SMPV(U) Rules 2016: licences, safety distances and fire protection for gas tanks
Updated By Flamekite Editorial DeskFacts checked against official sources on
Quick answer
The SMPV(U) Rules 2016 license gas tanks over 1,000 litres. Since 5 June 2026 no District Magistrate NOC is needed, and licences run up to 10 years.
The Static and Mobile Pressure Vessels (Unfired) Rules, 2016 (G.S.R. 1109(E) of 1 December 2016) are made under sections 5 and 7 of the Explosives Act, 1884 and enforced by PESO. They cover LPG, ammonia and other toxic or corrosive gases, LNG, cryogenic liquids, liquid CO2 and hydrogen in static tanks and road tankers. G.S.R. 448(E) of 5 June 2026 omitted rule 47, the District Authority NOC; the state fire service's own approval is a separate law.
Free, on WhatsApp. Or a free fire NOC check
SMPV Rules 2016 at a glance
| What | The rule | Source |
|---|---|---|
| Full name | Static and Mobile Pressure Vessels (Unfired) Rules, 2016, G.S.R. 1109(E), Gazette of India Extraordinary No. 829 of 1 December 2016 | SMPV(U) Rules 2016 |
| Parent Act | Explosives Act, 1884 (4 of 1884), sections 5 and 7; the rules replaced the SMPV(U) Rules, 1981 | SMPV(U) Rules 2016 |
| Ministry | Ministry of Commerce and Industry, Department for Promotion of Industry and Internal Trade (DPIIT) | G.S.R. 448(E), 2026 |
| Regulator | PESO: the Chief Controller of Explosives at Nagpur and the Controllers in circle and sub-circle offices | PESO SMPV SOP |
| What it covers | Storage and road transport of compressed, liquefied and cryogenic gas in metal vessels of more than 1,000 litres water capacity | SMPV(U) Rules 2016 |
| What it leaves out | Vessels inside a processing plant holding no more than 16 hours' feed, boilers, air receivers, reactors, autoclaves and heat exchangers (rules 2 and 3) | SMPV(U) Rules 2016 |
| Storage licences | LS-1A (any gas), LS-1B (auto-LPG station), LS-1C (auto-LNG station), LS-1D (liquefied hydrogen station) | G.S.R. 374(E), 2025 |
| Transport licences | LS-2 (road tanker), LS-2A (Indian ISO tank, omitted 2026), LS-2B (import or transport of an ISO tank) | G.S.R. 448(E), 2026 |
| Term | Up to 10 years since 5 June 2025, storage licences ending on 30 September (rule 51) | G.S.R. 374(E), 2025 |
| District Magistrate NOC | Rule 47 omitted by G.S.R. 448(E) of 5 June 2026, in force on publication | G.S.R. 448(E), 2026 |
| Amendments in force | 7 so far: 2018, 2019, 2021, April 2025, 5 June 2025, 25 June 2025 and 5 June 2026 | G.S.R. 448(E), 2026 |
| Applications | Online only: rule 11A (2025) puts every document and drawing on PESO's portal | G.S.R. 374(E), 2025 |
SMPV distances for cryogenic liquids and liquid CO2 (Tables 6 and 7)
| Option | Between two vessels | To a building, property line or public passage | To flammable structures, naked flame, electrics or public assembly | Source |
|---|---|---|---|---|
| Cryogenic liquid or N2O, up to 1,000 litres | 0.5 m | 2 m | 3 m | SMPV(U) Rules 2016 |
| Cryogenic liquid or N2O, 1,000 to 10,000 litres | 1 m | 3 m | 5 m | SMPV(U) Rules 2016 |
| Cryogenic liquid or N2O, above 10,000 litres | 1 m | 3 m | 7.5 m | SMPV(U) Rules 2016 |
| Liquid CO2, up to 50,000 litres | 1 m | 2 m (also to a drain) | 2 m (public assembly) | SMPV(U) Rules 2016 |
| Liquid CO2, above 50,000 litres | 2 m | 4 m (also to a drain) | 4 m (public assembly) | SMPV(U) Rules 2016 |
| Cryogenic tanker hard stand | Crash barrier at least 2 m from the vessel | 4.5 m from the property line; 3 m for vessels up to 1,000 litres | Rule 27(5)(ii)(c) and (d) | SMPV(U) Rules 2016 |
How to get an SMPV licence for a gas storage tank
Choose the form
LS-1A for a storage tank, LS-1B for an auto-LPG station, LS-1C for auto-LNG, LS-1D for liquefied hydrogen. The application for all four is Form AS-1, filed online (rule 11A).
Get the vessel and fabricator approved
The tank must be built in a PESO-approved shop to an accepted code such as IS 2825 or ASME VIII, with a test and inspection certificate from a recognised Inspector (rules 4 and 13).
File plans for prior approval
Submit plans showing the area within 100 m, or 500 m with a HAZOP and risk analysis for flammable or toxic installations above 50 t or 100 m3 a vessel, the P&ID and a registered land document, with the Rs 2,000 scrutiny fee (rule 46).
Build to the approved plan
Keep the rule 22 distances, the enclosure wall and sump, the 2 m fence with 2 exits and the rule 26 fire water and extinguishers. No District Magistrate NOC is needed since 5 June 2026.
Get the certificate of safety
A competent person or third party inspection agency recognised by the Chief Controller certifies the installation before any gas goes in (rule 33), and tests the relief valves (rule 18).
Apply for grant and endorsement
Pay the Schedule I fee. The licence comes into force when the licensing authority endorses it after inspecting the premises (rule 49(4)); it lasts up to 10 years, to 30 September.
