IS 2189:2026: the fire detection and alarm code, with its detector spacing, call point and maintenance values
Updated By Flamekite Editorial DeskFacts checked against official sources on
Quick answer
IS 2189:2026 is the Indian code of practice for choosing, installing and maintaining automatic fire detection and alarm systems. It is the fifth revision, published in March 2026 by the Fire Fighting Sectional Committee, CED 22, and it replaced IS 2189:2008, which BIS withdrew on 17 September 2026.
The values most searched are in clauses 6.3 and 6.4: a smoke detector at 7.5 m and a heat detector at 5.3 m on a flat ceiling up to 7 m and 5 m high, manual call points 1.4 m above the floor and no more than 30 m of travel from anyone, and detector cleaning at least every 3 months (cl. 7.5). No Quality Control Order makes the code compulsory, so it binds only through a rule, NOC condition or contract that names it.
Free, on WhatsApp. Or a free fire NOC check
IS 2189:2026 at a glance: 12 facts
| What | The rule | Source |
|---|---|---|
| Title | Selection, Installation and Maintenance of Automatic Fire Detection and Alarm System, Code of Practice | BIS record |
| Edition | Fifth revision, March 2026; first published 1962, revised 1976, 1988, 1999 and 2008 | BIS, IS 2189:2026 |
| Committee | Fire Fighting Sectional Committee, CED 22, of the Civil Engineering Division | BIS record |
| Replaces | IS 2189:2008, withdrawn on 17 September 2026 after 6 months alongside the 2026 edition | BIS standards database |
| Scope | Planning, design, selection, installation and maintenance, from a few call points to addressable panels, including industry (cl. 1.1); it sets a minimum level of protection (cl. 1.2) | BIS, IS 2189:2026 |
| Not covered | The ancillary services a detection signal triggers, such as sprinklers or smoke control (cl. 1.1); detection is not a substitute for automatic extinguishing (foreword) | BIS, IS 2189:2026 |
| Zone size | At most 2,000 m2 conventional and 3,000 m2 addressable; search distance at most 30 m (cl. 4.4.2) | BIS, IS 2189:2026 |
| Panel | In the entrance lobby, in plain view, never in a small lockable room or shaft (cl. 4.6) | BIS, IS 2189:2026 |
| Wireless | Allowed as fully wireless or hybrid, on licence-exempt bands such as 865 to 867 MHz and 2.4 GHz (cl. 4.9) | BIS, IS 2189:2026 |
| Product standards | Detectors, call points, sounders and power supplies follow the IS/ISO 7240 parts, such as Part 11 for call points and Part 3 for audible alarms | BIS, IS 2189:2026 |
| Compulsory BIS mark | None: no Quality Control Order for detection or alarm products was on BIS's list on 24 October 2026 | BIS compulsory list |
| Where it is named | Maharashtra's October 2026 circular on wireless detection refers to IS 2189:2026, and its July 2026 Form B guidelines still named the 2008 edition | MFS circular 1420 |
IS 2189:2026 and the standards beside it: who covers what
| Option | Type | What it covers | Its role next to IS 2189:2026 | Source |
|---|---|---|---|---|
| IS 2189:2026 | Code of practice | Selection, siting, installation, testing and maintenance of the whole detection and alarm system | The design and upkeep code | BIS, IS 2189:2026 |
| IS/ISO 7240 Part 5:2018 and Part 7:2023 | Product standards | Point-type heat detectors; point-type smoke detectors | Product requirements for the detectors that IS 2189 places | BIS, SP 7:2026 |
| IS/ISO 7240 Part 11:2011 | Product standard | Manual call points | Required by cl. 6.4(a) for every call point | BIS, SP 7:2026 |
| IS/ISO 7240 Part 3 and Part 23 | Product standards | Audible alarm devices; visual alarm devices | Required by cl. 4.5.1 and cl. 4.5.6 for sounders and beacons | BIS, IS 2189:2026 |
| IS 15908:2021 | Product standard | Control and indicating equipment, the alarm panel | Panel product standard; the 2011 edition was withdrawn on 14 March 2022 | BIS standards database |
| SP 7 (Part 4) | Building code part | Fire and life safety part of the National Building Code | Cl. 4.7 sends the fire command centre to it | BIS, IS 2189:2026 |
| IS 12456 | Application standard | Fire protection of electronic data processing equipment in air-conditioned areas, as named in cl. 6.5 | Prevails over IS 2189:2026 where the two differ | BIS, IS 2189:2026 |
| IS 11360:1985 and IS 2175:1988 | Withdrawn products | Old smoke and heat detector product standards | Withdrawn on 18 July 2025; detector products now follow IS/ISO 7240 | BIS standards database |
How to check a fire alarm system against IS 2189:2026: 6 steps
Name the edition
Write IS 2189:2026 on the drawing, AMC and audit report; the 2008 edition was withdrawn on 17 September 2026.
