,000 litres, and Class C up to 45,000 litres, per PESO's Petroleum Rules SOP. Above that, a licence from the District Authority or PESO.
Do the CEA battery rules apply to data centres?
- The CEA's battery storage chapter applies from 1 April 2027 to stationary storage connected to the electricity system, in detail above 650 V. It does not say whether a data centre UPS battery bank is such a system.
How long can the exit route be in a data centre?
- 60 m in a sprinklered data centre building under NBCS 2026 Table 4; the table gives no unsprinklered figure, because Table 6 expects data centres to be sprinklered, with compartments up to 2,000 m².
Keep reading
- Fire NOC in IndiaWho needs a fire NOC, how to apply and the rules in every state.
- Fire NOC by buildingLines for every building type, state by state.
- Fire NOC for officesIT offices, call centres and the office floors that host server rooms.
- Fire NOC for commercial buildingsBusiness and mercantile rows of NBC Table 7.
- Fire NOC feesAll published rates side by side.
- Fire NOC validityEvery state's term and renewal date.
- Documents for a fire NOCWhat each state asks you to upload.
- Fire NOC penaltiesEvery state's penalty ladder.
Free tools for this
Words on this page, explained
Keep exploring
Fire NOC for other fuel, power and special buildings
Fire NOC: the steps
Sources
Each source was opened and read on the date shown. How Flamekite checks its sources
- Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 National Building Construction Standards, Part F: Annex F Requirements for data centres (F-1 to F-9, printed pages 152 to 155) and clause 3.1.6 Group E with subdivision E-II, read off the page images (opens in a new tab)
- Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 Part F, Table 7E business buildings: row (b) Data Centres (Machine Environment) and Notes 3 to 16, printed pages 76 to 78, read off the page images (opens in a new tab)
- Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 Part F, Table 9 Fire detection and suppression systems: rows for UPS rooms, lithium-ion battery rooms, server rooms and data halls, network and electrical rooms, printed page 103, read off the page image (opens in a new tab)
- Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 Part F: Table 2 occupant load for datacentres (p.40), Table 4 travel distance (p.45), Table 6 compartment areas (p.55), clause 4.5.3.2 two-hour utility rooms, clause 4.2.19.1 basements and clause 3.5.5.4 DG rooms, tables read off the page images (opens in a new tab)
- Bureau of Indian Standards (BIS-licensed copy hosted by Nagpur Municipal Corporation): National Building Code of India 2016, Part 4 Fire and Life Safety: clause 3.1.6 (Group E, E-1 to E-5), 3.4.7.4 exit signs, 3.4.8 air handling and ducts, 3.4.10 glazing, 3.4.11 surface interior finishes, 4.3 and Table 3 occupant load, 4.4 egress, Tables 4 and 5, 6.5 business buildings, Annex D fire drills and Fire Safety Plan, Annex E high-rise (read off the page images, pp. 15, 24 to 26, 29 to 32, 64, 65, 81 to 84, 87 and 88) (opens in a new tab)
- Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 National Building Construction Standards 2026, Part F: Fire and Life Safety (opens in a new tab)
Show all 54 sourcesShow fewer
- Assam Gazette Extraordinary No. 427, 14 August 2026 (PRS copy of the gazette): The Assam Jan Vishwas (Amendment of Provisions) Act, 2026 (Assam Act No. XIII of 2026): Schedule item 4 amending sections 2, 20, 21 and 31 of the 2025 Act (opens in a new tab)