Renew before 30 September
Apply on or before expiry and the licence continues until PESO decides. Up to 3 months late costs double; up to a year late costs a year's fee for each 3 months; after a year, start again (rule 55).
SMPV Rules amendments, 2016 to June 2026
Seven amendments have changed the 2016 rules. The 5 June 2026 notification lists the first six and adds the seventh.
13 October 2015
Draft rules published as G.S.R. 778(E) for 45 days of objections. SMPV(U) Rules 2016
1 December 2016
G.S.R. 1109(E) makes the SMPV(U) Rules, 2016, replacing the 1981 rules, in force on publication. SMPV(U) Rules 2016
20 April 2018
G.S.R. 388(E): auto-LNG stations, Form LS-1C and a new Schedule IV for LNG (drafted as G.S.R. 887(E) in July 2017). LegitQuestnews report
13 November 2018
Draft G.S.R. 1110(E) proposes freeing an auto-LPG station inside a licensed petrol pump from the rule 47 NOC. Draft G.S.R. 1110(E)
25 February 2019
G.S.R. 148(E) brings an LS-1B auto-LPG licence at a Form XIV petrol pump under rule 47(1), the District Authority NOC rule. G.S.R. 148(E), 2019
31 August 2021
G.S.R. 609(E): third party inspection agencies, ISO tank containers, a 2-month deemed NOC, and online licence copies. G.S.R. 609(E), 2021
28 April 2025
G.S.R. 283(E) adds a table C of inspection and certification fees to Schedule I, such as Rs 5,000 for the periodic test of a Horton sphere or a mounded vessel. Five weeks later G.S.R. 374(E) substituted the whole Schedule I with Parts A and B only, so table C is not in the text as it now reads. G.S.R. 283(E), 2025
5 June 2025
G.S.R. 374(E): new fees with MSE, startup and women rates, 10-year licences, online filing, Form LS-1D and Schedule V for liquefied hydrogen. G.S.R. 374(E), 2025
25 June 2025
G.S.R. 422(E): ASME VIII Division 3 and 4 ISO hydrogen standards for vessels. G.S.R. 422(E), 2025
24 February 2026
Draft G.S.R. 147(E) proposes omitting rule 47; copies public on 25 February 2026. Draft G.S.R. 147(E)
5 June 2026
G.S.R. 448(E) omits rule 47, lets ISO tanks serve as storage and allows 9 mounded vessels in a group. G.S.R. 448(E), 2026
What G.S.R. 448(E) did to the SMPV District Magistrate NOC
The 2026 amendment removed the District Authority's no-objection certificate in one sentence, in force from 5 June 2026.
Word for word
In the said rules, rule 47 shall be omitted.
Rule 47 had asked every new applicant, except for non-toxic non-flammable gas and road tankers, to get a certificate from the District Magistrate or Police Commissioner, first within 4 months, from 2021 within 2 months or deemed issued, and from 2025 online through PESO's LSDA system. The same notification dropped the NOC from licence transfers (rule 54(2)(e)) and from Form LS-2. The Gas Cylinders Rules lost their NOC, rule 48, the same day; the Petroleum Rules' rule 144 NOC stands.
Which vessels and gases the SMPV Rules cover
The line is water capacity: a metal vessel for compressed gas holding over 1,000 litres is a pressure vessel; at or below it, a cylinder.
- Pressure vessel
- A closed metal container for storing or transporting compressed gas under pressure, with a water capacity over 1,000 litres, including its connecting parts to the first joint (rule 2(xxxvii)). SMPV(U) Rules 2016
- Gas cylinder (not covered)
- A container over 500 ml up to 1,000 litres; CNG, nitrogen or air cylinders up to 3,000 litres if no wider than 60 cm. These fall under the Gas Cylinders Rules (rule 2(xv)). SMPV(U) Rules 2016
- Cryogenic pressure vessel
- A tank for liquids boiling below minus 150 °C, including a permanently installed cryogenic tank of 1,000 litres or less (rule 2(xiv)). SMPV(U) Rules 2016
- Compressed gas
- Any permanent, liquefiable or cryogenic gas at over 1 atmosphere gauge at its maximum working temperature, taken as 55 °C for an uninsulated vessel (rule 2(ix)). SMPV(U) Rules 2016
- Flammable compressed gas
- A gas that forms a flammable mixture at 13% or less in air, or has a flammable range wider than 12% (rule 2(xxiv)). SMPV(U) Rules 2016
- Mounded vessel
- An above-ground tank fully covered by earth or inert material except its nozzles and manholes (rule 2(xxxiii)). SMPV(U) Rules 2016
- Processing-plant exemption
- Vessels inside a process plant are outside the rules if they hold no more than 16 hours of feed at the design flow (rule 3). SMPV(U) Rules 2016
- Not pressure vessels
- Boilers and fired heaters, heat exchangers, evaporators, air receivers, digesters, sterilisers, autoclaves, reactors and calorifiers (rule 2(xxxvii)). SMPV(U) Rules 2016
- Gas groups licensed
- PESO lists 8: corrosive, toxic or permanent flammable; inert; liquefied flammable; LPG; auto-LPG; LNG; cryogenic liquids and N2O; liquid CO2. PESO SMPV SOP
SMPV licence forms LS-1A to LS-2B and who grants them
Every storage licence now runs up to 10 years and ends on 30 September; PESO's 2024 SOP says which office grants each.