Check zones
Confirm no zone exceeds 2,000 m2 (conventional) or 3,000 m2 (addressable) and no search distance exceeds 30 m (cl. 4.4.2).
Check detector siting
Measure ceiling height against the 7 m and 5 m limits, then check the 100 m2 and 50 m2 cross-check and the 500 mm and 1.5 m clearances (cl. 6.3).
Check call points and sounders
Call points at 1.4 m and within 30 m of travel; sound level at least 75 dB(A) at the bed head and never above 120 dB(A) (cl. 6.4, 4.5).
Check the panel
Panel in the entrance lobby, device numbers recorded, latest drawing on the wall of the command centre (cl. 4.6, 4.7, 6.1).
Check records
Log book, daily and quarterly checks, yearly tests, 3-month cleaning and any written impairment notices (cl. 7.4, 7.5).
Smoke and heat detector spacing in IS 2189:2026
On a flat ceiling the code lists 7.5 m for a smoke detector and 5.3 m for a heat detector, valid only up to 7 m and 5 m of ceiling height (cl. 6.3.2.1 and 6.3.3.1).
| Clause | Smoke detector | Heat detector | |
|---|---|---|---|
| Listed distance, flat ceiling BIS, IS 2189:2026 | 6.3.2.1 | 7.5 m | 5.3 m |
| Spacing valid up to a ceiling height of BIS, IS 2189:2026 | 6.3.3.1 | 7 m | 5 m |
| Spacing at the next height band BIS, IS 2189:2026 | 6.3.3.1 | 5 m for 7 m to 10 m | 3.5 m for 5 m to 10 m |
| Above 10 m BIS, IS 2189:2026 | 6.3.3.1 | Beam or aspirating detectors only | Heat detectors prohibited; beam or flame detectors |
| Corridor narrower than 2 m BIS, IS 2189:2026 | 6.3.2.8 | 12 m apart | 8 m apart |
| Sensing element below the ceiling BIS, IS 2189:2026 | 6.3.2.1 | 25 mm to 600 mm | 25 mm to 150 mm |
| Cross-check on the finished layout BIS, IS 2189:2026 | 6.3.4 | At least 1 per 100 m2 | At least 1 per 50 m2 |
| Pitched roof, apex over 600 mm BIS, IS 2189:2026 | 6.3.2.2 | 7.5 m to 8.5 m near the apex | Not set separately |
Heat-detector coverage is a design value, not a smoke-detector coverage in m2: the code frames spacing as a distance and adds a 0.7 factor for the furthest point (cl. 6.3.4(b)). Work the layout from the standard.
Manual call point height and distance in IS 2189:2026
Clause 6.4 puts manual call points 1.4 m above the floor and within 30 m of travel from every person, 45 m where they are also outside the building.
The call point must comply with IS/ISO 7240 Part 11 (cl. 6.4(a)). It sits where it is easy to reach, well lit and unobstructed, preferably near stair entries on each level, and may need a shorter travel distance where access is difficult or the risk is dangerous (cl. 6.4(c), (d), (g)).
Where a call point cannot be seen from the front, as in a long corridor, it is surface mounted or semi-recessed so that at least 15 mm of its side shows (cl. 6.4(e)). The enclosure is dust and moisture proof (cl. 6.4(f)).