- Uttar Pradesh Gazette Extraordinary, 27 August 2026, English translation (copy hosted by TeamLease RegTech): Uttar Pradesh Occupational Safety, Health and Working Conditions Rules, 2026, Notification No. 962/XXXVI-03-2026-1903305: rules 12, 16, 43, 45, 46, 47 and 127 (opens in a new tab)
- Department of IT and Electronics, Government of Uttar Pradesh (copy hosted by UP Learning Centre): Uttar Pradesh Data Centre Policy 2026, notified by G.O. No. 536/78-2-2026/E-105226 of 9 July 2026: paras 6.1, 6.10, 8.2 and 8.3 (special provisions in building norms) (opens in a new tab)
- Department of IT and Electronics, Government of Uttar Pradesh (copy hosted by Invest UP): Uttar Pradesh Data Center Policy 2021 (First Amendment 2022), as updated by G.O. No. 1399/78-2-2021/10(M)/2021 of 7 November 2022: paras 5.4, 6 and 8.3 (opens in a new tab)
- Information Technology Department, Government of Tamil Nadu (copy hosted by the National Single Window System): Data Centre Policy of Tamil Nadu 2021, approved by G.O.(Ms.) No. 33 of 23 November 2021: eligibility, single window, para 3.6 and para 5 Building Regulations (opens in a new tab)
- Department of IT, Electronics and Communication, Government of Haryana (scanned copy hosted by Haryana IT): Haryana State Data Center Policy, 2022, notified 7 July 2022: para 5 eligibility and validity, para 6.5.2 pre-commencement and commencement approvals and essential services (scan, read off the page images) (opens in a new tab)
- Electronics and IT Department, Government of Odisha: Odisha Data Centre Policy 2022 (approved): para 9 power, para 13 incentives (building fees subsidy, electricity duty) and non-fiscal incentives (essential services) (opens in a new tab)
- Central Electricity Authority (Gazette of India Extraordinary, Part III Section 4, No. 231): CEA (Measures relating to Safety and Electric Supply) Amendment Regulations, 2026, F. No. CEA-PS-16/1/2021-CEI Division, gazetted 30 March 2026, in force 1 April 2027 (scanned copy) (opens in a new tab)
- Petroleum and Explosives Safety Organisation (PESO): Petroleum Rules 2002: standard operating procedure (no licence limits, bulk and non-bulk, licence forms and licensing authorities) (opens in a new tab)
- Petroleum and Explosives Safety Organisation (PESO): Requirement of licence under Petroleum Rules, 2002 for storage of petroleum: classes A, B and C, and products including diesel (HSD) (opens in a new tab)
- Uttar Pradesh Gazette Extraordinary, 13 December 2022 (copy hosted by PRS Legislative Research): Uttar Pradesh Fire and Emergency Services Act, 2022 (U.P. Act No. 16 of 2022), English translation: sections 1, 26 to 29, 33 to 39, 45, 48, 58 and 66 (opens in a new tab)
- Government of Haryana (PRS copy): Haryana Fire and Emergency Services Act, 2022 (Act 14 of 2022) (opens in a new tab)
- Government of Sikkim, Sikkim Government Gazette Extraordinary No. 466, 17 December 2025: The Sikkim Fire and Emergency Services Rules, 2025: Home Department notification No. 99/Home/2025, 17 December 2025, under section 63 of Act 4 of 2023, with Schedules I to V and Forms A1 to A20 (opens in a new tab)
- Industries and Commerce Department, Haryana (Haryana Government Gazette Extraordinary No. 203-2023): Notification No. 02/13/2023-4IB-II of 22 November 2023: data centres under the Haryana State Data Center Policy 2022 declared a separate Infrastructure Industry (opens in a new tab)
- Uttar Pradesh Gazette Extraordinary, 18 January 2024 (copy hosted by UP Fire and Emergency Services): Uttar Pradesh Fire and Emergency Services Rules, 2024, Notification No. 181/VI-Pu-8-2024-801(1)-2023: rules 40 to 56, 65, 66 and 72, Schedules VI and VII, Forms A-4, A-8 and A-11 to A-13 (opens in a new tab)