Head Office, Nagpur
LS-1A, flammable, toxic or corrosive gas
Storage of LPG, ammonia, hydrogen and other flammable, toxic or corrosive gases in tanks, including LPG for bottling. Granted at PESO's head office; endorsed and inspected by the circle office. PESO SMPV SOP
Circle office
LS-1A, inert, cryogenic or CO2
Storage of nitrogen, oxygen, argon, liquid CO2 and other non-flammable gases. Granted by the circle office; endorsed by the sub-circle office. PESO SMPV SOP
Circle office
LS-1B, auto-LPG dispensing station
Storage and sale of auto-LPG to vehicles; since 2025, the premises may be part of a Form XIV petrol pump only (condition 1a). G.S.R. 374(E), 2025
Head Office, Nagpur
LS-1C, auto-LNG or LCNG station
Added in 2018 for LNG dispensing; may share a Form XIV petrol pump that holds no other PESO licence (condition 1a, 2025). G.S.R. 374(E), 2025
Added 2025
LS-1D, liquefied hydrogen station
Storage and dispensing of liquefied hydrogen, or its storage for a compressed hydrogen station; same fee as LS-1A. G.S.R. 374(E), 2025
Circle or sub-circle
LS-2, road tanker
Transport of compressed gas in a pressure vessel by road; up to 10 years from grant since June 2025. Railways need no licence (rule 48). G.S.R. 374(E), 2025
Head Office, Nagpur
LS-2B, ISO tank container
Since 5 June 2026, one permission to import and/or transport an ISO tank of compressed gas, valid up to 10 years; Form LS-2A was omitted. G.S.R. 448(E), 2026
SMPV licence fees under Schedule I since 5 June 2025
G.S.R. 374(E) kept the standard fees and added lower rates for micro and small enterprises, startups and women entrepreneurs.
As published
- LS-1A, total water capacity up to 5,000 litresRs 5,000MSE or startup Rs 2,500; women entrepreneur Rs 1,000 G.S.R. 374(E), 2025
- LS-1A, each further 1,000 litres or partRs 2,500, to a maximum of Rs 50,000MSE or startup Rs 1,250 to Rs 25,000; women Rs 500 to Rs 10,000 G.S.R. 374(E), 2025
- LS-1B, LS-1C and LS-1DSame as LS-1A G.S.R. 374(E), 2025
- LS-2 road tankerRs 5,000MSE or startup Rs 2,500; women Rs 1,000 G.S.R. 374(E), 2025
- Prior approval of plans (rule 46)Rs 2,000Rs 1,000 MSE or startup; Rs 400 women G.S.R. 374(E), 2025
- Approval of an alteration (rule 53)Rs 2,000 G.S.R. 374(E), 2025
- Amendment, transfer, authenticated or duplicate copyRs 1,000 each G.S.R. 374(E), 2025
- ISO tank container permission (item 15)Rs 5,000 a year G.S.R. 374(E), 2025
- Renewal up to 3 months lateTwice the normal fee3 months to 1 year late: one year's fee for every 3 months or part SMPV(U) Rules 2016
Renewal costs the grant fee for every 12 months (rule 55(7)). A woman-owned MSE pays whichever rate is lower; a women entrepreneur holds at least 26% of the capital. Fees are paid online only, PESO's FAQ says.
SMPV safety distances by gas and tank size (Tables 1 to 3)
Rule 22 sets the gap from each tank to the nearest building or the line of adjoining property, by gas and water capacity. Read off the 2016 Gazette page images.
| Toxic, corrosive or permanent flammable gas (Table 1) | Inert gas (Table 2) | LPG and liquefied flammable gas, above ground (Table 3) | Liquefied flammable gas, mounded or underground (Table 3) | |
|---|---|---|---|---|
| Up to 2,000 litres SMPV(U) Rules 2016 | 5 m | 3 m | 5 m | 3 m |
| 2,000 to 7,500 litres SMPV(U) Rules 2016 | 10 m | 5 m | 10 m | 3 m |
| 7,500 to 10,000 litres SMPV(U) Rules 2016 | 10 m | 5 m | 10 m | 5 m |
| 10,000 to 20,000 litres SMPV(U) Rules 2016 | 15 m | 7.5 m | 15 m | 7.5 m |
| 20,000 to 40,000 litres SMPV(U) Rules 2016 | 20 m | 10 m | 20 m | 10 m |
| 40,000 to 3,50,000 litres SMPV(U) Rules 2016 | 30 m | 15 m | 30 m | 15 m |
| 3,50,000 to 4,50,000 litres SMPV(U) Rules 2016 | 30 m | 15 m | 40 m | 15 m |
| 4,50,000 to 7,50,000 litres SMPV(U) Rules 2016 | 30 m | 15 m | 60 m | 15 m |
| 7,50,000 to 38,00,000 litres SMPV(U) Rules 2016 | 30 m | 15 m | 90 m | 15 m |
| Above 38,00,000 litres SMPV(U) Rules 2016 | 30 m | 15 m | 120 m | 15 m |
Between tanks: 1 to 2 m by size; above-ground liquefied flammable tanks over 40,000 litres need 2 m or a quarter of the sum of the two diameters, whichever is greater, and mounded or buried tanks 1 m. An installation of 40,000 litres in all keeps 30 m (15 m mounded or inert). A group holds at most 6 above-ground tanks, or 9 mounded since 5 June 2026, each group on its own licence. Distances run from the nearest point of the tank, and the Chief Controller may relax them for extra safety measures. PESO's 2024 SOP cites "Table 5A" and "5B", so a later amendment may have renumbered the bottling and auto-LPG tables.