A breakable glass element must be at least 30 cm2 and not thicker than 2 mm. Once it breaks, the alarm sounds on the floor and at the panel, an indicator lights, and the panel keeps the alarm even if the button is pressed again (cl. 6.4(h)).
| What | The rule | Source |
|---|---|---|
| Height above floor | 1.4 m (cl. 6.4(d)) | BIS, IS 2189:2026 |
| Maximum travel to a call point | 30 m inside; 45 m where call points are also fitted outside (cl. 6.4(b)) | BIS, IS 2189:2026 |
| Visible side profile if not seen from the front | At least 15 mm (cl. 6.4(e)) | BIS, IS 2189:2026 |
| Glass area and thickness | At least 30 cm2 and at most 2 mm (cl. 6.4(h)) | BIS, IS 2189:2026 |
| Annual test (Table 4) | Operate every call point once a year; on this page the same test list is in the maintenance section | BIS, IS 2189:2026 |
Fire alarm zone size and sounder levels in IS 2189:2026
Zones are capped by area and search distance, and sounders by decibel level, spacing and mounting height.
2,000 m2
largest single zone, conventional system (cl. 4.4.2(a)) BIS, IS 2189:2026
3,000 m2
largest single zone, addressable system (cl. 4.4.2(a)) BIS, IS 2189:2026
30 m
longest search distance inside a zone, in a straight line (cl. 4.4.2(d)) BIS, IS 2189:2026
75 dB(A)
minimum at the bed head with doors shut, and the basis for sounder spacing (cl. 4.5.2, 4.5.3) BIS, IS 2189:2026
120 dB(A)
ceiling for sound level in occupied areas (cl. 4.5.3) BIS, IS 2189:2026
30 m
largest hooter centre-to-centre distance (cl. 4.5.2) BIS, IS 2189:2026
2,290 mm
least height of a wall hooter above the finished floor (cl. 4.5.2) BIS, IS 2189:2026
300 m2
total building area below which one zone may cover more than one floor (cl. 4.4.2(b)) BIS, IS 2189:2026
Where IS 2189:2026 wants a detector: stairs, shafts, voids and beams
Clause 6.3.2.6 and 6.3.2.7 list the places beyond the open ceiling where a detector is needed, and the obstructions that change where it can sit.
If An enclosed staircase
A detector at the top of the stairway and on each main landing (cl. 6.3.2.6(a)). Stairwells, lift wells and shafts are each a separate zone (cl. 4.4.2(e)). BIS, IS 2189:2026
If An open staircase, lift, escalator or hoist shaft
A detector at each level within 1.5 m of the floor penetration; a detector in the lift machine room (cl. 6.3.2.6(b), (d)). BIS, IS 2189:2026
If A false ceiling or floor void
Voids over 800 mm are protected like a normal ceiling; voids under 800 mm need cover only if fire products can spread through them; concealed spaces under 5 m2 need none (cl. 6.3.2.6(j), (k)). Bathrooms and WCs need not be protected. BIS, IS 2189:2026
If Cable tunnels, ducts, AHU rooms and distribution boards
A detector in each (cl. 6.3.2.6(e)); every room or cabin also gets one at ceiling level and under a false ceiling (cl. 6.3.2.6(f)). BIS, IS 2189:2026
If A structural beam or duct deeper than 250 mm
No detector within 500 mm of it (cl. 6.3.2.7(a)); a beam deeper than 10 percent of the ceiling height makes each bay its own enclosure (cl. 6.3.2.7(d)). BIS, IS 2189:2026
If A shallower obstruction, up to 250 mm deep
Keep a detector at least twice the obstruction's depth away from it (cl. 6.3.2.7(c)). BIS, IS 2189:2026
If An air supply inlet
At least 1 m away under cl. 6.3.2.7(e), but 1.5 m under cl. 6.3.3.2(b); use the larger distance until your fire office says otherwise. BIS, IS 2189:2026
Fire alarm system maintenance as per IS 2189:2026
Clause 7.4 and Table 4 split upkeep between the user, who checks daily to quarterly, and a competent contractor, who tests yearly; detectors are cleaned at least every 3 months.