- Delhi Fire Service (copy of Delhi Gazette Extraordinary, Part IV): Delhi Fire Service (Amendment) Rules, 2025, notification F.No. DFS/HQ/Misc/2025/01(E-259159)/237, gazetted 26 May 2026 (opens in a new tab)
- Government of Karnataka (PRS copy): Karnataka Fire Force (Amendment) Ordinance, 2023: section 13(3) high-rise NOC (opens in a new tab)
- Telangana State Disaster Response and Fire Services Department: Circular Memorandum Rc.No.4039-2/EODB/2015, 5 March 2016: revision of the period of renewal of NOC, risk categories and random inspections (quotes section 13 of the Fire Service Act, 1999) (opens in a new tab)
- Home Department, Government of Odisha: Odisha Fire Prevention and Fire Safety (Amendment) Rules, 2019, notification No. 10573/H of 6 March 2019: rule 9(1) classes, rules 10, 13(3) and 22(5) (opens in a new tab)
- Urban Development, Housing and Local Self Government Departments, Rajasthan: Joint order No. P.11(9)UDH/2020 Part, 14 September 2023, on the fire safety certificate and fire NOC (18-page Hindi scan) (opens in a new tab)
- Local Self Government Department, Government of Kerala (Kerala Gazette Extraordinary No. 3808): Kerala Municipality Building (Amendment) Rules, 2025 (G.O.(P) No.53/2025/LSGD, S.R.O. No.1240/2025, 29 October 2025) and Kerala Panchayat Building (Amendment) Rules, 2025 (G.O.(P) No.54/2025/LSGD): rule 5(4) restated, rules 35 and 36 (opens in a new tab)
- Government of Maharashtra (copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023 (Mah. Act No. XXIV of 2023), first published 11 May 2023 (opens in a new tab)
- Seva Sindhu, Government of Karnataka: Application for No Objection Certificate (High rise Building) - Fire & Emergency: documents, fee under G.O. of 13-09-2019, 60 working days (opens in a new tab)
- Fire and Emergency Services, Meghalaya: Annexure B1 to notification HPL.179/2017/85: institutional, assembly and business buildings (opens in a new tab)
- Municipal Corporation Chandigarh, Fire and Rescue Services: Office Order No. 23 of 10 February 2025: Fire Safety Certificate charges by NBC occupancy group from 1 April 2025, validity 3 years, exemptions (read from the page images) (opens in a new tab)
- Government of Telangana, Home (Ser.IV) Department: G.O.Ms.No.142, Home (Ser.IV), 9 August 2016: fire precaution fee amending the Levy of Fee Rules, 2006 (opens in a new tab)
- Odisha Fire and Emergency Service: Service details: Fire Safety Recommendation under rule 12 (fee Rs 1 or Rs 2 per m² through IFMS; 7 documents) (opens in a new tab)
- Uttar Pradesh Fire and Emergency Services: Dashboard: provisional, final and renewal applications, approvals and days to certificate (printed 24 October 2026) (opens in a new tab)
- Guidance Tamil Nadu, Tamil Nadu Single Window Portal: No Objection Certificate for Multi Storied Buildings (18.3 m and above) from TNFRS: procedure, documents, timelines and fees (opens in a new tab)
- Directorate of Urban Local Bodies, Haryana (Wayback Machine copy of 18 February 2026; the live page now returns 404): Approval or Renewal of Fire NOC: no fee, 60 days under the Right to Service Act 2014, checklist above 15 m, 48-hour inspection upload (opens in a new tab)
- Government of Maharashtra (gazette copy hosted by Maharashtra Fire and Emergency Services): Maharashtra Fire Prevention and Life Safety Measures Act, 2006, English gazette of 5 February 2007 (sections 3, 8, 36 to 38 read off the page images) (opens in a new tab)