SMPV licence and the state fire NOC for a gas installation
The SMPV licence is PESO's; the fire NOC comes from the state fire law. A bulk gas site usually needs both, and the 2026 change removed only the District Magistrate's certificate.
The SMPV Rules make PESO the licensing authority for the tank, its distances and its fire fighting kit. Rule 26 itself asks for water and fire protection "in accordance with the provision of the rules and the regulation applicable in that area", which brings the local fire code into the design.
Four duties tie the licence to the fire service. Every licensed premises displays the emergency numbers of the local fire service (rule 62 and Form LS-1A condition 3). An auto-LPG station's written emergency plan is drawn up in consultation with the fire services (Schedule II, item N). An LNG installation keeps the Fire Department informed of its emergency plan. And any accident is reported to PESO, the police and the District Authority at once (rule 67).
What the state fire service asks on top, its NOC thresholds and fees, is set by each state's fire Act. Flamekite's pages for LPG godowns, petrol pumps, factories and industries cover that route for each occupancy.
| What | The rule | Source |
|---|---|---|
| Rule 26(i) | Fire water and protection per the rules and regulations applicable in the area | SMPV(U) Rules 2016 |
| Rule 62 and LS-1A condition 3 | Emergency numbers of the local fire service displayed | SMPV(U) Rules 2016 |
| Schedule II (N) | Auto-LPG emergency plan drawn up with the fire services and tested from time to time | SMPV(U) Rules 2016 |
| Form LS-1A, LNG conditions | Liaison with Police, Fire Department and Health Authorities on the emergency plan | SMPV(U) Rules 2016 |
| Rule 47 (omitted 2026) | District Authority NOC no longer needed for a new licence | G.S.R. 448(E), 2026 |
Auto-LPG dispensing stations under the SMPV Rules
Schedule II and Table 5 set an auto-LPG station's layout, from the tank to the dispenser and the petrol pump beside it.
Storage tank
At most 2 tanks of up to 20 m3 each, designed for at least 14.5 kg/cm2; underground tanks sit in a kerbed, fenced area 3 m beyond the tank's outline. SMPV(U) Rules 2016
Tanker unloading
No more than 2 unloadings a day, each under 60 minutes, by a smart hose of up to 5.5 m; no dispensing to vehicles meanwhile (rule 30). SMPV(U) Rules 2016
Fill point and hard stand
9 m from an above-ground or mounded tank over 7,500 litres, 6 m for smaller ones, 3 m for an underground tank; 9 m from the property line. SMPV(U) Rules 2016
LPG dispenser
9 m from an above-ground tank up to 20,000 litres or any mounded or buried tank, 15 m from a larger above-ground tank, 6 m from the property line; emergency switches at least 6 m away. SMPV(U) Rules 2016
Petrol pump next door
The LPG tank keeps 9 m from the petrol fill point, vent pipe and dispenser; the LPG dispenser 6 m from each. Since 2025 the station may be part of a Form XIV premises only. G.S.R. 374(E), 2025
Hazardous zones
Zone 1 inside the dispenser and 46 cm around it up to 122 cm high; zone 2 up to 6 m around, 46 cm above ground (rule 32B). SMPV(U) Rules 2016
Fire kit
2 x 9 kg DCP at the unloading area and 1 at each dispenser and pump; underground tanks add 2 large DCP units; above-ground tanks need hydrants at 7 kg/cm2, sprinklers and 1 hour of water. SMPV(U) Rules 2016
Mounded and underground LPG tanks under SMPV Schedule III
Schedule III sorts mounded tanks into 3 categories by size and sets the cover, clearances and fire kit for each.
100 KL
Upper limit of Category 1 mounded tanks: 3 m clear around the mound, 0.5 m of earth, 1 hydrant or monitor at 15 m SMPV(U) Rules 2016
500 KL
Upper limit of Category 2: 3.5 m clear, 0.7 m of earth, 9 m to pump rooms, 2 hydrants or monitors SMPV(U) Rules 2016
15 m
Pump room or vaporiser distance from a Category 3 tank over 500 KL, whose hydrants follow OISD-150 SMPV(U) Rules 2016
2
Extinguishers of 75 kg each at a mounded installation, beside gas leak detection, sprinklers and hydrants SMPV(U) Rules 2016
30 seconds
Maximum closing time of the fire-safe remote operated valves on the liquid lines SMPV(U) Rules 2016
10 years
Between hydraulic tests of a mounded or buried tank; internal inspection with NDT every 5 years SMPV(U) Rules 2016
500 mm
Minimum soil cover over a buried tank, set in a pit with 1 m clearance all round SMPV(U) Rules 2016
9
Mounded tanks allowed in one group since 5 June 2026, against 6 above-ground tanks G.S.R. 448(E), 2026
SMPV fire protection: water spray, hydrants, detectors and extinguishers
Rule 26 and the schedules set the fire fighting for flammable gas tanks; the size of the plant sets how much water.