Daily (cl. 7.4.3)
The user checks that the panel shows normal, that yesterday's faults are logged and being fixed, and that the panel is not dead from a blown fuse, bad supply or someone switching it off. BIS, IS 2189:2026
Weekly (cl. 7.4.4)
A review of the week's events to confirm each was handled correctly and that the system still works with all its features. BIS, IS 2189:2026
Every 3 months at most (cl. 7.5)
Detectors are cleaned of dust and insects, following the maker's method and with sensitivity checks afterwards. BIS, IS 2189:2026
Quarterly (cl. 7.4.5)
The user reviews the log book, tests batteries and connections, operates a trigger device in each zone, tests the sounders and any remote link, and confirms a clear radius of at least 750 mm below every detector. BIS, IS 2189:2026
Twice a year (Table 4)
Smoke detector sensitivity test and flame and spark detector checks; manual call points and heat detectors fall due in the yearly round below. BIS, IS 2189:2026
Yearly (Table 4)
Functional test of every smoke detector in place, heat detectors by a heat source or as the maker directs, and every manual call point operated. BIS, IS 2189:2026
Yearly, power (Table 4)
Disconnect mains power and check the trouble signal; run the general alarm for at least 5 minutes, and voice systems for at least 15 minutes. BIS, IS 2189:2026
On any impairment (cl. 7.4.6.2)
If a deficiency is not fixed at the end of testing, the owner is told in writing within 24 hours. BIS, IS 2189:2026
IS 2189:2026 versus IS 2189:2008: what changed
IS 2189:2026 is the fifth revision and replaced the 2008 edition, which BIS withdrew on 17 September 2026.
Current
IS 2189:2026
Published March 2026 as the fifth revision. It contains clause 4.9 on wireless systems, clause 6.3.2.9 on positive alarm sequence, an IoT health monitoring option (cl. 7.1.2, 7.3.1) and a fire command centre clause (cl. 4.7). BIS, IS 2189:2026
Withdrawn 17 September 2026
IS 2189:2008
The fourth revision. Its foreword in the 2026 text lists the 2008 additions as terminology, a probe-type high-temperature bi-metal heat detector, optical smoke, spark and ember, UV and IR flame detectors, and figures for smoke detector arrangement and addressable systems. BIS standards database
Superseded
Earlier editions
First published in 1962 and revised in 1976, 1988 and 1999. The foreword names no 2006 edition, although some web pages label old values that way. BIS, IS 2189:2026
Positive alarm sequence under IS 2189:2026 clause 6.3.2.9
Positive alarm sequence lets trained staff investigate a first alarm for up to 180 seconds before general evacuation sounds, and only where the AHJ approves it.
Where it may be used
Occupancies with trained staff on site, such as hospitals, hotels, business buildings, campuses and industrial buildings (cl. 6.3.2.9.2). Not in high-risk industrial or hazardous storage areas, or buildings without trained supervisors. BIS, IS 2189:2026
Stage 1: the first detector operates
The alarm reaches the panel and a continuously attended point, and public evacuation alarms stay inhibited (cl. 6.3.2.9.3(a)). BIS, IS 2189:2026
Stage 2: investigation, 180 seconds at most
Trained staff check the cause; the AHJ may permit a longer period (cl. 6.3.2.9.3(b)). BIS, IS 2189:2026
Stage 3: confirmation or timeout
A second detector, or any manual call point, starts full evacuation at once; so does a timer that runs out without acknowledgement (cl. 6.3.2.9.3(c)). BIS, IS 2189:2026
Fail-safe rules
Any fault, power failure or control malfunction triggers full alarm, and the sequence never inhibits call points, waterflow switches, or the signal to the brigade or remote monitoring (cl. 6.3.2.9.5). BIS, IS 2189:2026
Wireless fire alarm systems under IS 2189:2026 clause 4.9
Clause 4.9 allows fully wireless or hybrid systems on licence-exempt bands, as long as supervision, fault monitoring and alarm integrity equal a wired system.