- Gujarat Government Gazette (copy hosted by PRS Legislative Research): Gujarat Fire Prevention and Life Safety Measures Act, 2013 (Guj. Act 11 of 2013), Gazette Extraordinary of 1 April 2013, with Gujarat Act No. 5 of 2021 appended (Gazette of 23 March 2021) (opens in a new tab)
- Assam Gazette Extraordinary No. 811, 24 December 2025 (PRS copy of the gazette): The Assam Fire and Emergency Services Act, 2025 (Assam Act No. LIII of 2025), notification No. LGL.52/2025/3: sections 1 to 67 and Schedule I (opens in a new tab)
- Petroleum Act, 1934 as amended (consolidated copy hosted by the Appellate Tribunal for Electricity): The Petroleum Act, 1934 (Act 30 of 1934): section 2 classes A, B and C, sections 7 and 8 (storage without a licence) and section 23 (penalties) (opens in a new tab)
- Gazette of India (copy hosted by PRS Legislative Research): Occupational Safety, Health and Working Conditions Code, 2020 (Act 37 of 2020): sections 1(3) (government offices excluded), 2(1)(v) establishment, 2(1)(zzl) worker, 6(1) employer duties and 94 general penalty (opens in a new tab)
- IT and Electronics Anubhag-2, Government of Uttar Pradesh (copy hosted by Invest UP): Notification No. 115/LXXVIII-2-2022/1599060 of 11 October 2022: data centre industries under the UP Data Centre Policy 2021 declared an essential service under the UP Essential Services Maintenance Act 1966 (opens in a new tab)
- Gazette of India (Bureau of Indian Standards notification): Gazette of India Extraordinary, Part III Sec 4, No. 299, 30 April 2026: SP 7:2026 established, SP 7:2016 withdrawn (Ref HQ-PUB013/1/2020-PUB-BIS (1529)) (opens in a new tab)
- Department of Fire and Emergency Services, Government of West Bengal: Notification 1930/FES/O/MISC-08/2023, 1 March 2024: 12 occupancies moved to yearly self-certification (with forwarding letter 1961 of 5 March 2024) (opens in a new tab)
- Government of Bihar, Home Department notification (English copy hosted by Bihar Fire Service): Bihar Fire Service Rules, 2021: rules 14 to 27, 33, 34 and 38, Schedules C (fees), D (online NOC), E (pandals) and H (existing buildings) (opens in a new tab)
- Gazette of India, Ministry of Home Affairs (copy hosted by TaxHeal): S.O. 2264(E) of 6 May 2026: the Haryana Fire and Emergency Services Act, 2022 extended to the Union territory of Chandigarh, with modifications (opens in a new tab)
- Gujarat Fire Safety Compliance Portal (GujFireSafety CoP): Gujarat Fire Prevention and Life Safety Measures Regulations, 2023 (fees in Annexure 8) (opens in a new tab)
- Home (Police) Department, Government of Meghalaya: Notification No. HPL.127/2023/43 of 26 September 2024: compulsory fire NOC for hotels, lodges, homestays, resorts and business buildings in Shillong city and adjoining areas (opens in a new tab)
- Andhra Pradesh Legislative Assembly (PRS copy of AP Gazette Part IV-A No. 12, 4 March 2026): Andhra Pradesh Fire Service (Amendment) Bill, 2026 (L.A. Bill No. 12 of 2026): new section 13 thresholds, 21-day and 30-day timelines (opens in a new tab)
- WBXPress (legal database): Fire NOC fees, West Bengal Fire and Emergency Services (2020 notification) (opens in a new tab)
- Casemine (secondary copy of the Act text): Delhi Fire Service Act, 2007: sections 29, 31, 37, 44, 49, 52 and 54 (opens in a new tab)
- Elion Technologies (consultant's blog): Data centre fire safety requirements India 2026 (4 June 2026): the claims this page checks against NBCS 2026 (opens in a new tab)
- Business Today: Delhi data centre fire raises fears of data loss, disrupts cloud services: report (24 June 2026) (opens in a new tab)
- W.Media: Tata Communications recovers majority of data following Next-Gen Tower fire (30 June 2026) (opens in a new tab)