- Medium velocity sprinklers on above-ground tanks, filling sheds, loading areas and pump sheds at 10 litres a minute per m2 of the largest single risk, plus hydrants (rule 26(i)) SMPV(U) Rules 2016
- Fire water for 4 hours at plants of over 100 t of liquefied flammable gas, 2 hours at plants up to 100 t, and as the Chief Controller approves elsewhere (rule 26(i)) SMPV(U) Rules 2016
- Water flow controlled from outside the danger area; hydrants spaced to reach every tank; hoses with jet and fog nozzles (rule 26(i) to (iii)) SMPV(U) Rules 2016
- Spray or monitors able to keep a film of water over the tank and its supports in a fire (rule 26(iv)) SMPV(U) Rules 2016
- At least 2 x 9 kg DCP extinguishers at each access point (rule 26(vi)), and 2 x 9 kg foam or DCP extinguishers on every LS-1A premises (condition 16) SMPV(U) Rules 2016
- Fire water pump room 60 m from tanks at plants over 100 t, 30 m at smaller bottling plants (Table 4) SMPV(U) Rules 2016
- Gas leak detection at mounded installations (Schedule III, item 8) SMPV(U) Rules 2016
- LNG: gas detectors alarming at no more than 25% of the lower explosive limit, fire detectors, at least 4 x 10 kg extinguishers and manual shutdown 15 m from the equipment SMPV(U) Rules 2016
- LNG since 2018: fire water of 10% of the LNG tank capacity or 5,000 litres, whichever is higher LegitQuestnews report
- A 2 m industrial fence with at least 2 outward-opening exits and no-smoking notices in letters of 5 cm or more (rule 24) SMPV(U) Rules 2016
- Steel supports taller than 45 cm encased in fire-resisting material (rule 23(6)(v)) SMPV(U) Rules 2016
- An enclosure wall of 30 to 60 cm round above-ground liquefied flammable, toxic or corrosive tanks, draining to a sump 15 m away for tanks over 40,000 litres (rule 21(10), (11)) SMPV(U) Rules 2016
SMPV periodic testing: which test and how often
Rule 19 and Schedule III set the test interval by gas and installation; a recognised competent person or inspection agency issues the certificate online.
If An ordinary tank for flammable or inert gas
Hydraulic test at the marked pressure at least every 5 years, with internal inspection and residual thickness measurement (rule 19(1)(a)). SMPV(U) Rules 2016
If A tank for corrosive or toxic gas, such as chlorine or ammonia
The same test every 2 years (rule 19(1)(a)). SMPV(U) Rules 2016
If A flammable, corrosive or toxic gas tank over 100 KL
Non-destructive testing of the welds on top of the hydraulic test (rule 19(1)(b)). SMPV(U) Rules 2016
If A cryogenic tank, or a stainless steel liquid CO2 tank
Pneumatic test at 1.1 times the maximum allowable working pressure; carbon steel CO2 tanks are tested hydraulically (rule 19(3)). SMPV(U) Rules 2016
If A mounded or underground tank
Internal inspection with NDT every 5 years and a hydraulic test every 10 years (Schedule III). SMPV(U) Rules 2016
If An ammonia Horton sphere
First inspection after 2 years, the second 3 years later, then NDT and hydro test every 5 years (rule 19(5)). SMPV(U) Rules 2016
If Relief valves, excess flow and remote valves
Relief valves tested once a year; excess flow and remote valves at each periodic test, and yearly on road tankers (rule 18). SMPV(U) Rules 2016
If A hydrogen tank
Fitness for service assessed to API 579 as well (rule 19, proviso added 25 June 2025). G.S.R. 422(E), 2025
Filling and unloading a tank under the SMPV Rules: dos and don'ts
Rules 27 and 28 and the licence conditions govern every transfer; most are checks before the first valve opens.
Do
- Check the receiving tank has ullage and the hoses and valves are sound before transfer (rule 28(1)). SMPV(U) Rules 2016
- Bond the tanker to the installation before transferring flammable gas; since 2025, bonded systems test under 1 ohm to earth (rules 28(4), 25). G.S.R. 374(E), 2025
- Keep a trained person present throughout and weigh a liquefiable-gas tanker before it leaves (rule 28(3), (5)). SMPV(U) Rules 2016
- Keep tanker hard stands 9 m from the property line and the tank at LPG and other flammable installations (rule 27(5)). SMPV(U) Rules 2016
Don’t
- Don't transfer during a leak, a fire nearby or, when venting flammable gas, an electrical storm (rule 28(6)). SMPV(U) Rules 2016
- Don't fill between sunset and sunrise without approved lighting endorsed on the licence (LS-1A condition 14). SMPV(U) Rules 2016
- Don't allow any light able to ignite vapour within 9 m of the tanker during transfer (LS-1A condition 21). SMPV(U) Rules 2016
- Don't employ anyone under 18 or intoxicated in loading, unloading or transport (rule 8). SMPV(U) Rules 2016
Penalties for breaking the SMPV Rules under the Explosives Act
The rules carry the Explosives Act's penalties; the amounts are the 1983 figures, and PESO can also suspend or cancel the licence.
| Offence | Penalty | Law |
|---|---|---|
| Storing, using or transporting gas against the rules or the licence conditions | Up to 2 years, or a fine up to Rs 3,000, or both | Explosives Act s.9B(1)(b) Explosives Act 1884 |
| Making, importing or exporting against the rules | Up to 3 years, or a fine up to Rs 5,000, or both | s.9B(1)(a) Explosives Act 1884 |
| Any other breach of the rules | Fine up to Rs 1,000 | s.9B(1)(c) Explosives Act 1884 |
| Not giving notice of an accident | Fine up to Rs 500; up to 3 months or a fine, or both, if a life is lost | s.9B(3)(c) with rule 67 Explosives Act 1884 |
| An offence by a company | The company and every person in charge, unless they show due diligence | s.9C Explosives Act 1884 |
| Breach of the Act, rules or licence conditions | Suspension for up to 3 months, or cancellation, after a hearing | Rule 57 SMPV(U) Rules 2016 |
| Losing the right to the site | Licence stands cancelled | Rule 57(4), added 2025 G.S.R. 374(E), 2025 |
Form AS-2 makes the applicant sign that a breach is punishable with up to 2 years or Rs 3,000. Flamekite found no Jan Vishwas Act amending the Explosives Act by 25 October 2026. Appeals go to the Chief Controller or the Central Government within 60 days (rule 59).