Do
- Use licence-exempt bands permitted in India, such as 865 to 867 MHz, 868 MHz and 2.4 GHz, and equipment that meets WPC rules (cl. 4.9.6). BIS, IS 2189:2026
- Keep components compatible with the IS/ISO 7240 requirements and make hybrid systems perform as a wired one does (cl. 4.9.2). BIS, IS 2189:2026
- Verify radio reliability, power supply and battery life, interference immunity and supervision intervals, and hand the test papers to the AHJ on request (cl. 4.9.3, 4.9.5). BIS, IS 2189:2026
- Consider wireless for heritage buildings, temporary structures, retrofits and large campuses where cabling is impractical (cl. 4.9.7). BIS, IS 2189:2026
Don’t
- Assume a state accepts it everywhere: Maharashtra's circular 1420 of 16 October 2026 accepts wireless detectors under clause 4.9 but not in high-rise buildings. MFS circular 1420
- Rely on the standard to cap frequency, power, device count or topology: the code takes a performance-based approach and sets no such limits (cl. 4.9.4). BIS, IS 2189:2026
Myths about IS 2189 and fire alarm detectors
Five common claims about IS 2189 that the 2026 text does not support.
You may have read
IS 2189:2008 is still the current code.
Myth
What the sources say
BIS withdrew the 2008 edition on 17 September 2026; IS 2189:2026 is the only edition, though Maharashtra's July 2026 guidelines still named the old one. BIS standards database
You may have read
IS 2189 is compulsory because the BIS mark is.
Myth
What the sources say
The code is a code of practice. No Quality Control Order covered detectors, panels or alarms on 24 October 2026; it binds only when a rule, NOC condition or contract names it. BIS compulsory list
You may have read
A fire alarm replaces sprinklers.
Myth
What the sources say
The foreword says automatic detection is no substitute for automatic sprinklers or other extinguishing systems. BIS, IS 2189:2026
You may have read
A can of test spray proves a smoke detector is sensitive.
Myth
What the sources say
Clause 7.2.7 asks for a calibrated sensitivity test, and a note says an unmeasured dose of aerosol cannot test sensitivity. A smoke-entry test is separate. BIS, IS 2189:2026
You may have read
Heat detectors are fine for escape routes and offices.
Myth
What the sources say
Clause 5.3.2.1 calls heat detectors unsuitable for life safety and air-conditioned premises; they suit kitchens, pantries and low-value closets. BIS, IS 2189:2026
IS 2189:2026 traps: values that differ between clauses
Four places where the 2026 text gives two values or an ambiguous one, so the safer reading matters.
If Air inlet distance is 1 m in cl. 6.3.2.7(e) and 1.5 m in cl. 6.3.3.2(b).
Keep 1.5 m unless your fire office accepts 1 m in writing. BIS, IS 2189:2026
If Clause 6.3.2.1 mixes a listed distance of 7.5 m and 5.3 m with a circle-radius sentence that reads unclearly.
Use 7.5 m and 5.3 m as the listed spacing and apply the 0.7 factor in cl. 6.3.4(b) to the furthest point; confirm with the consultant. BIS, IS 2189:2026
If High air movement shortens spacing: the factor falls from 1.00 below 7.5 air changes an hour to 0.50 at 30 changes for smoke detectors (cl. 6.3.3.2).
Take the air-change rate from the HVAC design, and keep the detector count worked as if the air handlers were off. BIS, IS 2189:2026
If A contract or audit report quotes a 20 percent yearly sample or 5-year cycle 'as per IS 2189'.
The 2026 Table 4 tests every smoke detector in place each year; a sampling rule is from state guidelines, not the code. Ask for the clause. BIS, IS 2189:2026
IS 2189 terms: zone, search distance, AHJ, FACIE and stratification
Six terms from the 2026 text that tenders and audit reports use.
- Detection zone
- A sub-division of the protected premises that raises one fire indication, capped at 2,000 m2 conventional and 3,000 m2 addressable (cl. 4.4.2). BIS, IS 2189:2026
- Search distance
- The straight-line distance a responder walks after entering a zone to find the fire by eye; 30 m at most (cl. 4.4.2(d)). BIS, IS 2189:2026
- AHJ
- The authority having jurisdiction, in practice your fire office; it approves the device count, zoning and cable routes and must permit later changes (cl. 7.1.3). BIS, IS 2189:2026
- FACIE
- Fire alarm control and indicating equipment, the panel that receives signals and runs the sequence (cl. 6.3.2.9.3). BIS, IS 2189:2026
- Stratification
- Smoke that stops below the ceiling; the level is found by measuring the vertical smoke gradient and extra detectors fitted below it if the site test shows need (cl. 6.2). BIS, IS 2189:2026
- Positive alarm sequence
- Delayed general evacuation of at most 180 seconds while trained staff investigate the first alarm (cl. 6.3.2.9). BIS, IS 2189:2026
IS 2189:2026 applied: a 1,000 m2 office, a ward, a data hall and a 12 m atrium
Flamekite’s working from the official rules; no government publishes this figure.
Four worked readings of the clauses. They are Flamekite's own arithmetic from the code's values, not design drawings.
Case 1
Open office floor
1,000 m2 flat ceiling, 3 m high, one conventional zone
What applies The 100 m2 cross-check (cl. 6.3.4) needs at least 10 smoke detectors, and each must meet the 7.5 m limit; the 2,000 m2 zone ceiling is not exceeded (cl. 4.4.2(a)). Offices follow /fire-noc/offices for the NOC side. BIS, IS 2189:2026
Case 2
Hospital ward with a trained night team
Staffed ward corridor under 2 m wide
What applies Corridor spacing may stretch to 12 m for smoke (cl. 6.3.2.8(a)); positive alarm sequence may be proposed, with AHJ approval (cl. 6.3.2.9.2), and an engineer must be on call 24 hours (cl. 7.3.2). BIS, IS 2189:2026
Case 3
Data hall with high-value equipment
Electronic equipment in an air-conditioned room
What applies Aspirating or multi-criteria detection is preferred (cl. 5.4.2) and IS 12456 prevails where it differs (cl. 6.5). BIS, IS 2189:2026
Case 4
Atrium 12 m high
Ceiling above 10 m
What applies Point smoke detectors fall outside the table (cl. 6.3.3.1): beam or aspirating detectors only, and heat detectors are prohibited. BIS, IS 2189:2026
IS 2189:2026 details this page could not confirm
Gaps are listed rather than guessed.
- Which clauses are new in 2026: the 2026 foreword lists no changes, and the 2008 text was not compared, so the options section above says what the 2026 edition contains, not what it added.
- Whether 7.5 m and 5.3 m are a spacing or a radius: clause 6.3.2.1 reads both ways, so no m2 coverage per detector is stated here. BIS, IS 2189:2026
- The exact publication date of 17 March 2026 is carried from the BIS database record used on /is-codes; the BIS record page read for this page shows no date. BIS standards database
- Which state fire rules name IS 2189:2026: only Maharashtra's October 2026 circular was found; others may cite the 2008 edition. Maharashtra Fire Services
- Annexes, figures and the full Table 3 and Table 4 are not reproduced; read them in the standard, free after registration with BIS. BIS, IS 2189:2026
Questions about IS 2189:2026
What is IS 2189?
- IS 2189 is the Indian Standard code of practice for selecting, installing and maintaining automatic fire detection and alarm systems. The current edition is IS 2189:2026, the fifth revision, from the Fire Fighting Sectional Committee, CED 22.
What is the latest version of IS 2189?
- IS 2189:2026, published in March 2026. It replaced IS 2189:2008, which BIS withdrew on 17 September 2026.
Is IS 2189:2008 still valid?
- No. BIS withdrew it on 17 September 2026. Some state guidelines, such as Maharashtra's July 2026 Form B guidelines, still name it; ask the fire office in writing which edition it accepts.
What is the smoke detector spacing as per IS 2189?
- On a flat ceiling the code lists 7.5 m between a point and the nearest smoke detector, valid up to 7 m of ceiling height, reducing to 5 m between 7 m and 10 m (cl. 6.3.2.1, 6.3.3.1). The layout must also give one smoke detector per 100 m2 at least.