SMPV licence worked examples: 6 installations
Flamekite's reading of the rules for six sites. PESO's approved plan decides.
Case 1
An LPG tank at a ceramics factory
One above-ground LPG bullet of 20,000 litres feeding kilns
What applies LS-1A from PESO's head office; 15 m to the nearest building or boundary under Table 3, 2 x 9 kg DCP at each access, sprinklers at 10 lpm/m2 and hydro tests every 5 years. Fee Rs 42,500: Rs 5,000 plus 15 x Rs 2,500. G.S.R. 374(E), 2025
Case 2
A hospital's liquid oxygen tank
A 10,000-litre cryogenic oxygen tank in the hospital yard
What applies Over 1,000 litres, so LS-1A from the circle office: 3 m to buildings and 5 m from naked flames or electrics (Table 6), tanker stand 4.5 m from the boundary and a pneumatic test at 1.1 times working pressure. SMPV(U) Rules 2016
Case 3
A small nitrogen tank
A 900-litre tank installed permanently for liquid nitrogen
What applies Still covered: a permanently installed cryogenic tank of 1,000 litres or less is a cryogenic pressure vessel. Table 6 needs 2 m to the boundary. SMPV(U) Rules 2016
Case 4
An auto-LPG station at a petrol pump
One underground 20 m3 tank and 2 dispensers at a Form XIV outlet
What applies LS-1B; 3 m from tank to fill point, 9 m from tank to the petrol dispensers, 2 large DCP units for the buried tank. No District Magistrate NOC for the LS-1B since 5 June 2026. G.S.R. 448(E), 2026
Case 5
A chlorine store at a water works
Two 30,000-litre chlorine tanks
What applies Table 1 sets 20 m to buildings and 2 m between tanks; a hydraulic test every 2 years as a toxic gas. SMPV(U) Rules 2016
Case 6
A women-led MSE storing CO2
One 12,000-litre liquid CO2 tank
What applies LS-1A at the women-entrepreneur rate: Rs 1,000 plus 7 x Rs 500, so Rs 4,500; 2 m to buildings under Table 7. G.S.R. 374(E), 2025
SMPV changes PESO announced in 2026
From news reports, not yet an official source.
As of 25 October 2026 the last final amendment is G.S.R. 448(E) of 5 June 2026. PESO has opened these consultations since.
20 August 2026
Draft SOP for fabricators, inspectors and LS-2 transporters: records kept 10 years, CCTV of stage inspections, no reused relief valves, and at most 4 Certificates of Control a month per inspector. PESO draft SOP 2026
5 June 2026
Rule 47 omitted; ISO tank containers allowed as anchored above-ground storage, certified by a structural engineer (rule 21(17)). G.S.R. 448(E), 2026
24 February 2026
Draft G.S.R. 147(E) published with 30 days for objections; the final rules followed it on the NOC. Draft G.S.R. 147(E)
SMPV licence myths, checked against the rules
You may have read
An SMPV storage licence is valid for 5 years.
Myth
What the sources say
It was. Since G.S.R. 374(E) of 5 June 2025, rule 51 allows up to 10 years, still ending on 30 September; PESO's own 2024 FAQ predates the change. G.S.R. 374(E), 2025
You may have read
A new LPG tank still needs the District Magistrate's NOC.
Myth
What the sources say
Rule 47 was omitted on 5 June 2026 by G.S.R. 448(E). A petrol pump's rule 144 NOC under the Petroleum Rules is a different rule and stands. G.S.R. 448(E), 2026
You may have read
Small cryogenic tanks under 1,000 litres are outside the rules.
Myth
What the sources say
A permanently installed cryogenic tank of 1,000 litres or less is defined as a cryogenic pressure vessel (rule 2(xiv)). SMPV(U) Rules 2016
You may have read
An air receiver or reactor needs an SMPV licence.
Myth
What the sources say
Rule 2(xxxvii) excludes air receivers, reactors, autoclaves and heat exchangers; process vessels under 16 hours of feed are exempt by rule 3. SMPV(U) Rules 2016
You may have read
Holding a PESO licence means the fire service has approved the site.
Myth
What the sources say
PESO licenses the tank. Rule 26 still points to the fire regulations of the area, and the state fire NOC follows the state's fire law. SMPV(U) Rules 2016
Where to read the SMPV Rules and apply for an SMPV licence
The official texts, the licensing portal and the offices that decide.
Rules
PESO: SMPV (U) Rules 2016
The 143-page bilingual Gazette text of 2016, with pages for the 2021, 2025 and 2026 amendments. PESO rules page
peso.gov.in/web/en/smpv-u-rules-20162026 amendment
eGazette of India
G.S.R. 448(E) of 5 June 2026, which omitted rule 47, as gazetted. G.S.R. 448(E), 2026
egazette.gov.in/WriteReadData/2026/273192.pdfApply
PESO Online
Applications, fees, renewals and licence copies for LS-1A to LS-2B (login). PESO Online
online.peso.gov.in/PesoOnlineApply
National Single Window System
PESO approvals filed through the national single window. NSWS
www.nsws.gov.in/portal/pesoDocuments
PESO SOP for the SMPV Rules
The 16-page list of documents for each transaction and which office grants each form. PESO SMPV SOP
peso.gov.in/web/sites/default/files/2024-12/SOP%20for%20SMPV%28U%29%20Rules%2C%202016-Final%20-%2002.12.2024.pdfOffices
PESO contact page
Head office at Nagpur and the circle and sub-circle offices that grant and endorse licences. PESO contacts
peso.gov.in/web/index.php/en/contact-us
What Flamekite could not confirm about the SMPV Rules
Gaps a reader would expect us to fill, and what to do until they are filled.
If PESO's 2024 SOP cites Tables 5A and 5B where the 2016 text has Tables 4(B) and 5
The 2019 and April 2025 amendments, read on the eGazette on 26 October 2026, do not touch the distance tables, so the gap is not explained by them. Ask the Controller which table applies before designing. PESO SMPV SOP
If The Gazette copy of the 2018 amendment
Read from a legal database, not the Gazette; its LNG fire water figure is labelled as such. LegitQuestnews report
If Whether rules 50(vi) and 55(8), which still mention the District Authority NOC, were cleaned up
The 2026 notification omits rule 47 but does not touch them. With rule 47 gone they have nothing to refer to; confirm with PESO if a renewal is refused for want of a NOC. G.S.R. 448(E), 2026
If Two figures in the 2016 text disagree with each other
Rule 26(vii) asks 2 x 70 kg DCP at a buried auto-LPG tank, Schedule III 2 x 75 kg; Form LS-1B condition 13 swaps rule 32B's zones 1 and 2. Flamekite follows the rules over the form; fit the larger extinguisher. SMPV(U) Rules 2016
If Whether a Jan Vishwas Act changed section 9B of the Explosives Act
None found by 25 October 2026; the amounts shown are from PESO's copy of the Act. Explosives Act 1884
Questions about the SMPV(U) Rules
What are the SMPV Rules 2016?
- The Static and Mobile Pressure Vessels (Unfired) Rules, 2016, made under the Explosives Act, 1884 on 1 December 2016. They make PESO license the storage and road transport of compressed, liquefied and cryogenic gas in vessels over 1,000 litres.
Which licence do I need for an LPG storage tank?
- Form LS-1A, applied for in Form AS-1 on PESO's portal; an auto-LPG station needs LS-1B instead. Flammable gas LS-1A licences are granted at PESO's head office in Nagpur and endorsed after a circle office inspection.
Is the District Magistrate NOC still required for an SMPV licence?
- No. G.S.R. 448(E) of 5 June 2026 omitted rule 47, so a new storage licence no longer needs the District Authority's certificate. The state fire NOC and a petrol pump's rule 144 NOC are separate.
How long is an SMPV licence valid?
- Up to 10 years since 5 June 2025, and a storage licence ends on 30 September of its last year. Renew before it expires; a renewal up to 3 months late costs twice the fee.
What is the safety distance for an LPG bulk storage tank?
- It depends on size: 5 m up to 2,000 litres above ground, 15 m from 10,000 to 20,000 litres, 30 m from 40,000 to 3,50,000 litres, up to 120 m for the largest. Mounded or buried tanks need 3 m to 15 m.
Do I need a licence for a cryogenic oxygen or nitrogen tank?
- Yes, if it holds more than 1,000 litres, or if it is a permanently installed cryogenic tank of any size. It takes Form LS-1A from the PESO circle office and keeps the Table 6 distances.
How often must an LPG pressure vessel be tested?
- An above-ground tank is hydraulically tested at least every 5 years, and every 2 years for toxic or corrosive gas. Mounded and buried tanks have an internal inspection every 5 years and a hydraulic test every 10.
Keep reading
- SMPV Rules MCQ40 practice questions on licences, relief valves, distances and tests, each cited.
- Fire NOC for LPG godownsCylinder godowns, Form F and their fire NOC route.
- Fire NOC for petrol pumpsForm XIV, the rule 144 NOC and auto-LPG stations.
- Fire NOC for industriesThe state fire approval a plant with gas tanks needs.
- Fire NOC for factoriesFactory fire NOC lines state by state.
- New fire safety rules in 2026The June 2026 NOC omissions beside every other change this year.
- Fire NOC penaltiesWhat the state fire laws charge on top of the Explosives Act.
- Free fire NOC checkWhether your site needs a state fire NOC as well.