What is the heat detector spacing as per IS 2189?
- 5.3 m on a flat ceiling up to 5 m high and 3.5 m between 5 m and 10 m; heat detectors are prohibited above 10 m. At least one heat detector per 50 m2 (cl. 6.3.2.1, 6.3.3.1, 6.3.4).
At what height is a manual call point fixed under IS 2189?
- 1.4 m above the surrounding floor level, with no person more than 30 m from a call point inside, or 45 m where call points are also outside (cl. 6.4).
How often should a fire alarm system be maintained as per IS 2189?
- The user checks the panel daily, reviews the week's events weekly and tests quarterly; detectors are cleaned at least every 3 months; smoke detector sensitivity is tested twice a year and every smoke detector, heat detector and call point is tested yearly (cl. 7.4, 7.5, Table 4).
Does IS 2189:2026 allow wireless fire alarms?
- Yes, clause 4.9 allows fully wireless or hybrid systems on licence-exempt bands such as 865 to 867 MHz and 2.4 GHz. Maharashtra's circular accepts them but not in high-rise buildings.
Is IS 2189 mandatory?
- Not by itself. No Quality Control Order covered detectors or alarms on 24 October 2026. It binds when a state rule, NOC condition, tender or contract names it.
Keep reading
- Fire alarm system MCQ42 practice questions on IS 2189, every answer cited to its clause.
- IS codes for fire safetyEvery core fire standard with its current edition and QCO status.
- National Building Construction Standards 2026SP 7:2026, which sends fire command centre rules to Part 4.
- Fire AMCHow these test intervals become a maintenance contract.
- Fire auditHow an auditor checks detection and alarm against the code.
- Fire NOC for hospitalsWhere staffed alarm sequences and on-call engineers matter.
- Fire NOC for data centresAspirating detection for equipment rooms.
- Fire NOC for mallsAtriums, zoning and public address on large floors.
Keep exploring
More in Fire Safety IS Codes
Sources
Each source was opened and read on the date shown. How Flamekite checks its sources
- Bureau of Indian Standards: IS 2189:2026, Selection, Installation and Maintenance of Automatic Fire Detection and Alarm System, Code of Practice (fifth revision), March 2026; free download after registration; clause numbers cited on the page (opens in a new tab)
- Bureau of Indian Standards (BIS Know Your Standards record): BIS record for IS 2189:2026, fifth revision, superseding IS 2189:2008 (opens in a new tab)
- Bureau of Indian Standards, Know Your Standards database: Status records read 25 October 2026 for IS 2189, IS 2190, IS 15683, IS 16018, IS 3844, IS 13039, IS 15105, IS 15301, IS 9668, IS 12349, IS 3614, IS 2175 and IS 11360 (current or withdrawn, with dates) (opens in a new tab)
- Bureau of Indian Standards, Know Your Standards database: Status, publication and withdrawal dates of the fire standards named on /is-codes (IS 2190, 15683, 16018, 2189, 15105, 9972, 3844, 13039, 9668, 15301, 15908, 636, 884, 903, 5290, 9457, 3614, 11360, 2175 and others), read 24 October 2026 (opens in a new tab)
- Bureau of Indian Standards: Products under compulsory certification, Scheme-I list (orders up to S.O. 5480(E) of 6 October 2026), read 24 October 2026 (opens in a new tab)
- Bureau of Indian Standards (copy hosted by Goa Directorate of Fire and Emergency Services): SP 7:2026 National Building Construction Standards 2026, Part F: Fire and Life Safety (opens in a new tab)
- Maharashtra Fire and Emergency Services: Circular No. MFS-2026/1420, 16 October 2026: Wireless Detection System, under IS 2189:2026 clause 4.9 (number and date read from the page image) (opens in a new tab)
- Maharashtra Fire Services: Circulars (read through the entry of 16 October 2026; includes circular MFS/2017/60 of 17 May 2017 on NBC 2016 Part 4) (opens in a new tab)