Keep exploring
More in Fire safety norms (India)
Sources
Each source was opened and read on the date shown. How Flamekite checks its sources
- Petroleum and Explosives Safety Organisation (PESO), DPIIT: bilingual copy of the Gazette text: Static and Mobile Pressure Vessels (Unfired) Rules, 2016: auto-LPG dispensing stations, Form LS-1B, rule 51 validity and the Schedule I fees (opens in a new tab)
- Gazette of India Extraordinary, Part II Section 3(i), No. 401, 5 June 2026 (Ministry of Commerce and Industry, DPIIT): Static and Mobile Pressure Vessels (Unfired) (Amendment) Rules, 2026, G.S.R. 448(E) of 5 June 2026: rule 47 omitted, rule 21(17) ISO tank storage, 9 mounded vessels a group, Form LS-2B substituted, and the list of earlier amendments (opens in a new tab)
- Gazette of India Extraordinary, Part II Section 3(i), 26 February 2019 (Ministry of Commerce and Industry, DIPP; eGazette ID 198796): Static and Mobile Pressure Vessels (Unfired) (Amendment) Rules 2019, G.S.R. 148(E) of 25 February 2019: rule 47(1) extended to a Form LS-1B licence at a service station licensed in Form XIV under the Petroleum Rules, 2002 (opens in a new tab)
- Gazette of India Extraordinary, Part II Section 3(i), 1 May 2025 (Ministry of Commerce and Industry, DPIIT; eGazette ID 262837): Static and Mobile Pressure Vessels (Unfired) Amendment Rules, 2025, G.S.R. 283(E) of 28 April 2025: Schedule I heading rules list widened and a table C of fees for inspection, testing and certification by an Inspector, competent person or TPIA inserted (opens in a new tab)
- Gazette of India Extraordinary, 5 June 2025 (copy hosted by Petroleum and Explosives Safety Organisation (PESO), DPIIT): Static and Mobile Pressure Vessels (Unfired) (Amendment) Rules, 2025, G.S.R. 374(E) of 5 June 2025: Schedule I substituted with MSE, startup and women-entrepreneur fees, 10-year licences, rule 11A online filing, rule 47(1A), (1B), (7) and (8), Form LS-1D and Schedule V for liquefied hydrogen (opens in a new tab)
- Petroleum and Explosives Safety Organisation (PESO), DPIIT: Standard Operating Procedure for granting approval and licences under the SMPV(U) Rules, 2016, 2 December 2024: forms by purpose, documents, safety-distance tables and delegation to head, circle and sub-circle offices (opens in a new tab)
Show all 20 sourcesShow fewer
- Petroleum and Explosives Safety Organisation (PESO), DPIIT: FAQs on the SMPV(U) Rules, 2016 (August 2024): licence, renewal and late fees, testing, fees accepted online only (opens in a new tab)
- Petroleum and Explosives Safety Organisation (PESO), DPIIT: text of the Act as amended by Act 32 of 1978: The Explosives Act, 1884: sections 5, 8, 9, 9A, 9B (punishment for contravening rules or licence conditions) and 9C (offences by companies) (opens in a new tab)
- Gazette of India Extraordinary, Part II Section 3(i), No. 142, 4 March 2024 (Ministry of Petroleum and Natural Gas; copy hosted by PESO): Petroleum (Amendment) Rules, 2024 (G.S.R. 154(E)): rule 144(6a), the new NOC proforma with fire department comments, rules 117, 122, 126, 130, Form XIV conditions and the Part C fees (opens in a new tab)
- Gazette of India Extraordinary, Part II Section 3(i), 5 June 2026: Gas Cylinders (Second Amendment) Rules, 2026, G.S.R. 447(E) of 5 June 2026: rule 48 omitted, the District Authority NOC dropped from Form C, Form F condition 8A (opens in a new tab)
- Gazette of India Extraordinary, 13 November 2018, scanned (copy hosted by Petroleum and Explosives Safety Organisation (PESO), DPIIT): Draft Static and Mobile Pressure Vessels (Unfired) (Second Amendment) Rules, 2018, G.S.R. 1110(E): rule 47 exemption proposed for an auto-LPG station inside a Form XIV petrol pump (opens in a new tab)
- Gazette of India Extraordinary, 31 August 2021 (copy hosted by Petroleum and Explosives Safety Organisation (PESO), DPIIT): Static and Mobile Pressure Vessels (Unfired) (Amendment) Rules, 2021, G.S.R. 609(E) of 31 August 2021: third party inspection agencies, ISO tank containers, rule 47(7) deemed NOC after 2 months, rule 61 online licence copy (opens in a new tab)
- Gazette of India Extraordinary, 25 June 2025 (copy hosted by Petroleum and Explosives Safety Organisation (PESO), DPIIT): Static and Mobile Pressure Vessels (Unfired) (Amendment) Rules, 2025, G.S.R. 422(E) of 25 June 2025: ASME Section VIII Division 3 and hydrogen standards in rules 13, 18, 19 and 38 (opens in a new tab)
- Gazette of India Extraordinary, 24 February 2026 (copy hosted by Petroleum and Explosives Safety Organisation (PESO), DPIIT): Draft Static and Mobile Pressure Vessels (Unfired) (Amendment) Rules, 2026, G.S.R. 147(E) of 24 February 2026: rule 47 proposed for omission, 30 days for objections (opens in a new tab)
- Petroleum and Explosives Safety Organisation (PESO), DPIIT: Stakeholder consultation on the draft SOP and terms of reference under the SMPV Rules 2016, 20 August 2026: fabricators, inspectors and LS-2 transporters (opens in a new tab)
- Petroleum and Explosives Safety Organisation (PESO), DPIIT: SMPV (U) Rules 2016 on PESO's Acts and Rules pages, with the 2018, 2021, 2024 draft, 2025 and 2026 amendment pages (opens in a new tab)
- Petroleum and Explosives Safety Organisation (PESO): PESO Online: licensing portal for the Petroleum, Gas Cylinders and SMPV(U) Rules (login page) (opens in a new tab)
- National Single Window System, Government of India: NSWS: PESO approvals and licences filed through the national single window (opens in a new tab)
- Petroleum and Explosives Safety Organisation (PESO), DPIIT: Contact us: head office at Nagpur and the circle and sub-circle offices with addresses, phones and email (opens in a new tab)
- LegitQuest (legal database copy of the amendment text): Static and Mobile Pressure Vessels (Unfired) (Amendment) Rules, 2018: auto-LNG definitions, Form LS-1C, Schedule IV for LNG substituted (draft G.S.R. 887(E), 17 July 2017) (opens in a new tab)